Loading...
HomeMy WebLinkAboutMFP23005915.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP23005915 IVR Number: 23005915 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:11/28/2023Application Date:3345700220Parcel Number: 1825 NE 38TH ST Permit Type:11/30/2023Issue Date:Franchise Permit Work Class:12/02/2024Expiration Date:Major Utility Job Number: JB0001632515Franchise Type:Cable Description: This project proposes to remove 562' of existing aerial cable and one existing utility pole. Bore approx. 436' and place one CATV pedestal and one new utility pole. Work takes place on the west side of Lincoln Ave NE. All restoration will be done to or exceed all current city standards. Installation of (1) 4" HDPE conduits. Contractor shall pothole and verify all underground utilities prior to the start of construction. Contacts Name Address PhoneTypeBilling Leah Ihlenfeldt Cablecom LLC 1316 Bonneville Avenue Snohomish, WA 98290 B: (360) 670-4291ApplicantX Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Contact CABLECOM LLC 20021 120th Ave NE, #101 BOTHELL, WA 98011 B: (360) 668-1300Contractor Business License Number: 52252Construction Contractor: CABLEL*971DP Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Emergency Contact GILL HOMES LLC 27410 MARINE VIEW DR S DES MOINES , WA 98198 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date COMCAST Jessamin Santos 206-401-2188 WAConstruction_JointUse@comcast.com 360-670-4291 CABLEL*971DP Cablecom LLC - Leah Ihlenfeldt 52252 1825 NE 38th St 436 11/28/23 COMCAST - JB0001632515 to remove 562' of existing aerial cable and one existing utility pole. Bore approx. 436' andplace one CATV pedestal and one new utility pole. Worktakes place on the west side of Lincoln Ave NE. Allrestoration will be done to or exceed all current city standards.Installation of (1) 4" HDPE conduits. Contractor shall pothole and verify all undergroundutilities prior to the start of construction. x x Scott Warlick MFP23005915 1/4/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Cablecom LLC Leah Ihlenfeldt 360-670-4291 1316 Bonneville Ave Snohomish, WA 98290 COMCAST - JB0001632515 1825 NE 38th Sttbd upon permit inssuance This project proposes to remove 562' of existing aerialcable and one existing utility pole. Bore approx. 436' andplace one CATV pedestal and one new utility pole. Worktakes place on the west side of Lincoln Ave NE. Allrestoration will be done to or exceed all current city standardsInstallation of (1) 4" HDPE conduits.Contractor shall pothole and verify all undergroundutilities prior to the start of construction MFP23005915 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 1/4/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Jessamin Santos 11/28/2023 TRAFFIC CONTROL - KEY MAPC-11SCALE: N.T.STHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON30ISSUE FOR PERMIT11/28/2023DOMSHEET TC-1 SHEET TC-2 MFP23005915 SSSSWWSDWWD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WXXXX X XROADWORKAHEADW20-1ROADWORKAHEADW20-1W20-7W20-7ONE LANEROADAHEADW20-4ONE LANEROADAHEADW20-4*****SPEED (MPH)25303540455055606570LENGTH (feet)250305360425495570645730155200TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 OEV.HOST VEHICLE WEIGHT! 22,000 OEV.MPH50/7035/4525/30TAPERTANGENT403020806040CHANNELIZATION DEVICESPACING (feet)RURAL ROADS & URBAN ARTERIALSURBAN STREETS25 MPH OR LESS100' +/- (2)200' +/- (2)35 / 40 MPH25 / 30 MPH350' +/- (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.SIGN SPACING = X (1)RURAL ROADS, URBAN ARTERIALS,RESIDENTIAL & BUSINESS DISTRICTSGENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE,UNLESS OTHERWISE NOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING ATFLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIANTRAFFIC CONTROL AND ARE TO MAINTAIN OPEN SIDEWALKSAND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTINGWORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH ASMEASURED TO THE NEAR FACE OF THE CHANNELIZINGDEVICES.SIGNTRAFFIC CONE OR DELINEATORLEGENDWORK VEHICLEFLAGGERD/W*=SPOTTER SHALL BE PLACED AT ALL " " DRIVEWAYSALONG THE ROUTE TO ASSIST MOTORISTS DURINGCONSTRUCTION*LINCOLN AVE NE 25 MPH3613 Lincoln Ave NE,Renton, WA 980563617 Lincoln Ave NE,Renton, WA 98056NE 35TH PL 25 MPHNE 36TH ST 25 MPH32' 20' 26'TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON30ISSUE FOR PERMIT11/28/2023DOMTC-12SCALE: N.T.S.MATCHLINE-SEE SHEET TC-2MFP23005915 SSSSSDWSDSDD/WD/WD/WD/WD/WD/WD/WCATVCATVCATVCATVROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7XXX**SPEED (MPH)25303540455055606570LENGTH (feet)250305360425495570645730155200TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 OEV.HOST VEHICLE WEIGHT! 22,000 OEV.MPH50/7035/4525/30TAPERTANGENT403020806040CHANNELIZATION DEVICESPACING (feet)RURAL ROADS & URBAN ARTERIALSURBAN STREETS25 MPH OR LESS100' +/- (2)200' +/- (2)35 / 40 MPH25 / 30 MPH350' +/- (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.SIGN SPACING = X (1)RURAL ROADS, URBAN ARTERIALS,RESIDENTIAL & BUSINESS DISTRICTSGENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENTORANGE, UNLESS OTHERWISE NOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIANTRAFFIC CONTROL AND ARE TO MAINTAIN OPENSIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TOSTARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH ASMEASURED TO THE NEAR FACE OF THE CHANNELIZINGDEVICES.SIGNTRAFFIC CONE OR DELINEATORLEGENDWORK VEHICLEFLAGGERD/W*=SPOTTER SHALL BE PLACED AT ALL " " DRIVEWAYSALONG THE ROUTE TO ASSIST MOTORISTS DURINGCONSTRUCTION*LINCOLN AVE NE 25 MPH1826 NE 38th St,Renton, WA 980563815 Lincoln Ave NE,Renton, WA 98056NE 38TH ST(UNDER CONSTRUCTION)25' 26'TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON30ISSUE FOR PERMIT11/28/2023DOMTC-23SCALE: N.T.S.MATCHLINE-SEE SHEET TC-1 MFP23005915 COVER-TITLETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMScope of work to Target address 1825 NE 38th St·This project proposes to remove 562' of existing aerialcable and one existing utility pole. Bore approx. 436' andplace one CATV pedestal and one new utility pole. Worktakes place on the west side of Lincoln Ave NE. Allrestoration will be done to or exceed all current citystandards.·Installation of (1) 4" HDPE conduits.·Contractor shall pothole and verify all undergroundutilities prior to the start of construction.BUILDIn The City ROW·Bore footage:~436'·Bore Pits:4·Existing Utility Pole(s):3·New Utility Pole:1·New Pedestals:1·Exist. Cable to be Removed:~562'·Overlash footage:~133'VICINITY MAPSHEET INDEXSheet #1C-1Cover-Title2G-1General Notes3SW-1Stormwater Protection Plan4-5CD-1-CD-2Construction Plans6D-1Construction Details7SD-1Municipality StandardsSCALE: NONEContactC-1PROJECT ID: JB16325151SHEETS CD-1AND CD-2Jessamin SantosComcastJessamin_Santos@cable.comcast.com206-401-2188MFP23005915This permit is for Major construction work in the ROW and will be billed at an additional$158/HR for inspections. After hours and weekend work will be billed at $175/HR GENERAL NOTESTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMROADWAY CENTER LINEREMOVE EXISTING AERIAL CABLEEXISTING FENCELINEPROPOSED BORE ROUTEEXISTING WATER LINEEXISTING STORM DRAINEXISTING SANITARY SEWEREXISTING JOINT TRENCHEXISTING RECYCLED WATER LINEEXISTING TV SYSTEMEXISTING GAS SYSTEMEXISTING ELECTRICAL SYSTEMEXISTING TELEPHONE SYSTEMPROPERTY LINELINETYPESBORE PITWATER MANHOLEUNIDENTIFIED MANHOLEGAS METERWATER METERELECTRIC MANHOLESEWER CLEAN OUTSANITARY SEWER MANHOLESTORM DRAIN MANHOLECATCH BASINGAS/WATER VALVETREE/BUSHESGWEXISTING POLEEXISTING COMCAST PEDESTALNEW RISER ATTACHED TO POLEEXISTING IRRIGATION VAULTEXISTING COMCAST VAULTEXISTING UTILITY VAULT/PEDESTALSSCOECOWSDMONUMENTFIRE HYDRANTTRAFFIC SIGNAL COMBINATIONSTREET LIGHTTRANSFORMERNEW COMCAST LOW PROFILE NEW COMCAST PEDESTALNEW COMCAST VAULTPOWER SUPPLY W/ METERNEW COMCAST POWER SUPPLYSYMBOLSEXISTING WATEREXISTING TELEPHONEDRIVEWAYMAXIMUMD/WMAXW T RIGHT OF WAYEXISTING SANITARY SEWEREXISTING STORM DRAINPUBLIC UTILITY EASEMENTPROPERTY LINEMINIMUMFACE OF CURBEXISTINGCENTER LINECOMCASTL MINFOC (E) COMCAST CABBREVIATIONSPUEROWSS SDPL JTSSSDW+++TEGTVCATVNEW AERIAL STRAND/CABLE ROUTEOFFSETO/SBACK OF WALKBOWREMOVAL/REPAIRR/RNEW(N) G-12EDGE OF PAVEMENTEOPANCHOR SUPPORTPROOF & PULL ROUTE (NEW CABLE IN (E) CONDUITS)PROPOSED TRENCH ROUTERWOPGENERAL NOTES1.ALL GENERAL NOTES SHALL APPLY TO ALL DRAWINGS, PLANS AND DETAILS.2.CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA), AT LEAST 48 HOURS(AND NOT MORE THAN 14 DAYS) PRIOR TO THE START OF CONSTRUCTION BY CALLING (800)227-2600.3.CONTRACTOR SHALL POTHOLE/HAND DIG AND VERIFY ALL UNDERGROUND UTILITIES PRIORTO THE START OF CONSTRUCTION. ALL UTILITY LOCATIONS ON PLANS ARE APPROXIMATE,CONTRACTOR MUST VERIFY.4.CONTRACTOR SHALL VERIFY ALL FOOTAGES ON SITE, PRIOR TO THE START OFCONSTRUCTION. ALL DIMENSIONS SHOWN ON PLANS ARE APPROXIMATE.5.CONTRACTOR SHALL KEEP A COPY OF APPROVED PLAN(S) AND PERMIT(S) AT THE JOB SITEAT ALL TIMES AND PRESENT IT TO AN AUTHORIZED AGENT OF THE CITY OF RENTONAND/OR LAW ENFORCEMENT UPON REQUEST.6.CONTRACTOR SHALL ENSURE THAT ANY EXISTING FACILITIES DAMAGED OR REMOVED SHALLBE REPLACED IN KIND OR BETTER, INCLUDING BUT NOT LIMITED TO REPLACING EXISTINGSTRIPING AND REMOVING UNNECESSARY "USA" MARKINGS.7.CONTRACTOR SHALL WORK ONLY DURING APPROVED HOURS, UNLESS OTHERWISEAPPROVED IN WRITING BY THE "CITY ENGINEER."8.CONTRACTOR SHALL PERFORM ALL WORK AND TRAFFIC CONTROL IN ACCORDANCE WITHTHE CITY OF RENTON AND STATE OF WASHINGTON STANDARD PLANS AND SPECIFICATIONS,AND CURRENT WASHINGTON DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORMTRAFFIC CONTROL DEVICES" AND "WASHINGTON MODIFICATION (468-95 WAC)" FOR USE INPERFORMANCE OF WORK UPON HIGHWAYS. FLASHING ARROW SIGNS SHALL BE REQUIREDFOR ALL LANE CLOSURES.9.CONTRACTOR SHALL ENSURE ALL WORK PERFORMED IS IN ACCORDANCE WITHREGULATIONS AND STANDARDS SET BY ANY AND ALL REGULATORY AGENCIES HAVINGJURISDICTION AT THIS WORK SITE, INCLUDING BUT NOT LIMITED TO THE STATE OFWASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, THE STATE OF WASHINGTONDEPARTMENT OF LABOR AND INDUSTRIES, DIVISION OF OCCUPATIONAL SAFETY ANDHEALTH (DOSH), THE COUNTY OF KING, ALL WORK SHALL BE ACCESSIBLE AND SUBJECT TOINSPECTION BY CITY ENGINEER AND/OR AN AUTHORIZED AGENT OF COMCAST.10.CONTRACTOR SHALL "RED-LINE" ALL LAYOUTS, PLANS AND DETAILS, ON THE DAY OFCONSTRUCTION AND SUBMIT A COMPLETE SET OF "AS-BUILT" PLANS TO COMCAST UPONCOMPLETION OF THE PROJECT, AND TO CITY.11.CONTRACTOR SHALL NOTIFY RESIDENTS AFFECTED BY THE WORK IN LANDSCAPED AREA INADVANCE OF CONSTRUCTION.12.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS IN ADVANCE OFWORK COMMENCING.13.LANE CLOSURES ARE PROHIBITED BEFORE 8:30 AM AND AFTER 4:00 PM (3:00 PM OFFRIDAYS AND ON DAYS PRECEDING DESIGNATED LEGAL HOLIDAYS). NO LANE CLOSURES AREPERMITTED ON WEEKENDS AND HOLIDAYS.REMOVE OHREMOVE OHMFP23005915 CONCRETE WASHOUT450 MM(18") MIN.450 MM(18") MIN.25 MM (1") MIN.CONCRETEWASHOUTAREA NOTES:1.) FACE SIGN TOWARD NEAREST STREET OR ACCESS POINT.2.) CONCRETE WASHOUT SHALL BE LOCATED BEHIND THE CURB AND 15 M (50 FT.) MINIMUM FROM DRAINAGE INLETS OR WATERCOURSESBALE CONFIGURATIONTHIS SECTION REMOVED FORGRAPHICAL REPRESENTATIONONLY. STRAW BALE PERIMETERSHALL BE CONTINUOUS.SIGN600 MM(24") MIN.36 CM (14") MIN.3 M (10') MIN. TYP. OF 4 SIDES STRAW BALESAA900 MM(36") MIN.SECTION A - A60 MIL POLYETHYLENE50 X 50 MM (2" X2")STAKES OR #4 J-BARS2 PER BALE TYP.STRAW BALESINLET SEDIMENTCONTROL45° NOTES:1.) SEDIMENT TRAPPED UPSTREAM OF SEDIMENT CONTROL BMP SHALL BE REMOVED WEEKLY AND PRIOR TO A RAINFALL EVENT.2.) PLACE BMP'S TIGHTLY TOGETHER AT JOINTS TO PREVENT OR MINIMIZE SEEPAGE AT JOINTS.GRAVEL BAG(S) OR OTHER ACCEPTEDSEDIMENT CONTROL BMP. PLACE BAGSTIGHT AGAINST FACE OF CURB.BACK OF CURBFACE OF CURBLIP OF GUTTERDRAINAGE INLETWITH FILTER BAGPLAN VIEWSEE NOTE 2FLOWTHE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 0.8 HECTARES (2 ACRES).THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE, NYLON, POLYESTER, OR ETHYLENE FABRIC WITH A MINIMUM TENSILE STRENGTH OF 50 LBS PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GREATER THAN 20 SIEVE AND WITH A MINIMUM FLOW RATE OF 40 GALLONS/MINUTE/SQ FT.THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY THE EXISTING INLET GRATE (OR OTHER APPROVED METHOD), PROVIDING NO MODIFICATION OR DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME. THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 13MM (.5") ABOVE THE INLET FRAME (SEE DETAIL A).THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED.FLOWS SHALL NOT BE ALLOWED TO BYPASS THE BAG. THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF THE INLET, EXCEPT AS SHOWN FOR FLOOD RELEASE.INLET FILTER BAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL DURING THE WET SEASON AND MONTHLY DURING THE DRY SEASON. SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE DEPTH OF THE BAG. BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS. EXISTING DROPINLET GRATEPLACEMENT AT TYPE A, C, D, & F DROP INLETSAND PARKING LOTSEXISTING DROPINLET FRAMEFILTER BAG(OPTIONAL)FRAME EXISTING DROPINLET GRATEBAG DEPTHMAXIMUMDETAIL AOUTLET PIPE1.3 CM (.5")MAXIMUMPLACEMENT AT TYPE B AND E DROP INLETSMINIMUMAT BACK(FLOODRELEASE)5 CM (2")18" MINIMUM EXISTING OPENBACK HOODCONTACTAT FRONTAND SIDESDETAIL AGRATE)MINIMUMBAG WIDTH(BACK OF5 CM (2")MINIMUMDAM CONTACT,ALL SIDESCURBSTORM DRAIN INLETFILTER BAGOUTLET PIPE65DETAIL A4.3.2.NOTES1.FILTER BAGFILTER BAGSTORM WATERPROTECTION PLANSTORM WATER PROTECTION PLANTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMSW-13MFP23005915 SSSSWWSDWSDW8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" W12" W12" W12" W12" WD/WD/WD/WD/W REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OHLINCOLN AVE NE3613 Lincoln Ave NE,Renton, WA 980563617 Lincoln Ave NE,Renton, WA 98056EXISTINGUTILITY POLEREMOVE 278' OF EXIST. AERIAL CABLEREMOVE EXISTINGUTILITY POLESSSSWSDSD8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" WD/WD/WD/W REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OHLINCOLN AVE NE1826 NE 38th St,Renton, WA 980563815 Lincoln Ave NE,Renton, WA 98056NE 38TH ST(UNDER CONSTRUCTION)EXISTINGUTILITY POLEREMOVE 284' OF EXIST. AERIAL CABLESCALE: 1:20CONSTRUCTION PLANS - EXISTING PLANT REMOVALTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMCD-14MATCHLINE 'A-A'MATCHLINE 'A-A'SCALE: 1:20MFP23005915 SSSSWWSDWSDW8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" W12" W12" W12" W12" WD/WD/WD/WD/WLINCOLN AVE NE3613 Lincoln Ave NE,Renton, WA 980563617 Lincoln Ave NE,Renton, WA 98056RISER DOWNEXISTINGUTILITY POLE3' X 3' BORE PIT273' BORE ROUTE3' X 3' BORE PIT10' BORE ROUTE3' X 3' BORE PIT. PLACE NEWCATV PEDESTAL UPONCOMPLETIONSSSSWSDSD8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" WD/WD/WD/WCATVCATVCATVCATVLINCOLN AVE NE1826 NE 38th St,Renton, WA 980563815 Lincoln Ave NE,Renton, WA 98056NE 38TH ST(UNDER CONSTRUCTION)3' X 3' BORE PITPSE TO PLACE NEW UTILITY POLE133' OF NEW AERIAL CABLE153' BORE ROUTEEXIST.UTILITYPOLESCALE: 1:20CONSTRUCTION PLANS - NEW PLANTTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMCD-25MATCHLINE 'B-B'MATCHLINE 'B-B'SCALE: 1:20MFP23005915 BORE PIT DETAILSCALE: N.T.S.(E) CURB & SIDEWALK3'x3' BORE/RECEIVING PITTRENCH RESTORATIONPER CITY OF RENTONSTANDARD DETAILS1-4" CONDUIT.BORE DEPTH SHALLBE BELOWSANITARYSEWER MAIN TOCLEAR ALL UTILITYCONSTRUCTION DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMD-16MFP23005915 MUNICIPALITY DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMSD-17MFP23005915 CableCom LLC 1429 AVENUE D #339 SNOHOMISH, WA 98290 (11/28/2023) City of Renton 1825 NE 38th St Renton, WA 98057 RE: Aerial Variance Request for (JB0001632515 ) To whom it may concern: CableCom LLC has been contracted to design and engineer this project on behalf of Comcast Cable Communications Management. Comcast is applying for a variance request to upgrade its existing facilities. Comcast proposed to: This project proposes to remove 562' of existing aerial cable and one existing utility pole. Bore approx. 436' and place one CATV pedestal and one new utility pole. Work takes place on the west side of Lincoln Ave NE. All restoration will be done to or exceed all current city standards. Installation of (1) 4" HDPE conduits. Contractor shall pothole and verify all underground utilities prior to the start of construction. 1 Installation of undergrounding facilities will increase the total cost of construction by roughly 7-10 times the amount of an aerial over-lash on the existing Comcast strand. 1. Risk of potential damage to underground facilities will be increased. 2. 3 Over lash will not cause a substantial adverse impact on other persons or entities in the immediate area. Over lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 3. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 4. The granting of the variance will not be materially detrimental to the public welfare. Comcast does agree to participate in future underground improvements for its proportionate share of the undergrounding costs, waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to ensure the safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Jessamin Santos at (206) 401- 2188. Thank you for your consideration in this matter. Leah Ihlenfeldt Permit Supervisor CableCom LLC (425) 691-9266 snohomish.permitting@cablecomllc.net January 4, 2024 Leah Ihlenfeldt CableCom LLC 19910 North Creek Pkwy, Suite 100 Bothell, WA 98011 Via Email: snohomish.permitting@cablecomllc.net SUBJECT: Request for Undergrounding Exemption (JB#1632515, MFP23005915, 1825 NE 38th St) Dear Mrs. Ihlenfeldt: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Cannon Construction overlash new aerial cable for a total of approximately 133 lineal feet to existing Puget Sound Energy (PSE) poles Lincoln Ave NE within the City. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Comcast Job JB#1632515 Page 2 of 2 January 4, 2024 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, January 18, 2024. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.  The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.  Sincerely, Brianne Bannwarth, PE Development Engineering Director cc: Vanessa Dolbee, Interim CED Administrator Nate Janders, Development Engineering Manager Justin Johnson, Construction Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Engineering Specialist III Franchise Permits Enclosures: Site Plan COVER-TITLETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMScope of work to Target address 1825 NE 38th St·This project proposes to remove 562' of existing aerialcable and one existing utility pole. Bore approx. 436' andplace one CATV pedestal and one new utility pole. Worktakes place on the west side of Lincoln Ave NE. Allrestoration will be done to or exceed all current citystandards.·Installation of (1) 4" HDPE conduits.·Contractor shall pothole and verify all undergroundutilities prior to the start of construction.BUILDIn The City ROW·Bore footage:~436'·Bore Pits:4·Existing Utility Pole(s):3·New Utility Pole:1·New Pedestals:1·Exist. Cable to be Removed:~562'·Overlash footage:~133'VICINITY MAPSHEET INDEXSheet #1C-1Cover-Title2G-1General Notes3SW-1Stormwater Protection Plan4-5CD-1-CD-2Construction Plans6D-1Construction Details7SD-1Municipality StandardsSCALE: NONEContactC-1PROJECT ID: JB16325151SHEETS CD-1AND CD-2Jessamin SantosComcastJessamin_Santos@cable.comcast.com206-401-2188MFP23005915 GENERAL NOTESTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMROADWAY CENTER LINEREMOVE EXISTING AERIAL CABLEEXISTING FENCELINEPROPOSED BORE ROUTEEXISTING WATER LINEEXISTING STORM DRAINEXISTING SANITARY SEWEREXISTING JOINT TRENCHEXISTING RECYCLED WATER LINEEXISTING TV SYSTEMEXISTING GAS SYSTEMEXISTING ELECTRICAL SYSTEMEXISTING TELEPHONE SYSTEMPROPERTY LINELINETYPESBORE PITWATER MANHOLEUNIDENTIFIED MANHOLEGAS METERWATER METERELECTRIC MANHOLESEWER CLEAN OUTSANITARY SEWER MANHOLESTORM DRAIN MANHOLECATCH BASINGAS/WATER VALVETREE/BUSHESGWEXISTING POLEEXISTING COMCAST PEDESTALNEW RISER ATTACHED TO POLEEXISTING IRRIGATION VAULTEXISTING COMCAST VAULTEXISTING UTILITY VAULT/PEDESTALSSCOECOWSDMONUMENTFIRE HYDRANTTRAFFIC SIGNAL COMBINATIONSTREET LIGHTTRANSFORMERNEW COMCAST LOW PROFILE NEW COMCAST PEDESTALNEW COMCAST VAULTPOWER SUPPLY W/ METERNEW COMCAST POWER SUPPLYSYMBOLSEXISTING WATEREXISTING TELEPHONEDRIVEWAYMAXIMUMD/WMAXW T RIGHT OF WAYEXISTING SANITARY SEWEREXISTING STORM DRAINPUBLIC UTILITY EASEMENTPROPERTY LINEMINIMUMFACE OF CURBEXISTINGCENTER LINECOMCASTL MINFOC (E) COMCAST CABBREVIATIONSPUEROWSS SDPL JTSSSDW+++TEGTVCATVNEW AERIAL STRAND/CABLE ROUTEOFFSETO/SBACK OF WALKBOWREMOVAL/REPAIRR/RNEW(N) G-12EDGE OF PAVEMENTEOPANCHOR SUPPORTPROOF & PULL ROUTE (NEW CABLE IN (E) CONDUITS)PROPOSED TRENCH ROUTERWOPGENERAL NOTES1.ALL GENERAL NOTES SHALL APPLY TO ALL DRAWINGS, PLANS AND DETAILS.2.CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA), AT LEAST 48 HOURS(AND NOT MORE THAN 14 DAYS) PRIOR TO THE START OF CONSTRUCTION BY CALLING (800)227-2600.3.CONTRACTOR SHALL POTHOLE/HAND DIG AND VERIFY ALL UNDERGROUND UTILITIES PRIORTO THE START OF CONSTRUCTION. ALL UTILITY LOCATIONS ON PLANS ARE APPROXIMATE,CONTRACTOR MUST VERIFY.4.CONTRACTOR SHALL VERIFY ALL FOOTAGES ON SITE, PRIOR TO THE START OFCONSTRUCTION. ALL DIMENSIONS SHOWN ON PLANS ARE APPROXIMATE.5.CONTRACTOR SHALL KEEP A COPY OF APPROVED PLAN(S) AND PERMIT(S) AT THE JOB SITEAT ALL TIMES AND PRESENT IT TO AN AUTHORIZED AGENT OF THE CITY OF RENTONAND/OR LAW ENFORCEMENT UPON REQUEST.6.CONTRACTOR SHALL ENSURE THAT ANY EXISTING FACILITIES DAMAGED OR REMOVED SHALLBE REPLACED IN KIND OR BETTER, INCLUDING BUT NOT LIMITED TO REPLACING EXISTINGSTRIPING AND REMOVING UNNECESSARY "USA" MARKINGS.7.CONTRACTOR SHALL WORK ONLY DURING APPROVED HOURS, UNLESS OTHERWISEAPPROVED IN WRITING BY THE "CITY ENGINEER."8.CONTRACTOR SHALL PERFORM ALL WORK AND TRAFFIC CONTROL IN ACCORDANCE WITHTHE CITY OF RENTON AND STATE OF WASHINGTON STANDARD PLANS AND SPECIFICATIONS,AND CURRENT WASHINGTON DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORMTRAFFIC CONTROL DEVICES" AND "WASHINGTON MODIFICATION (468-95 WAC)" FOR USE INPERFORMANCE OF WORK UPON HIGHWAYS. FLASHING ARROW SIGNS SHALL BE REQUIREDFOR ALL LANE CLOSURES.9.CONTRACTOR SHALL ENSURE ALL WORK PERFORMED IS IN ACCORDANCE WITHREGULATIONS AND STANDARDS SET BY ANY AND ALL REGULATORY AGENCIES HAVINGJURISDICTION AT THIS WORK SITE, INCLUDING BUT NOT LIMITED TO THE STATE OFWASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, THE STATE OF WASHINGTONDEPARTMENT OF LABOR AND INDUSTRIES, DIVISION OF OCCUPATIONAL SAFETY ANDHEALTH (DOSH), THE COUNTY OF KING, ALL WORK SHALL BE ACCESSIBLE AND SUBJECT TOINSPECTION BY CITY ENGINEER AND/OR AN AUTHORIZED AGENT OF COMCAST.10.CONTRACTOR SHALL "RED-LINE" ALL LAYOUTS, PLANS AND DETAILS, ON THE DAY OFCONSTRUCTION AND SUBMIT A COMPLETE SET OF "AS-BUILT" PLANS TO COMCAST UPONCOMPLETION OF THE PROJECT, AND TO CITY.11.CONTRACTOR SHALL NOTIFY RESIDENTS AFFECTED BY THE WORK IN LANDSCAPED AREA INADVANCE OF CONSTRUCTION.12.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS IN ADVANCE OFWORK COMMENCING.13.LANE CLOSURES ARE PROHIBITED BEFORE 8:30 AM AND AFTER 4:00 PM (3:00 PM OFFRIDAYS AND ON DAYS PRECEDING DESIGNATED LEGAL HOLIDAYS). NO LANE CLOSURES AREPERMITTED ON WEEKENDS AND HOLIDAYS.REMOVE OHREMOVE OHMFP23005915 CONCRETE WASHOUT450 MM(18") MIN.450 MM(18") MIN.25 MM (1") MIN.CONCRETEWASHOUTAREA NOTES:1.) FACE SIGN TOWARD NEAREST STREET OR ACCESS POINT.2.) CONCRETE WASHOUT SHALL BE LOCATED BEHIND THE CURB AND 15 M (50 FT.) MINIMUM FROM DRAINAGE INLETS OR WATERCOURSESBALE CONFIGURATIONTHIS SECTION REMOVED FORGRAPHICAL REPRESENTATIONONLY. STRAW BALE PERIMETERSHALL BE CONTINUOUS.SIGN600 MM(24") MIN.36 CM (14") MIN.3 M (10') MIN. TYP. OF 4 SIDES STRAW BALESAA900 MM(36") MIN.SECTION A - A60 MIL POLYETHYLENE50 X 50 MM (2" X2")STAKES OR #4 J-BARS2 PER BALE TYP.STRAW BALESINLET SEDIMENTCONTROL45° NOTES:1.) SEDIMENT TRAPPED UPSTREAM OF SEDIMENT CONTROL BMP SHALL BE REMOVED WEEKLY AND PRIOR TO A RAINFALL EVENT.2.) PLACE BMP'S TIGHTLY TOGETHER AT JOINTS TO PREVENT OR MINIMIZE SEEPAGE AT JOINTS.GRAVEL BAG(S) OR OTHER ACCEPTEDSEDIMENT CONTROL BMP. PLACE BAGSTIGHT AGAINST FACE OF CURB.BACK OF CURBFACE OF CURBLIP OF GUTTERDRAINAGE INLETWITH FILTER BAGPLAN VIEWSEE NOTE 2FLOWTHE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 0.8 HECTARES (2 ACRES).THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE, NYLON, POLYESTER, OR ETHYLENE FABRIC WITH A MINIMUM TENSILE STRENGTH OF 50 LBS PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GREATER THAN 20 SIEVE AND WITH A MINIMUM FLOW RATE OF 40 GALLONS/MINUTE/SQ FT.THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY THE EXISTING INLET GRATE (OR OTHER APPROVED METHOD), PROVIDING NO MODIFICATION OR DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME. THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 13MM (.5") ABOVE THE INLET FRAME (SEE DETAIL A).THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED.FLOWS SHALL NOT BE ALLOWED TO BYPASS THE BAG. THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF THE INLET, EXCEPT AS SHOWN FOR FLOOD RELEASE.INLET FILTER BAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL DURING THE WET SEASON AND MONTHLY DURING THE DRY SEASON. SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE DEPTH OF THE BAG. BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS. EXISTING DROPINLET GRATEPLACEMENT AT TYPE A, C, D, & F DROP INLETSAND PARKING LOTSEXISTING DROPINLET FRAMEFILTER BAG(OPTIONAL)FRAME EXISTING DROPINLET GRATEBAG DEPTHMAXIMUMDETAIL AOUTLET PIPE1.3 CM (.5")MAXIMUMPLACEMENT AT TYPE B AND E DROP INLETSMINIMUMAT BACK(FLOODRELEASE)5 CM (2")18" MINIMUM EXISTING OPENBACK HOODCONTACTAT FRONTAND SIDESDETAIL AGRATE)MINIMUMBAG WIDTH(BACK OF5 CM (2")MINIMUMDAM CONTACT,ALL SIDESCURBSTORM DRAIN INLETFILTER BAGOUTLET PIPE65DETAIL A4.3.2.NOTES1.FILTER BAGFILTER BAGSTORM WATERPROTECTION PLANSTORM WATER PROTECTION PLANTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMSW-13MFP23005915 SSSSWWSDWSDW8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" W12" W12" W12" W12" WD/WD/WD/WD/W REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OHLINCOLN AVE NE3613 Lincoln Ave NE,Renton, WA 980563617 Lincoln Ave NE,Renton, WA 98056EXISTINGUTILITY POLEREMOVE 278' OF EXIST. AERIAL CABLEREMOVE EXISTINGUTILITY POLESSSSWSDSD8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" WD/WD/WD/W REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OH REMOVE OHLINCOLN AVE NE1826 NE 38th St,Renton, WA 980563815 Lincoln Ave NE,Renton, WA 98056NE 38TH ST(UNDER CONSTRUCTION)EXISTINGUTILITY POLEREMOVE 284' OF EXIST. AERIAL CABLESCALE: 1:20CONSTRUCTION PLANS - EXISTING PLANT REMOVALTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMCD-14MATCHLINE 'A-A'MATCHLINE 'A-A'SCALE: 1:20MFP23005915 SSSSWWSDWSDW8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" W12" W12" W12" W12" WD/WD/WD/WD/WLINCOLN AVE NE3613 Lincoln Ave NE,Renton, WA 980563617 Lincoln Ave NE,Renton, WA 98056RISER DOWNEXISTINGUTILITY POLE3' X 3' BORE PIT273' BORE ROUTE3' X 3' BORE PIT10' BORE ROUTE3' X 3' BORE PIT. PLACE NEWCATV PEDESTAL UPONCOMPLETIONSSSSWSDSD8" SS8" SS8" SS8" SS8" SS8" SS12" SD12" SD12" SD12" SD12" SD12" SD12" W12" W12" W12" W12" WD/WD/WD/WCATVCATVCATVCATVLINCOLN AVE NE1826 NE 38th St,Renton, WA 980563815 Lincoln Ave NE,Renton, WA 98056NE 38TH ST(UNDER CONSTRUCTION)3' X 3' BORE PITPSE TO PLACE NEW UTILITY POLE133' OF NEW AERIAL CABLE153' BORE ROUTEEXIST.UTILITYPOLESCALE: 1:20CONSTRUCTION PLANS - NEW PLANTTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMCD-25MATCHLINE 'B-B'MATCHLINE 'B-B'SCALE: 1:20MFP23005915 BORE PIT DETAILSCALE: N.T.S.(E) CURB & SIDEWALK3'x3' BORE/RECEIVING PITTRENCH RESTORATIONPER CITY OF RENTONSTANDARD DETAILS1-4" CONDUIT.BORE DEPTH SHALLBE BELOWSANITARYSEWER MAIN TOCLEAR ALL UTILITYCONSTRUCTION DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMD-16MFP23005915 MUNICIPALITY DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.1825 NE 38TH ST, RENTON, WAJB1632515-FORCED RELOCATENEW STRAND & BORERENTON70ISSUE FOR PERMIT11/28/2023DOMSD-17MFP23005915 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP23005915 Engineering 1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". 2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 4 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. Page 1 of 1