HomeMy WebLinkAboutChange Order - 10DocuSign Envelope ID: C84C826B-BE33-454F-A781-6828254E952D CONTRACT: CONTRACTOR: CHANGE ORDER: CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT CAG-22-014 Redside Construction LLC #10 SUMMARY OF PROPOSED CHANGE: 11/28/2023 Reason/Justification: Troubleshooting non-functioning electrical breaker/deck lighting north of project site. DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 Troubleshooting Breaker and Deck Lighting $ 862.00 $ 949.06 $ - $ - $ - $ - $ - $ - Total this Change Order: $ 949.06 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT (W/ WSST) THIS ORDER (W/ WSST) TOTAL AFTER CHANGE $ 4,659,432.00 $4,848,526.56 $949.06 $4,849,475.62 Additional Calendar Days: (O)No Extension ofTime. Completion Date is December 31, 2023. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: Contractor: c* h6ut4.-6Jt, Project Manager: � � Approved By: (Parks and Recreation Administrator) Date: 12/ 1 /23 Date 12/4/23 12/5/2023 I 1:38 PM PST Date: CAG-22-014, CO #10-23 DocuSign Envelope ID: C84C826B-BE33-454F-A781-6828254E952D R REDSIDE COl'ISTRUCTIO" Project Name: Gene Coulon Beach Memorial Park North Water Walk Improvements Project No. CAG-22-014 Contractor: REDSIDE CONSTRUCTION LLC Source Documents: Description: Added Costs for Troubleshooting Breaker Tripping and Deck Lighting 1. CRAFT LABOR COSTS Direct Labor Costs: a. crew (apprentices, journeymen1 & laborers) b. Direct Supervision (NTE 15% Direct Labor) for contracts under $3 million COP General Contractor Breakdown Summary -----------WCD #/COP No. 19 --------- Date: 11/17/2023 --------- Contra ct or Ref. No. R70-22 --------- Itemize all costs on attached COP Cost Breakdown form. DIRECT LABOR SUBTOTAL_$=------ d. safety (NTE 2% labor, lines 1a, b, & c per WSDOT) 2. MATERIAL COSTS a. material costs 3. EQUIPMENT COSTS a. owned/ rented equipment (per spec approved source) b. small tools (NTE 3% craft labor per WSDOT) 4. SPECIALIZED SERVICES a. b. 5. SUBCONTRACTORS a. Dalton Electric • C0-005 • Attached b. 6. OVERHEAD & PROFIT a. 12% (1st $50k, 4% above $50k) • Overhead b. 6%aProflt c. Subcontractors (12% to $50k, 4% above $50k) 7. INSURANCE b. payroll & volume driven liability Insurance 8. BOND a. bond adjustment 9. TAX a. Business and Occupational Tax FormRevised6/1/2004 $ 75 0 .35 $ $ $ 9 0 .00 1.70 %011-6 $ 12.75 1.10 %011-7 $ 9.2 4 0.048 %of1..S $ 0.4 1 1. CRAFT LABOR COSTS _$�------- 2. MATERIAL COSTS_$'-------- 3. EQUIPMENT COSTS_$'--------­ SUBTOTAL 1 thru 3�1 $�-------� 6. SUBTOTAL 4_$'--------- 6. SUBTOTAL 5_$=-----�75�0-'.o-'-o 7. TOTAL OVERHEAD & PROFIT _$=-------'9""0'-'.0-=-0 8. INSURANCE _$:_ ______ 1�2�.7-=-5 9. BOND _$� ______ 9_.2_4 10. B&O TAX_$=---------"0'-'.4-'-1 TOTAL (NIC wssT)�I s�----�s�s2�.o�o�I Gene Coulon -City of Renton Regular Time L&I Wage Rate Add Sick Leave Accrual TOTAL WAGE RATE USLH Pier/Dock/Wharf SUTA @6.03% FICA @7.65% FUTA @0.8% TOTAL PER HOUR Kyle $56.62 $1.42 $58.04 $11.27 $3.41 $4.33 $0.45 77.51 $0.57 $11.27 Regular Time Jason $58.62 $1.47 $60.09 $11.67 $3.53 $4.48 $0.47 80.24 $0.59 $11.67 Regular Time Tim $61.62 $1.54 $63.16 $12.27 $3.72 $4.71 $0.49 84.35 $0.62 $12.27 Regular Time Carpenter $68.19 $1.70 $69.89 $13.58 $4.11 $5.22 $0.55 93.35 $0.68 $13.58 Regular Time Crane Operator 110 ton $77.63 $1.94 $79.57 $15.46 $4.68 $5.94 $0.62 $106.27 $0.78 $15.46 Regular Time Foreman -Robert $69.19 $1.73 $70.92 $13.78 $4.17 $5.29 $0.55 94.71 $0.69 $13.78 Regular Time Superintendent -Jeremy $73.00 $1.83 $74.83 $0.03 $4.40 $5.58 $0.58 88.42 $3.00