HomeMy WebLinkAbout7945.04 E 2023 1117Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 1117 2023 Date Fri 11/17/2023 Weather Clear Skies, 37°F Arrival/Departure Time(s) 9:15am – 1:45pm Travel Time (hr)1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Maricel Fee, (425) 984-9615 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was on site to observe and test installation of Hot Mix Asphalt (HMA) along Lincoln Ave NE and NE 40th St. While on site the following was observed: ESNW rep. observed the contractor installing the final 2 inch lift of HMA asphalt in the inside lane along Lincoln Ave NE and along NE 40th St. ESNW rep. observed that contractor lay the asphalt and then rollover the material with multiple vibratory rollers. ESNW rep. determined that the contractor continued to compact them entire area with the roller while the asphalt was placed. Rep took compaction tests on the SG of asphalt after it was placed and compacted. Density test results indicate adequate compaction of at least 92% at the tested locations. Please see attached map for approximate test locations. Test Number Test Location Elevation Rice Value (pcf) Test Density (pcf) % of Rice Value 166 Lincoln Ave NE HMA SG 155.3 148.0 95 167 NE 40th St HMA SG 155.3 145.4 94 168 NE 40th St HMA SG 155.3 145.2 93 169 NE 40th St HMA SG 155.3 147.3 95 170 NE 40th St HMA SG 155.3 142.4 92 Report ID 7945.04 E 1117 2023 Page 2 of 2 Earth Solutions NW, LLC 166 169 168 170 167