Loading...
HomeMy WebLinkAboutU16002232 Sunset Terrace - Construction Close Out CompleteHello, All construction work associated with the Sunset Terrace has been completed and the City has signed off on the Construction Portion of the Civil Construction Permit today. Please note that with the sign off of this permit, your 2-year Maintenance Period begins today with your maintenance period ending on [2023/12/15]. If you have any questions, please let us know. Huy Huynh | Civil Engineer II City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430 -7384 | HHuynh@rentonwa.gov