Loading...
HomeMy WebLinkAboutP_Miller Water Main Extension_SummaryP_Miller Water Main Extension.pdf Markup Summary Subject: Callout Page Label: 2 Page Index: 2 Date: 1/31/2019 3:51:32 PM Status: Color: Layer: Space: gas main will need to be located on the south side of the sewer main 2 (1) Subject: Callout Page Label: 5 Page Index: 5 Date: 1/31/2019 1:24:41 PM Status: Color: Layer: Space: ADD: 8" VERTICAL CROSS PER STD PLAN NO. 300.6 FOR REMOVAL OF POLYPIG 5 (2) Subject: Text Box Page Label: 5 Page Index: 5 Date: 1/31/2019 4:35:59 PM Status: Color: Layer: Space: CONTRACTOR SHALL PROTECT ALL EXISTING WATER SERVICES LINES WITHIN ACCESS ROAD DURING CONSTRUCTION OF NEW WATER MAIN AND OTHER UTILITIES. A TEMPORARY 2-INCH WATER LINE MAY BE REQUIRED DURING CONSTRUCTION OF THE NEW WATER MAIN. gas main will need tobe located on thesouth side of thesewer main ° ADD: 8" VERTICAL CROSS PER STD PLANNO. 300.6 FOR REMOVALOF POLYPIG E N G I N E E R I N G CONTRACTOR SHALL PROTECT ALL EXISTING WATER SERVICES LINESWITHIN ACCESS ROAD DURING CONSTRUCTION OF NEW WATER MAIN ANDOTHER UTILITIES. A TEMPORARY 2-INCH WATER LINE MAY BE REQUIREDDURING CONSTRUCTION OF THE NEW WATER MAIN. E N G I N E E R I N G E N G I N E E R I N Ggas main will need tobe located on thesouth side of thesewer main E N G I N E E R I N G E N G I N E E R I N G °°°°E N G I N E E R I N GADD: 8" VERTICALCROSS PER STD PLANNO. 300.6 FOR REMOVALOF POLYPIGCONTRACTOR SHALL PROTECT ALL EXISTING WATER SERVICES LINESWITHIN ACCESS ROAD DURING CONSTRUCTION OF NEW WATER MAIN ANDOTHER UTILITIES. A TEMPORARY 2-INCH WATER LINE MAY BE REQUIREDDURING CONSTRUCTION OF THE NEW WATER MAIN. E N G I N E E R I N G E N G I N E E R I N G