HomeMy WebLinkAboutRedlines Returned to Applicant_v1Markup Summary
Subject: Cloud+
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:10:57 PM
Color:
Layer:
Space:
please reference the 2 horizontal and 1 vertical city
of renton control monuments used
1 (7)
Subject: Text Box
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:40:51 PM
Color:
Layer:
Space:
W-403301
Subject: Text Box
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:39:04 PM
Color:
Layer:
Space:
WTR-27-4033
Subject: Callout
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:57:47 PM
Color:
Layer:
Space:
C18005570
Subject: Callout
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:39:16 PM
Color:
Layer:
Space:
NOTE THESE NUMBERS TO BE INPUT ON THE
COR TITLE BLOCK. SEE TITLE BLOCK
EXAMPLE SHEET PROVIDED
please reference the 2horizontal and 1 vertical city ofrenton control monuments used
W-403301
WTR-27-4033C18005570
NOTE THESE NUMBERSTO BE INPUT ON THECOR TITLE BLOCK. SEE
TITLE BLOCK EXAMPLESHEET PROVIDED
Subject: Callout
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:40:40 PM
Color:
Layer:
Space:
NOTE THESE NUMBERS TO BE INPUT ON THE
COR TITLE BLOCK. SEE TITLE BLOCK
EXAMPLE SHEET PROVIDED
Subject: Text Box
Page Label: 1
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:27:57 PM
Color:
Layer:
Space:
update plans to include new surface water
standard plans
Subject: Callout
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:29:23 PM
Color:
Layer:
Space:
Is there a driveway cut for the sidewalk?
2 (6)
Subject: Cloud+
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 10:16:03 AM
Color:
Layer:
Space:
unclear what this is trying to show. if gas line is
within area please show it on the plans
Subject: Callout
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:57:53 PM
Color:
Layer:
Space:
C18005570
Subject: Text Box
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:41:01 PM
Color:
Layer:
Space:
W-403302
NOTE THESENUMBERS TO BEINPUT ON THE CORTITLE BLOCK. SEETITLE BLOCK EXAMPLESHEET PROVIDED
update plans to include new surface waterstandard plans
Is there a drivewaycut for the sidewalk?
unclear what this istrying to show. ifgas line is withinarea please show iton the plans
C18005570
W-403302
Subject: Text Box
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:59 PM
Color:
Layer:
Space:
WTR-27-4033
Subject: Callout
Page Label: 2
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 1:27:08 PM
Color:
Layer:
Space:
Provide
Subject: Text Box
Page Label: 3
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:41:22 PM
Color:
Layer:
Space:
W-403303
3 (4)
Subject: Text Box
Page Label: 3
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:15 PM
Color:
Layer:
Space:
WTR-27-4033
Subject: Callout
Page Label: 3
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 2:03:05 PM
Color:
Layer:
Space:
update all details
Subject: Cloud+
Page Label: 3
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 1:58:44 PM
Color:
Layer:
Space:
Update NotesWTR-27-4033Provide
W-403303
WTR-27-4033update all details
Update Notes
Subject: Text Box
Page Label: 4
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:41:32 PM
Color:
Layer:
Space:
W-403304
4 (4)
Subject: Text Box
Page Label: 4
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:15 PM
Color:
Layer:
Space:
WTR-27-4033
Subject: Callout
Page Label: 4
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:58:17 PM
Color:
Layer:
Space:
C18005570
Subject: Callout
Page Label: 4
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 1:57:02 PM
Color:
Layer:
Space:
Replace with STD plan 267.00 and 267.10
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:17:57 AM
Color:
Layer:
Space:
5 (32)
Subject: Group
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:08:48 AM
Color:
Layer:
Space:
W-403304
WTR-27-4033C18005570
Replace with STDplan 267.00 and267.10
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:07:35 PM
Color:
Layer:
Space:
clarify call out
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:05:10 PM
Color:
Layer:
Space:
what is this water line?
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:00:43 PM
Color:
Layer:
Space:
PRV required due to water pressure over 80 PSI
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:57:58 PM
Color:
Layer:
Space:
C18005570
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:21:33 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:07:05 PM
Color:
Layer:
Space:
clarify
clarify call out
what is this waterline?
PRV required due towater pressure over80 PSI
C18005570
clarify
Subject: PolyLine
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:20:51 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:07:51 PM
Color:
Layer:
Space:
Clarify call out
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:09:13 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:13:19 PM
Color:
Layer:
Space:
protect existing water service lines during
construction until new meters are installed.
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:03:01 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:49:59 PM
Color:
Layer:
Space:
label gas line on plan set
SS (E)
SS (E)SS (E)SS (E)
SS (E)
SS (E)
SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)
Clarify call out
protect existingwater service linesduring constructionuntil new meters areinstalled.
label gas line on planset
Subject: Text Box
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:41:43 PM
Color:
Layer:
Space:
W-403305
Subject: Cloud+
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:59:45 PM
Color:
Layer:
Space:
all water meters shall be located on the east side
of the hydrant
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 1:32:35 PM
Color:
Layer:
Space:
include thrust block in clearing limits. will need a
temp construction easement from the neighbor
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/1/2018 10:51:11 AM
Color:
Layer:
Space:
show hammer head turnaround
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:21:34 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:04:25 PM
Color:
Layer:
Space:
Provide all easements within the proposed corridor
for all three properties.
W-403305
all water metersshall be located onthe east side of thehydrant
include thrust blockin clearing limits. willneed a tempconstructioneasement from theneighbor
show hammer headturnaround
Provide all easements within the proposedcorridor for all three properties.
Subject: Line
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:03:05 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:06:54 PM
Color:
Layer:
Space:
clarify
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:58:03 AM
Color:
Layer:
Space:
applicant needs to show proposed building
footprint
Subject: Arrow
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:19:56 AM
Color:
Layer:
Space:
Subject: Cloud+
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:10:50 PM
Color:
Layer:
Space:
Adjust all line work to show existing utilities and
proposed utilities in the correct locations.
Subject: Text Box
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:49 PM
Color:
Layer:
Space:
WTR-27-4033
clarify
applicant needs toshow proposedbuilding footprint
Adjust all line workto show existingutilities andproposed utilities inthe correctlocations.WTR-27-4033
Subject: Text Box
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:19:44 AM
Color:
Layer:
Space:
OR END THE EW WATER LINE 5 FT EAST OF
THE PROPERTY LINE.
Subject: Arrow
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:09:21 AM
Color:
Layer:
Space:
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:23:11 PM
Color:
Layer:
Space:
establish location for new service meter
Subject: Polygon
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 11/2/2018 9:18:25 AM
Color:
Layer:
Space:
Subject: Cloud+
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:02:49 PM
Color:
Layer:
Space:
show only one branch valve not 3 valves
Subject: Callout
Page Label: 5
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:03:58 PM
Color:
Layer:
Space:
clarify line work
OR END THE EW WATER LINE 5 FT EAST OFTHE PROPERTY LINE.
establish locationfor new service meter
show only onebranch valve not 3valves
clarify line work
Subject: Text Box
Page Label: 6
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:41:55 PM
Color:
Layer:
Space:
W-403306
6 (2)
Subject: Text Box
Page Label: 6
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:34 PM
Color:
Layer:
Space:
WTR-27-4033
Subject: Callout
Page Label: 7
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:57:58 PM
Color:
Layer:
Space:
C18005570
7 (3)
Subject: Text Box
Page Label: 7
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:08 PM
Color:
Layer:
Space:
W-403307
Subject: Text Box
Page Label: 7
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:42:28 PM
Color:
Layer:
Space:
WTR-27-4033
W-403306
WTR-27-4033C18005570
W-403307
WTR-27-4033
Subject: Text Box
Page Label: 13
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 9:01:01 AM
Color:
Layer:
Space:
Soils report required as described in section C.1.3
13 (2)
Subject: Text Box
Page Label: 13
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:25:32 PM
Color:
Layer:
Space:
TIR needs to be updated to account for the
complete project that includes both the new
Homes and roadway widening
Subject: Callout
Page Label: 21
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:26:35 PM
Color:
Layer:
Space:
Flow control applies to both the roadway
improvement and new homes to be constructed
21 (2)
Subject: Callout
Page Label: 21
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:26:21 PM
Color:
Layer:
Space:
Project consists of new home + roadway
improvments
Subject: Text Box
Page Label: 22
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 8:59:31 AM
Color:
Layer:
Space:
provide proposed flow control BMP's for both home
and roadway.
22 (4)
Soils report required asdescribed in section C.1.3
TIR needs to beupdated to accountfor the completeproject that includesboth the new Homesand roadway widening
Flow control appliesto both the roadwayimprovement and newhomes to beconstructed
Project consists ofnew home + roadway improvments
provide proposed flow control BMP's for both home and roadway.
Subject: Cloud+
Page Label: 22
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:08:21 PM
Color:
Layer:
Space:
the home impervious surface should be accounted
for since it is part of the same project. the
impervious surface is going to be greater than
2000 sq feet of new impervious surface.
Subject: Callout
Page Label: 22
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 2:26:48 PM
Color:
Layer:
Space:
Water qaulity requirements applies to both the
roadway improvement and new homes to be
constructed
Subject: Cloud+
Page Label: 22
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 4:39:17 PM
Color:
Layer:
Space:
This only addresses erosion control not water
quality as specified by core requirement 8. if
project is exempt specify what exemption criteria
should apply and show it.
Subject: Callout
Page Label: 24
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/30/2018 8:19:36 AM
Color:
Layer:
Space:
verify if the water sheet flows or infiltrates into the
soil.
24 (2)
Subject: Callout
Page Label: 24
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 5:27:53 PM
Color:
Layer:
Space:
provide photo's from the field inspection
Subject: Cloud+
Page Label: 25
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 1:09:22 PM
Color:
Layer:
Space:
correct map
25 (1)
the home impervioussurface should beaccounted for sinceit is part of the sameproject. theimpervious surface isgoing to be greaterthan 2000 sq feet ofnew impervioussurface.
Water qaulityrequirements appliesto both the roadwayimprovement and newhomes to beconstructed
This only addresses erosion control not water quality as specified by core requirement8. if project is exempt specify what exemption criteria should apply and show it.
verify if the watersheet flows orinfiltrates into thesoil.
provide photo's fromthe field inspection
correct map
Subject: Cloud+
Page Label: 62
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:13:43 PM
Color:
Layer:
Space:
Parcel number is incorrect
62 (1)
Subject: Cloud+
Page Label: 65
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:16:08 PM
Color:
Layer:
Space:
doesn't match exhibit
65 (4)
Subject: Cloud+
Page Label: 65
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:18:15 PM
Color:
Layer:
Space:
east
Subject: Text Box
Page Label: 65
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:17:27 PM
Color:
Layer:
Space:
This is calling out 22.5 feet of width and the exhibit
is showing 15 feet of width
Subject: Cloud+
Page Label: 65
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/12/2018 3:18:00 PM
Color:
Layer:
Space:
south
Parcel number isincorrect
doesn't match exhibit
east
This is calling out22.5 feet of widthand the exhibit isshowing 15 feet of
width
south
Subject: Callout
Page Label: 66
Lock: Unlocked
Status:
Checkmark: Unchecked
Date: 10/29/2018 1:30:30 PM
Color:
Layer:
Space:
property owners need to provide easement as well.
66 (1)
property owners needto provide easementas well.
please reference the 2
horizontal and 1 vertical city of
renton control monuments usedWTR-27-4033NOTE THESE NUMBERS
TO BE INPUT ON THE
COR TITLE BLOCK. SEE
TITLE BLOCK EXAMPLE
SHEET PROVIDED
W-403301
NOTE THESE
NUMBERS TO BE
INPUT ON THE COR
TITLE BLOCK. SEE
TITLE BLOCK EXAMPLE
SHEET PROVIDED
C18005570
update plans to include new surface water
standard plans
W-403302WTR-27-4033unclear what this is
trying to show. if
gas line is within
area please show it
on the plans
Provide
C18005570
Is there a driveway
cut for the sidewalk?
W-403303WTR-27-4033update all details
Update Notes
W-403304WTR-27-4033Replace with STD
plan 267.00 and
267.10
C18005570
W-403305WTR-27-4033include thrust block
in clearing limits. will
need a temp
construction
easement from the
neighbor
Provide all easements within the proposed
corridor for all three properties.
what is this water
line?
Clarify call out
clarify
clarify
clarify call out
label gas line on plan
set
C18005570
all water meters
shall be located on
the east side of the
hydrant
PRV required due to
water pressure over
80 PSI
show only one
branch valve not 3
valves
clarify line work
Adjust all line work
to show existing
utilities and
proposed utilities in
the correct
locations.
protect existing
water service lines
during construction
until new meters are
installed.
establish location
for new service meter
show hammer head
turnaround
OR END THE EW WATER LINE 5 FT EAST OFTHE PROPERTY LINE.SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)
applicant needs to
show proposed
building footprint
W-403306WTR-27-4033
W-403307WTR-27-4033C18005570
Soils report required as
described in section C.1.3
TIR needs to be
updated to account
for the complete
project that includes
both the new Homes
and roadway widening
Project consists of
new home + roadway
improvments
Flow control applies
to both the roadway
improvement and new
homes to be
constructed
This only addresses erosion control not water quality as specified by core requirement
8. if project is exempt specify what exemption criteria should apply and show it.
the home impervious
surface should be
accounted for since
it is part of the same
project. the
impervious surface is
going to be greater
than 2000 sq feet of
new impervious
surface.
provide proposed flow control BMP's for both home and roadway.
Water qaulity
requirements applies
to both the roadway
improvement and new
homes to be
constructed
provide photo's from
the field inspection
verify if the water
sheet flows or
infiltrates into the
soil.
correct map
Parcel number is
incorrect
doesn't match exhibit This is calling out
22.5 feet of width
and the exhibit is
showing 15 feet of
width
south
east
property owners need
to provide easement
as well.