Loading...
HomeMy WebLinkAboutChange Order - 14DocuSign Envelope ID: 1289AC68-6336-4258-8983-0CF8CA1981 F3 CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT 12/8/2023 CONTRACT: CAG-22-015 CONTRACTOR: Active Construction Inc. CHANGE ORDER: #14 SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1) Backfill and restore curb following PSE scope. 2) Add weed fabric and wood chips under boardwalk. 3) Raise existing stop sign. 4) Additional leaf removal. 5) Trench drain installation. DESCRIPTION: Item Qty. Description Unit Price Amount No.w/WSST 1 1 Restoring curb following PSE work $ 719.26 $ 791.90 2 2 Added fabric and wood chips under boardwalk $12,665.44 $13,944.65 3 3 Raised existing stop sign to bring into stnd height $ 669.95 $ 737.61 4 4 Added leaf blowing maintenance $ 3,243.12 $ 3,570.68 5 5 Trench drain installation $ 8,933.96 $ 9,836.29 $ - Total this Change Order: $ 28,881.13 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/WSST) AMOUNT THIS ORDER (W / WSST) TOTAL AFTER CHANGE $ 4,711,486.18 $5,026,085.75 $28,881.13 $5,054,966.88 Additional Calendar Days: (O)No extension of time. Completion Date is December 29, 2023. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original aereernent. All of the other terms of the orieinal ae:reement remain in effect. SIGN �� Cont or:�.i..w o . Acr I Project Manager:� � Erica Schmitz Approved By:8421E12101 C1449 (Parks and Recreation Administrator) Erica Schmitz, Parks Planning and Natural Resources Director for Maryjane Van Cleave, Parks and Recreation Administrator Date: Date Date: 12/11/23 12/18/2023 I 4:30 PM PST CAG-22-015, CO #14-23 DocuSign Envelope ID: 12B9AC68-6336-4258-89B3-0CF8CA1981F3 ADDITIONAL WORK SUMMARY DESCRIPTION OF WORK LABOR CLASS/ RATES MANPOWER HOURS RATE TOTAL SUBTOTAL LABOR $186.40 EQUIPMENT DESCRIPTION/ RATES EQUIP.NO. EQUIPMENT DESCRIPTION HOURS RATE TOTAL @ SUBTOTAL EQUIPMENT $55.66 MATERIAL COSTS DESCRIPTION UNIT RATE TOTAL SUBTOTAL MATERIALS $0.00 SERVICE COSTS DESCRIPTION UNIT RATE TOTAL SERVICE SUBTOTAL $0.00 SUB CONTRACTOR DESCRIPTION UNIT RATE TOTAL SUB CONTRACTOR SUBTOTAL $339.50 TOTALS $186.40 SUBTOTAL $251.38 Total Subcontracts Subcontract Markup SUBTOTAL $380.24 SUBTOTAL $281.55 SUBTOTAL $387.84 $287.18 SUBTOTAL $403.36 TOTAL $403.36 TOTAL $315.89 GRAND TOTAL $719.25 GRAND TOTAL WITH TAX $791.90 DocuSign Envelope ID: 12B9AC68-6336-4258-89B3-0CF8CA1981F3 Caliber Concrete Construction Inc PO Box 1881 Milton WA 98354 (253)927-0707 (253)927-0706 ITo: Active Construction Inc. I Description 9907 - Curb @ Vault Change Order Request COR Number: 004 Date: 11/28/2023 I Project: Philip Arnold Park Site Improvement Page 2 Quantity UOM Unit Price 10.00 LF 33.95 I Change Order Total: Extended Price I 339.50 339.sol Adjustments for 522 in All Saved Models Miscellaneous 4X4 11/2 310 CONV DIESEL 300 hp& Over N/A Configuration for 4X4 11/2 310 CONV DIESEL Blue Book Rates 4X4 310.0 11/2 Conventional Diesel Estimated Operating Costs FHWARate .. Adjustments Monthly Total: USO $1,205.56 Non-Active Use Rates Rate Element Allocation Element Weekly USD$336.32 Daily USO $83.82 Percentage Hourly USO $12.42 Hourly USO $20.48 Value Hourly USD$27.33 Hourly DocuSign Envelope ID: 1289AC68-6336-4258-8983-0CF8CA1981 F3 DELUXE FOR BUSINESS 1-800-888-6327 FOREMAN OPERATOR LABORER TCS FLAGGER EQUIP.NO. • Notes: DESCRIPTION OF WORK LABOR CLASS & HOURS QTY STRAIGHT OVERTIME I 2- EQUIPMENT DESCRIPTION MATERIALS DELIVERED/USED SliRVICES PERFORMED SUBCONTRACTORS • Ref. No: G 913100462 AWA# OF DOUBLE TOTAL HOURS 2- TOTAL HOURS 2.. UNITS TICKET# UNITS TICKET# UNITS TICKET# ADDITIONAL CHARGE FOR ABOVE WORK IS: $�-------------------------1 Payment will be made as follows: Above additiona,I work to be performed under s-ame conditions as specified in original contract unless otherwise stipulated Date: Authorizin Signature: OWNER SIGNS HERE We agree to furnish labor and materia,ls -complete in accordance with the above specifications, at above stated price. -l DocuSign Envelope ID: 12B9AC68-6336-4258-89B3-0CF8CA1981F3 ADDITIONAL WORK SUMMARY DESCRIPTION OF WORK LABOR CLASS/ RATES MANPOWER HOURS RATE TOTAL SUBTOTAL LABOR $2,049.60 EQUIPMENT DESCRIPTION/ RATES EQUIP.NO. EQUIPMENT DESCRIPTION HOURS RATE TOTAL SUBTOTAL EQUIPMENT $202.64 MATERIAL COSTS DESCRIPTION UNIT RATE TOTAL SUBTOTAL MATERIALS $0.00 SERVICE COSTS DESCRIPTION UNIT RATE TOTAL SERVICE SUBTOTAL $0.00 SUB CONTRACTOR DESCRIPTION UNIT RATE TOTAL SUB CONTRACTOR SUBTOTAL $8,215.00 TOTALS $2,049.60 SUBTOTAL $2,354.72 Total Subcontracts Subcontract Markup SUBTOTAL $9,200.80 SUBTOTAL $2,637.29 SUBTOTAL $9,384.82 $2,690.03 SUBTOTAL $9,760.21 TOTAL $9,760.21 TOTAL $2,905.23 GRAND TOTAL PER EA $12,665.44 DocuSign Envelope ID: 12B9AC68-6336-4258-89B3-0CF8CA1981F3 December 6, 2023 Active Construction, Inc. P.O. Box 430 Puyallup, WA 98371 Attn: Greg Gebhard Re: Philip Arnold Park-Landscape Fabric Hi Greg, Per the City's request, we have prepared a quote for the installation of Landscape Fabric and Bark for the area under the boardwalk. Our installed price would be $8,215.00. Please forward for approval and let me know how and when we should proceed with ordering the materials. Thank you, Kelley Parish 1 5000 NW LOGIE TRAIL • HILLSBORO, OR 97 1 24 DocuSign Envelope ID: 1289AC68-6336-4258-8983-0CF8CA1981F3