HomeMy WebLinkAboutMFP23000595.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP23000595 IVR Number: 23000595 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:02/02/2023Application Date:9476200175Parcel Number: 454 GRANDEY WAY NE Permit Type:12/18/2023Issue Date:Franchise Permit Work Class:12/17/2024Expiration Date:Major Utility Job Number: 109143153Franchise Type:Natural Gas Description: PSE Gas Trenching approximately 135ft and relocate existing 1 1/4" gas main out of new bridge foundation. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 109143153 430 Sunset Blvd N BRIAN PARKER 253-243-4165 Monday Friday 9:00am 3:00pm MFP23000595 Scott Warlick CED 12/18/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 430 Sunset Blvd N Renton WA 98057 USAHOUSER WAY BYPASSSUNSET BLVD N SUNSE T B L V D N I -405 ONRAMPEXIT 4 S B O F F R A M PHOUSER WAY BYPASSSRMP 4.48 ARRW-BRD 350'350'350'RIGH T L A N E CLO S E D AHE A D W20-5RW4-2LROA D WOR K AHE A D W20-113 12SRMP 4.50 WORK A R E A U N D E R I- 4 0 5 ISLAND ISLAND 8BXB10-PLATE 8BXB10-PLATE FLAGGERX'X'PLACE W20-1 SIGNS ON ALL ADJACENT PUBLIC STREETS WHERE TRAFFIC COULD ENTER WORK AREA WITHIN 1050 FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1FLAGGER/SPOTTER SHALL ESCORT PEDESTRIANS AROUND WORK AREA. WORK PIT 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 10/12/2022 109143153 0 430 Sunset Blvd N, Renton, WA 98057 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 1 OF 2 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 430 Sunset Blvd N Renton WA 98057 USAHOUSER WAY BYPASSSUNSET BLVD N I -405 ONRAMPEXIT 4 S B O F F R A M PHOUSER WAY BYPASSSRMP 4.48 ARRW-BRD 350'350'350'W4-2RLEF T L A N E CL O S E D AHE A D W20-5LRO A D WO R K AH E A D W20-11312ROADWORKAHEADW20-1maintain 11' lane WORK A R E A U N D E R I - 4 0 5 ISLAN D ISLAND SRMP 4.52 X'X'PLACE W20-1 SIGNS ON ALL ADJACENT PUBLIC STREETS WHERE TRAFFIC COULD ENTER WORK AREA WITHIN 1050 FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1SRMP 4.50 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 10/12/2022 109143153 0 430 Sunset Blvd N, Renton, WA 98057 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 WORK PIT 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 PACCAR BUILDINGSSB I-40 5 O F F R A M P SB I-405NB I-405BLAINE CT. NEBRONSON WAY WIND O R HIL LS SUN SET BLVD N SUNSET B L V D N E GRANDE Y W A Y N EHOUSER WAY BYPASSBNSF RRSUNS E T B L VD NHOUSER WAY NGRANDEY SUN SET BLVD NVERMONT PLSUNSET B L V D N E GRANDEY W A Y N E BNSF R R SUN S ET BLVD N N Vicinity Map Owner / Developer Contact Info officeATTN: WSDOT RENTON TO BELLEVUE 1-405 EXPANSION JAMES RHOBES 425-213-9930 Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 GAS PROJECT PHASE Notification #Order # SVC Retirement Relocate SAP Superior Service/Meter Service/Meter Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION. THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO STANDARD GAS CONSTRUCTION NOTES: 14. 13. 15. 10. 11. THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 9. 6. 7. 5. 4. 3. 1. 60 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. ----------------- NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17. FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD)109143153THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) "Locates Required" "Flagging Required" Yes No Yes No Cell Phone: Project Manager Contact Information: E-Mail: Name: 253-243-4165 Brain.Parker@pse.com BRIAN PARKER PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR STANDARDS 2525.2100 AND 2525.3600. PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 11. 12. 14. 13. AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500. PER PSE GAS OPERATING STANDARD 2550.1600. ABANDONMENT OR DEACTIVATION. 10. 9. 5. 6. 7. 8. GAS OPERATING STANDARD 2525.2300. 4. 1. 2. 3. OUTAGE. STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:##### WORK AREA STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 IP088- 60 N/A 109143153 N/A AS NOTED 1/2 KING N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A DESIGNED BY PUGET SOUND ENERGY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr INSTALL 1 1/4"MPE 245' MN Retirement RENTON 088A CSPSKGPI SAP BATCH YEAR & FOOTAGE ACTUAL LENGTH OF RETIREMENT MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT SIZE OF RETIRED MAIN 1-1/4" MPE IP MAIN RELOCATE SUNSET BLVD 430 SUNSET BLVD N, RENTON WA 16.ACTIVE SERVICES TO BE PARTIALLY REPLACED AND TEST & TIED DENOTED BY: 17.ACTIVE SERVICES TO BE TESTED & TIED DENOTED BY:##### ##### Service/Meter RETIRMENT PEI 185' SE-8-23-5 204.080 207.083 1 1/4" BRIAN PARKER 253-243-4165 NASH KIRIKA 425-306-1755 WORK AREA PLOT PLAN SCALE: NTS 11870041 109143153 108636269 ENGR - POWER SAW CUT (TYP) SEE NOTE 2 PAVEMENT REMOVE/ REPLACE LIMITS WIDTH VARIES SEE NOTE 3 CROSS SECTION A EXISTING HMA (HOT MIX ASPHALT) OR PCCP (PORTLAND CEMENT CONCRETE PAVEMENT). HMA CLASS 12 INCH OR PCCP: DEPTH AND MATERIAL SHALL MATCH EXISTING PAVEMENT. REMOVAL AND REPLACEMENT LIMITS OF PAVEMENT TO BE DETERMINED AT THE TIME OF UTILITY PERMIT/FRANCHISE REVIEW. APPROVED BACKFILL MATERIAL OR CDF (CONTROL DENSITY BACKFILL) OR AS SPECIFIED BY WDOT. BEDDING MATERIAL. BEDDING MATERIAL DEPTH OVER AND BENEATH PIPE CASING SHALL BE HALF THE DIAMETER OF PIPE CASING OR 6 INCHES WHICHEVER IS LESS. EXISTING CRUSHED SURFACING BASE COURSE. CRUSHED SURFACING BASE COURSE DEPTH SHALL MATCH DEPTH OF EXISTING CRUSHE SURFACING BASE COURSE. HMA BUTT JOINT REQUIRES TACK, SEAL AND SAND. FOR PCCP REFER TO GENERAL NOTE 5. G E N E R A L N O T E S 1. TRENCHING AND PIPE INSTALLATION SHALL L MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION 7-08. 2. MAXIMUM TRENCH WIDTH SHALL BE OUSIDE CASING PIPE WIDTH P PLUS ONE FOOT EITHER SIDE OF CASING PIPE. 3. COMPACTION SHALL BE METHOD "C" PER SECTION 2-03.3 (14) C. 4. MINIMUM DEPTH SHALL BE 60 INCHES FROM THE FINISHED SURFACE TO TOP OF CASING. 5. PCCP SHALL BE REPLACED TO THE NEXT PANEL JOINT IN EACH DIRECTION AS APPROVED BY WSDOT. ALL WORK SHALL BE AS SPECIFIED IN WSDOT STANDARD SPECIFICATION SECTION 5-01.3 (4). 6. WHEN CONNECTING TO AN EXISTING FACILITY UNDER THE PAVEMENT, PAVEMENT RESTORATION MAY, AT THE DEPARTMENT'S DISCRETION, INCLUDE THE FULL LANE WIDTH AND ENCROACHED SHOULDER. 7. CASING PIPES SHALL NOT EXTEND A MINIMUM OF SIX (6) FEET BEYOND THE TOE OF FILL SLOPES, BOTTOM OF DITCHLINE, OR OUTSIDE OF CURB. 8. TACK ASPHALT PER WSDOT STANDARD SPECIFICATION 5-4.3 (5) A. L E G E N D OPEN CUT CROSSING UTILITY TRENCH BACKFILL DETAIL EDGE OF PAVEMENT EDGE OF LANE EDGE OF TRENCH SAW CUT EDGE OF TRENCH SAW CUT EDGE OF PAVEMENT EDGE OF LANE TRENCH PLAN VIEW A - 12'12'5' 79' RIGHT OF WAY 5'45' ROAD CROSS SECTIONAL VIEW OF SUNSET BLVD N. - FACING NORTH 6' 11/21/23 DUYEN DAO KEVIN CAPRIO 508-742-8891 ALFRED JACKSON 425-495-0566 253-395-6956 11/21/23 11/21/23 11/21/23 11/21/23 RESTORATION PER CITY OF RENTON STANDARDS MFP23000595 This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR IP GA S F L O W N53° 0 2' 0 1. 4 9" E N71°06' 2 2 . 0 0 " E 43 20N46°57'28.00" E N68°0 7' 5 2. 0 0 " E 23 WALL 04.45LW-197-20 6' CLFASP H SI D E W AL K 5540N29°02'03.93"EN29°24'17.31"EW W W W M IP GA S FL O W IP GAS F L O W N/A N/A AS NOTED 2/2 KING N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A DESIGNED BY PUGET SOUND ENERGY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr RENTON CSPSKGPI 204.080 207.083 FUTURE CURB EXISTING POLE 318171-166408 FOR REFERENCE 1054'S of BRONSON WAY NE C/L &23' E of SUNSET BLVD N C/L ____'S C/L, ____'W C/L 1091431532 1 SCALE: 1:20 TIE IN DETAIL1 2 Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 PROPOSED 1 1/4" MPE IP MAIN ROPE 6' BELOW GRADE 25'W C/L (____'W C/L) ENGR - POWER NASH KIRIKA 425-306-1755 SUNSET BLVD 430 SUNSET BLVD N, RENTON WA 109143153 DEACTIVATE IN PLACE EXISTING 1 1/4" PEI IP MAIN ELBOW 1 1/4"X90° MPE 956'S of BRONSON WAY NE C/L & 22'W of SUNSET BLVD N C/L ____'S C/L & ____'W C/L ELBOW 1 1/4"X90° MPE 786'S of BRONSON WAY NE C/L & 6'W OF SUNSET BLVD N C/L ____'S C/L & ____'W C/L SQUEEZE & TIE-IN ELBOW 1 1/4"X90° MPE 956'S of BRONSON WAY NE C/L & 10'E of SUNSET BLVD N C/L ____'S C/L & ____'E C/L SQUEEZE & TIE-IN ELBOW 1 1/4"X90° MPE 786' S of BRONSON WAY NE C/L & 12'E of SUNSET BLVD N C/L ____'S C/L & ____'E C/L FUTURE BRIDGE FOOTING BEGINNING SIDEWALK PIPE 1 -1/4" MPE BYPASS TEE TAP1-1/4" X 1-1/4" HDPE (BYPASS TEE) ____'S C/L & ____'E C/L TEE TAP 1-1/4" X 5/8" HDPE (GAUGE TEE) ____'S C/L & ____'E C/L TEE TAP 1-1/4" X 5/8" HDPE (GAUGE TEE) ____'S C/L & ____'E C/L TEE TAP1-1/4" X 1-1/4" HDPE (BYPASS TEE) ____'S C/L & ____'E C/L PIPE 1 -1/4" MPE BYPASS TEE TAP1-1/4" X 1-1/4" MPE (BYPASS TEE) ____'S C/L & ____'E C/L TEE TAP1-1/4" X 1-1/4" HDPE (BYPASS TEE) ____'S C/L & ____'E C/LBRONSON WAY NEPROPOSED 1 1/4" PIPE PLOT PLAN SCALE: 1" = 20' BRIAN PARKER 253-243-4165 088A SE-8-23-5 NOTE GAUGE TEE TO BE MONITORED DURING ALL ACTIVITIES WHERE FLOW OF GAS WILL BE INTERRUPTED E.O.C (EXISTING) ____'E C/L E.O.C (EXISTING) ____'E C/L (____')(____ ' ) (____') 1-1/4" MPE IP MAIN RELOCATE BYPASS INSTRUCTIONS: NOTIFY PSE PLANNING 2 WEEKS BEFORE START OF CONSTRUCTION DATE. MICHAEL FRANK GAS SYSTEM PLANNING 253-395-6354 REQUEST FOR BYPASS SIZING: PLEASE INCLUDE THE JOB NUMBER, ADDRESS, PLAT & OP NUMBERS. CALL MICHAEL FRANK BEFORE CONSTRUCTION TO CONFIRM. EXISTING CURB FUTURE CURB EXISTING CURB END OF SIDEWALK 11/21/23 DUYEN DAO KEVIN CAPRIO 508-742-8891 ALFRED JACKSON 425-495-0566 253-395-6956 11/21/23 11/21/23 11/21/23 11/21/23 MFP23000595