HomeMy WebLinkAboutMFP23006138.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23006138
IVR Number: 23006138
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:12/11/2023Application Date:7224000190Parcel Number: 130 PARK AVE N
Permit Type:12/18/2023Issue Date:Franchise
Permit Work Class:12/17/2024Expiration Date:Minor Utility
Job Number: 108646330Franchise Type:Natural Gas
Description: PSE Gas CREW TO RETIRE EXISTING 5/8" PE GAS SERVICES TO 132 AND 130 PER CITY OF RENTON FOR A
BUILDING TO BE DEMOED IN JANUARY. 1:3'X5' ASPHALT CUT ANTICIPATED
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
INFRASOURCE, INC
6905 S 228TH ST KENT, WA 98032
PLEASE SEE ATTACHED
108646330
132 PARK AVE N
JENNIFER BERGMAN 253-213-3634
MFP23006138
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 12/18/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
130 Park Ave N
Renton
WA 98057
USA1515
171719 19 151511 10 10 11
10
11
11
1
0
1
1
1
0
1
1
1
1
10
11 10
1
1
1
1
1
0
1
1
11 10 10 11
11 10 10 11
11 10 10 11 1515151510 11 21
19 19
BUSSTOP11 11
12 12
15BRON
S
O
N
W
A
Y
N
BRON
S
O
N
W
A
Y
N
N 2ND ST MEADOW AVE NN 3RD ST
GARDEN AVE NN 2ND ST
6 6 PARK PL NN 3RD STN 3RD ST
PARK AVE NPARK AVE NN
1
S
T
S
T
PELLY AVE
N
N
R
I
V
E
R
S
I
D
E
D
R GARDEN AVE NMEADOW AVE NALLEYALLEYW2
0
-
1
ROAD
WORKAHEAD
ROAD
NARROWS W5-1X'
≥X'≥W20-1ROADWORKAHEADROADNARROWSW5-1X'≥X'≥FROM TO
TOW AWAY AREA
PHONE 684-5444NAME OF FIRM XXX-XXX-XXXX
NO PARKINGFROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGBUSSTOPN 2ND STPELLY AVE NLEFTKEEPR4-8BN
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Qyumin Parungao
425-424-6658
qyumin.parungao@pse.com
1 OF 1130 Park Ave N, Renton, WA, 98057
0
11963616
10/11/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
8. Work area will be 310' SCL of N 2Nd St & 4' WCL of
Alley.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
WORK PIT
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425
MFP23006138
Service Address:
City Zip:
Customer: Phone:
Customer Email:
Est. Start Date:
Site Contact Email:
&
&
&
No
Job Description
New Construction:
Construction Method
Building Foundation Type
Septic System
1 Day
No
Slab
Trench
Renton
yesROW Permit:
Jurisdiction:
Cut & Cap existing 5/8" PE Complete Commercial Service & 5/8" PE Twin Service
@ 4' W c/l of Alley & 310' S c/l of N 2nd St / Bring (2) Alley closed signs / Contact
person is Bryce @ 425‐430‐6767 or 425‐766‐6201 / Note: The City plans on
Demolishing the Building soon.
Est. Duration:
Fuse
PLAT Map:
N
EFV:N/A Police #:0 TCP:YES Tie‐In Fitting
Meter: Speed Limit:20 No Parks #:YES
Job Type
Diameter: Flaggers #:0 Arterial:
Del Press:N/A Traffic Signal:N/A Bus Stop:N/A
Bollards: 2.5" #4" #ADA Ramps #:N/A Route #'s:N/A
Meter Loc: Trolley Lines:No Mtr Hoods #:N/AOB
No Cut & Cap Commercial Service
Service Information Street Information
5/8" PE
Work Location
310'South
Surface Type
A
Size of Cut
of CL N 2 St 4'West of Alley 3 X 5 X 2
PM / Inspector:
Courtney Isbell
98057
Phone:253‐293‐0214
Puget Sound Energy Gas Pre‐Inspect Form
10/5/23Date:
108646330Job #:
Renton
132 Park Ave N
PSE 888‐225‐5773
N/A
Phone:206‐498‐0053Ken Elvsaas
of CL of CL
of CL of CL
208.082
2" PE IP 4' W c/l 9604177Park Ave N1500 SF Work Area130 & 132N 2nd St
AlleyMFP23006138
RESTORATION PER CITY OF RENTON STANDARDS
13212612211811211012001222108145135141143147140120312071315281441041010119150130014911713010201100PARK AVE NBRONSON WAY NIdle RiserIdle Riser3" MPEI IP 9'S 96057234" MPE IP 13'S 96057231 1/4" MPE IP 4'W 9604177DEACT 2" ST 3'W2" P DEACT 1 1/4" PE 3'W2" MPE IP 4'W 9604177128'E12'S17'S7'W127'E22'W3'W2'W3'W11'S5'W310'S264'N124'E215'W126'E602'S227'E117'S253'N343'N245'S366'N271'N334'N209'S227'S460'S33'S63'E43'E450'N78'N151'N170'N191'W209'W110'W161'E1 1/4" MPE20125/8" MPE19965/8" MPE19975/8" MPE19965/8" MPE19975/8" MPE19965/8" MPE19965/8" PE19935/8" PE19785/8" PE19795/8" MPE19985/8" MPE19965/8" PE19755/8" MPE19965/8" MPE19965/8" MPE19965/8" MPEI19961 1/8" MPE20025/8" MPE19961 1/4" MPE20101 1/8" MPE20025/8"281'N5/8" MPE19985/8"126'E5/8" MPE2000-E1 1/8" PE19855/8"602'S5/8" PE19785/8" PE1978ROPES7'S,1'WROPES1'S,4'W11'S,1'E12'S15'S2'W5'W5'6'W13'ST#A No electric grid information availableS208080, Q208082The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“10-04-2023Scale 1:900Lat\Long=47.484, -122.2015MFP23006138