HomeMy WebLinkAboutMiller Watermain Ext - 248-730-0211/31/2019
Attendees
Justin Johnson (jtjohnson@rentonwa.gov)
Abdoul Gafour (agafour@rentonwa.gov)
Documents
P_Miller Water Main Extension.pdf
Redlines Returned to Applicant_v1.pdf
Record
Message Date Time Document Page Label
1 Justin Johnson: Joined Session 1/28/2019 7:26 AM
2 Justin Johnson: Added 'Page 1 of 7-Plan.pdf'1/28/2019 8:04 AM
3 Justin Johnson: Added 'Page 2of 7-Plan.pdf'1/28/2019 8:04 AM
4 Justin Johnson: Added 'Page 3 of 7-Plan.pdf'1/28/2019 8:05 AM
5 Justin Johnson: Added 'Page 4 of 7-Plan.pdf'1/28/2019 8:05 AM
6 Justin Johnson: Added 'Page 5of 7-Plan.pdf'1/28/2019 8:05 AM
7 Justin Johnson: Added 'Page 6 of 7-Plan.pdf'1/28/2019 8:05 AM
8 Justin Johnson: Added 'Page 7 of 7-Plan.pdf'1/28/2019 8:05 AM
9 Justin Johnson: Deleted 'Page 1 of 7-Plan.pdf'1/28/2019 8:05 AM
10 Justin Johnson: Deleted 'Page 2of 7-Plan.pdf'1/28/2019 8:05 AM
11 Justin Johnson: Deleted 'Page 3 of 7-Plan.pdf'1/28/2019 8:05 AM
12 Justin Johnson: Deleted 'Page 4 of 7-Plan.pdf'1/28/2019 8:05 AM
13 Justin Johnson: Deleted 'Page 5of 7-Plan.pdf'1/28/2019 8:05 AM
14 Justin Johnson: Deleted 'Page 6 of 7-Plan.pdf'1/28/2019 8:05 AM
15 Justin Johnson: Deleted 'Page 7 of 7-Plan.pdf'1/28/2019 8:05 AM
16 Justin Johnson: Added 'P_Miller Water Main Extension.pdf'1/28/2019 8:08 AM P_Miller Water Main
Extension.pdf
17 Justin Johnson: Left Session 1/28/2019 8:17 AM
18 Justin Johnson: Joined Session 1/29/2019 11:52 AM
19 Justin Johnson: Left Session 1/29/2019 11:52 AM
Message Date Time Document Page Label
20 Justin Johnson: Joined Session 1/31/2019 12:52 PM
21 Justin Johnson: Added 'Redlines Returned to Applicant_v1.pdf'1/31/2019 12:54 PM Redlines Returned to
Applicant_v1.pdf
22 Abdoul Gafour: Joined Session 1/31/2019 1:06 PM
23 Abdoul Gafour: Add PolyLine 1/31/2019 1:07 PM P_Miller Water Main
Extension.pdf
5
24 Abdoul Gafour: Add PolyLine 1/31/2019 1:07 PM P_Miller Water Main
Extension.pdf
5
25 Abdoul Gafour: Add PolyLine 1/31/2019 1:08 PM P_Miller Water Main
Extension.pdf
5
26 Abdoul Gafour: Add PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
27 Abdoul Gafour: Add PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
28 Abdoul Gafour: Add PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
29 Abdoul Gafour: Add PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
30 Abdoul Gafour: Add PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
31 Abdoul Gafour: Delete PolyLine 1/31/2019 1:09 PM P_Miller Water Main
Extension.pdf
5
32 Abdoul Gafour: Add PolyLine 1/31/2019 1:10 PM P_Miller Water Main
Extension.pdf
5
33 Abdoul Gafour: Add PolyLine 1/31/2019 1:10 PM P_Miller Water Main
Extension.pdf
5
34 Abdoul Gafour: Add Length Measurement (3.33 ft)1/31/2019 1:13 PM P_Miller Water Main
Extension.pdf
5
Message Date Time Document Page Label
35 Abdoul Gafour: Delete Length Measurement 1/31/2019 1:13 PM P_Miller Water Main
Extension.pdf
5
36 Abdoul Gafour: Add Callout 1/31/2019 1:21 PM P_Miller Water Main
Extension.pdf
5
37 Abdoul Gafour: Delete Callout 1/31/2019 1:22 PM P_Miller Water Main
Extension.pdf
5
38 Abdoul Gafour: Add Cloud+1/31/2019 1:22 PM P_Miller Water Main
Extension.pdf
5
39 Abdoul Gafour: Delete Cloud+1/31/2019 1:22 PM Redlines Returned to
Applicant_v1.pdf
19
40 Abdoul Gafour: Add Callout 1/31/2019 1:22 PM P_Miller Water Main
Extension.pdf
5
41 Abdoul Gafour: Delete Callout 1/31/2019 1:23 PM P_Miller Water Main
Extension.pdf
5
42 Abdoul Gafour: Add Callout 1/31/2019 1:23 PM P_Miller Water Main
Extension.pdf
5
43 Abdoul Gafour: Edit Callout 1/31/2019 1:23 PM P_Miller Water Main
Extension.pdf
5
44 Abdoul Gafour: Edit Callout (ADD: 8" VERTICAL CROSS PER
STD PLAN NO. 300.6 FOR REMOVAL OF POLYPIG)
1/31/2019 1:24 PM P_Miller Water Main
Extension.pdf
5
45 Abdoul Gafour: Add Text Box 1/31/2019 1:30 PM P_Miller Water Main
Extension.pdf
5
46 Abdoul Gafour: Edit Text Box (CONTRACTOR SHALL
PROTECT ALL EXISTING WATER SERVICES LINES
WITHIN ACCESS ROAD DURING CONSTRUCTION OF
NEW WATER MAIN AND OTHER UTILITIES. A
TEMPORARY 2-INCH WATER LINE MAY BE REQUIRED
DURING CONSTRUCTION OF THE NEW WATER MAIN.)
1/31/2019 1:32 PM P_Miller Water Main
Extension.pdf
5
Message Date Time Document Page Label
47 Abdoul Gafour: Add Text Box 1/31/2019 1:32 PM P_Miller Water Main
Extension.pdf
5
48 Abdoul Gafour: Edit Text Box 1/31/2019 1:33 PM P_Miller Water Main
Extension.pdf
5
49 Abdoul Gafour: Delete Text Box 1/31/2019 1:33 PM P_Miller Water Main
Extension.pdf
5
50 Abdoul Gafour: Left Session 1/31/2019 1:34 PM
51 Justin Johnson: Added Callout 1/31/2019 3:08 PM P_Miller Water Main
Extension.pdf
2
52 Justin Johnson: Edited Callout (gas main will need to be
located on the south side of the sewer main)
1/31/2019 3:51 PM P_Miller Water Main
Extension.pdf
2