Loading...
HomeMy WebLinkAboutR-394937U N U) V) N z O V) ne w w w w J Lu Q M N O N O N i 0 i 0 U) a Ln N N L0 a� v 0 Q i N a� ra a a 0 c O ry N N i 00 U a) 0 L a �I w i no 55 50 45 35 30 25 CB 30024 RIM 43.10 IE 38.7 NE, 6" CONC IE 38.5 SW, 6" CONC z / X 0 z n SDMH 85661 I I I RIM 45.37 IE 41.7 S, 8" CONC IE 40.0 SE, 8" CONC CB #68, SEE SHT SD-24 IE 38.9 W, 12" CONC j IE 38.8 E, 12" CONC SDMH #48, SEE SHT SD-24 I O I � � CB 85662 SSMH 85682 ' I RIM 44.97 RIM 46.04 � I IE 42.9 NW, 8" CONC 100 Q I � � IF 49 a N 8" CONC CB 30025 IE 38.2 NE,E,S-W @ CL .� I N� 1 11 STA L4+61 14.8' IT Jo RIM 43.27 � IE 41. NE, 6" IRON � w � � 8' BUS SIGN - I GAS WILL BE REESTABLISHED .PERIN CDNR 20 DEACTIVATED BY ASE3 QARK a ° ° a a PSE PRIOR TO I � a I ° PERMIT 7373-18"T x 6"W '° + ° 1 �p CONSTRUCTION 16 .W CI + I N � I ���-69- 7V - - - I _ _ _ N \ - 45 65 I 4- 6` - M -- L#36 Qp L1+00 I L2+00 ... .... .... L3+00 .... .... Q I 3 �::. ::u) -� ... cn 4+00 cn U �\ oJ, .... .... .... I : .I .... .... • r , :. 1 TYP .... .... .... SS S£_2iaS ��8 -� _ _ SS d IDNZT�.- z = \ I MILL AVE S I o I� ' 'r •16 �' r, Jw G- - - - - - - „ - - - - - - - G I- UGP- - -- - _- _ _ - - T= = _ �- O \- M M I TT 7Q 45_ °m SDMH #47, SEE SHT SD-24 Y I I I I \ o � 1023 1010 to • � I \ o RI 855 4 I RIM 44. 2 �. 2 I IE 42.0 S, 8" CONC B 3 66 RVI I C-�• IE 42.0 N, 8" CONC 43.10 1 :15SDMH 85622 IE 42.0 NE�6" CONC STA L4+31, 17.4' RT I:: 12- I 1-CB #65 ° 1 RIM 45.46 IE 42.0 S, 8' CONC I I I I T I IE 39.0 W, 1 CONC Q IE 38.8 E, 1 CONC 4" LATERAL FOUND AND 11 STA L4+60 17.5RT i N Z I o 1-CB #66 II II RECONNECTED AT STA 4+43 o • I I N I I a N.II� � FOR CONTINUATION PLAN SEE SHEET SD-24 0 10 20 40 60 SCALE: 1"=20' w F- z w 0 z 0 0 ° Ia CD ... 12"DI W -6 4 0 RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND CD p ELEVATIONS. THE ORIGINAL DESIGN CO LOCATIONS AND ELEVATIONS ARE INDICATED uU)i J WITH STRIKETHROUGH TEXT. REFER TO �, `ONr'j. � m CONTRACT DOCUMENTS FOR ADDITIONAL N U � � N DETAILS � N � V)� V)m < o X a X X X X X (/) � EXIST GR @ w0 w w w w -w W w ROW CL a SDR 35 29 LF 12"e9E)E) J w ---------- ---- @SLP=0.72% � SDR 35 15 LF 12"PP-SE) @ SLP=4.700/(o CB #67 SPU CRP BEYOND % STA L4+61, 15' LT RIM=45.03 IE(IN)12"(S)=41.50 IE(OUT)12"(W)=41.4' CB #66 STA L4+60, 17' RT 48" SDMH #47 RIM=45.02 STA L4+16, 14' RT IE(IN)12"(E)=41.24 RIM=45.46 CB #65 IE(OUT)12"(N)=40.11 IE(IN)12"(S)=39.16 STA K3+07, 35' RT IE(IN)12"(W)=39.11 RIM=44.92 - 39-i!8 IE(OUT)24"(E)=39.93 IE(IN)12"(S)=39.90 rFrni IT)1 ')"(1\1)=-�4 Rz�T LO+40 LO+60 LO+80 L1+00 L1+20 L1+40 L1+60 L1+80 L2+00 L2+20 L2+40 L2+60 L2+80 L3+00 L3+20 L3+40 L3+60 L3+80 L4+00 L4+20 L4+40 L4+60 L4+80 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT NOTICE SEO RECORD 0 �z 1 DESIGNED DRAWINGS BAW sm� IF THIS BAR DOES DRAWN SEE NOTE ON NOT MEASURE 1" TTT murra THEN DRAWING IS CHECKED COVER SHEET 1 10/26/2022 JJM RECORD DRAWING NOT TO SCALE NO. DATE BY REVISION 55 50 45 a 35 25 CONSTRUCTION NOTES O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 11 INSTALL CB PER COR STD PLAN 200.00 16 PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION AND TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN LATERAL IS ACTIVE, RECONNECT EXIST PIPE TO NEW STORM DRAIN PIPE WITH NYLOPLAST FITTING OR APPROVED EQUAL, PER THE SPECIFICATIONS 19 SEE PROFILE 6 ON SHT SD-44 20 SEE PROFILE 7 ON SHT SD-44 R-394937 SHEET PROJECT RENTON DOWNTOWN MILL AVE S ® UTILITY STORM PLAN &PROFILE SD-25 � IMPROVEMENTS STA LO+00 TO STA L4+80 PROJECT NO.: 18-2251 SCALE: AS SHOWN DATE: JANUARY 2021 37 Of 121