Loading...
HomeMy WebLinkAboutREDLINEdwg_signed permit set_20180320R-394403ted-40-3944C18001407PR18000003Soos creek w&S district cascade hills water main replacement1 typical typical typical CORRECTIONS - RESUBMIT 04/16/2018 rnair DEVELOPMENT ENGINEERING DIVISION based on the plans it appears that survey monuments may be disturbed or destroyed during construction. per wac 332-120 an application must be filed with the dnr and stamped by a licensed land surveyor or engineer. please file the appropriate documentation with the dnr prior to construction and then refile after the construction completion as required by the state. the city of renton also requires monument cards to be completed and sent to the city for any monuments that are set during this project due to destruction during construction. please provide those cards as necessary after the completion of the construction. CITY OF RENTON SURFACEWATER MAINTENACE CREWS WILL REPAIR FAILING SURFACEWATER STRUCTURES WITHIN THE NEWLY PAVED SECTIONS. THIS WILL INCLUDE REPLACEING CURB AND GUTTER INVOLVED IN THOSE REPAIRS. STRUCTURE REPARS WITHEN THE AREA OF WHEEL CHAR RAMPS WILL NOT INCLUDE CONCRETE RESTORATION. CITY WORK PRIOR TOTHE PAVING BY SOOS CREEK. WITHIN include city if renton standard driveway plan since some driveways are proposed to be changed. add note that ada compliant curb ramps will be provided at locations where water work cuts into existing sidewalk. separate traffic control plan is required to be submitted by the contractor and approval to be obtained from city prior to start of work in the city row. add std plan 104.1. add std plan 104.2. std plan 102 provides necessary information use std plan 110 use std plan 110.1 The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 16" pipe, adjust the top of wm value to 1.20' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 15" pipe, adjust the top of wm value to 1.19' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. For 24" pipe, adjust the top of wm value to 1.25' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. ADD ONE FIRE HYDRANT TO MEET CITY CODE FOR MAXIMUM SPACING OF 600-FEET ON CENTER. RELOCATE PROPOSED HYDRANT BACK TO VERY NEAR THE INTERSECTION SIMILIAR TO THE EXISTING FIRE HYDRANT. HERE OR HERE The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. REDLINE Markup PLAN Summary CASCADE HILLS V1 SOOS CREEK Subject: Text Box Page Label: 1 Page Index: 1 Status: Author: jcisneros Date: 03/22/2018 8:11:24 AM Creation Date: 03/22/2018 8:10:53 AM Color: Layer: Space: R-394403 03/22/2018 8:11:24 AM (1) Subject: Callout Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:26:49 AM Creation Date: 03/29/2018 10:24:17 AM Color: Layer: Space: ADD ONE FIRE HYDRANT TO MEET CITY CODE FOR MAXIMUM SPACING OF 600-FEET ON CENTER. 03/29/2018 10:26:49 AM (1) Subject: Callout Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:28:29 AM Creation Date: 03/29/2018 10:27:12 AM Color: Layer: Space: RELOCATE PROPOSED HYDRANT BACK TO VERY NEAR THE INTERSECTION SIMILIAR TO THE EXISTING FIRE HYDRANT. 03/29/2018 10:28:29 AM (1) Subject: Arrow Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:29:58 AM Creation Date: 03/29/2018 10:29:58 AM Color: Layer: Space: 03/29/2018 10:29:58 AM (1) R-394403 ADD ONE FIREHYDRANT TO MEETCITY CODE FORMAXIMUM SPACINGOF 600-FEET ONCENTER. RELOCATE PROPOSEDHYDRANT BACK TO VERY NEAR THEINTERSECTION SIMILIAR TO THEEXISTING FIRE HYDRANT. Subject: Arrow Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:30:31 AM Creation Date: 03/29/2018 10:30:31 AM Color: Layer: Space: 03/29/2018 10:30:31 AM (1) Subject: Typewritten Text Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:32:07 AM Creation Date: 03/29/2018 10:31:57 AM Color: Layer: Space: HERE 03/29/2018 10:32:07 AM (1) Subject: Typewritten Text Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:32:14 AM Creation Date: 03/29/2018 10:32:07 AM Color: Layer: Space: OR HERE 03/29/2018 10:32:14 AM (1) Subject: Typewritten Text Page Label: 23 Page Index: 23 Status: Author: cthomas Date: 03/29/2018 10:32:29 AM Creation Date: 03/29/2018 10:32:29 AM Color: Layer: Space: 03/29/2018 10:32:29 AM (1) HERE OR HERE Subject: Text Box Page Label: 5 Page Index: 5 Status: Author: aaskren Date: 04/02/2018 10:22:45 AM Creation Date: 04/02/2018 10:17:14 AM Color: Layer: Space: based on the plans it appears that survey monuments may be disturbed or destroyed during construction. per wac 332-120 an application must be filed with the dnr and stamped by a licensed land surveyor or engineer. please file the appropriate documentation with the dnr prior to construction and then refile after the construction completion as required by the state. the city of renton also requires monument cards to be completed and sent to the city for any monuments that are set during this project due to destruction during construction. please provide those cards as necessary after the completion of the construction. 04/02/2018 10:22:45 AM (1) Subject: Callout Page Label: 17 Page Index: 17 Status: Author: KRevans Date: 04/04/2018 10:49:08 AM Creation Date: 04/04/2018 10:46:30 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. 04/04/2018 10:49:08 AM (1) Subject: Callout Page Label: 22 Page Index: 22 Status: Author: KRevans Date: 04/04/2018 10:50:07 AM Creation Date: 04/04/2018 10:49:57 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. 04/04/2018 10:50:07 AM (1) Subject: Callout Page Label: 23 Page Index: 23 Status: Author: KRevans Date: 04/04/2018 10:50:33 AM Creation Date: 04/04/2018 10:50:16 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. 04/04/2018 10:50:33 AM (1) based on the plans it appears that surveymonuments may be disturbed or destroyedduring construction. per wac 332-120 an application must befiled with the dnr and stamped by alicensed land surveyor or engineer. please file the appropriatedocumentation with the dnr prior toconstruction and then refile after theconstruction completion as required bythe state. the city of renton also requiresmonument cards to be completed andsent to the city for any monuments thatare set during this project due todestruction during construction. pleaseprovide those cards as necessary afterthe completion of the construction. The top of wm values will need to beadjusted to include the thickness of theexisting storm pipe. For 8" pipe, adjust thetop of wm value to 1.15' below the sd pipeie value. For 12" pipe, adjust the top of wmvalue to 1.17' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thickness of theexisting storm pipe. For 8" pipe, adjust thetop of wm value to 1.15' below the sd pipeie value. For 12" pipe, adjust the top of wmvalue to 1.17' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thicknessof the existing storm pipe. For 12"pipe, adjust the top of wm value to1.17' below the sd pipe ie value. Subject: Callout Page Label: 24 Page Index: 24 Status: Author: KRevans Date: 04/04/2018 10:50:53 AM Creation Date: 04/04/2018 10:50:39 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. 04/04/2018 10:50:53 AM (1) Subject: Callout Page Label: 19 Page Index: 19 Status: Author: KRevans Date: 04/04/2018 10:53:24 AM Creation Date: 04/04/2018 10:52:17 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 16" pipe, adjust the top of wm value to 1.20' below the sd pipe ie value. 04/04/2018 10:53:24 AM (1) Subject: Callout Page Label: 21 Page Index: 21 Status: Author: KRevans Date: 04/04/2018 10:53:55 AM Creation Date: 04/04/2018 10:51:13 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. 04/04/2018 10:53:55 AM (1) Subject: Callout Page Label: 18 Page Index: 18 Status: Author: KRevans Date: 04/04/2018 10:54:12 AM Creation Date: 04/04/2018 10:54:07 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 8" pipe, adjust the top of wm value to 1.15' below the sd pipe ie value. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. 04/04/2018 10:54:12 AM (1) Subject: Callout Page Label: 20 Page Index: 20 Status: Author: KRevans Date: 04/04/2018 10:55:09 AM Creation Date: 04/04/2018 10:54:26 AM Color: Layer: Space: The top of wm values will need to be adjusted to include the thickness of the existing storm pipe. For 12" pipe, adjust the top of wm value to 1.17' below the sd pipe ie value. For 15" pipe, adjust the top of wm value to 1.19' below the sd pipe ie value. For 18" pipe, adjust the top of wm value to 1.21' below the sd pipe ie value. For 24" pipe, adjust the top of wm value to 1.25' below the sd pipe ie value. 04/04/2018 10:55:09 AM (1) The top of wm values will need to beadjusted to include the thicknessof the existing storm pipe. For 8"pipe, adjust the top of wm value to1.15' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thickness ofthe existing storm pipe. For 12" pipe,adjust the top of wm value to 1.17'below the sd pipe ie value. For 16"pipe, adjust the top of wm value to1.20' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thickness of theexisting storm pipe. For 8" pipe, adjust thetop of wm value to 1.15' below the sd pipeie value. For 12" pipe, adjust the top of wmvalue to 1.17' below the sd pipe ie value.For 18" pipe, adjust the top of wm value to1.21' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thickness of theexisting storm pipe. For 8" pipe, adjust thetop of wm value to 1.15' below the sd pipeie value. For 12" pipe, adjust the top of wmvalue to 1.17' below the sd pipe ie value.For 18" pipe, adjust the top of wm value to1.21' below the sd pipe ie value. The top of wm values will need to beadjusted to include the thickness of theexisting storm pipe. For 12" pipe, adjustthe top of wm value to 1.17' below the sdpipe ie value. For 15" pipe, adjust the topof wm value to 1.19' below the sd pipe ievalue. For 18" pipe, adjust the top of wmvalue to 1.21' below the sd pipe ie value.For 24" pipe, adjust the top of wm value to1.25' below the sd pipe ie value. Subject: Line Page Label: 6 Page Index: 6 Status: Author: rnair Date: 04/04/2018 5:50:27 PM Creation Date: 04/04/2018 5:50:19 PM Color: Layer: Space: 04/04/2018 5:50:27 PM (1) Subject: Line Page Label: 6 Page Index: 6 Status: Author: rnair Date: 04/04/2018 5:50:36 PM Creation Date: 04/04/2018 5:50:36 PM Color: Layer: Space: 04/04/2018 5:50:36 PM (1) Subject: Line Page Label: 6 Page Index: 6 Status: Author: rnair Date: 04/04/2018 5:51:33 PM Creation Date: 04/04/2018 5:51:33 PM Color: Layer: Space: 04/04/2018 5:51:33 PM (1) Subject: Line Page Label: 6 Page Index: 6 Status: Author: rnair Date: 04/04/2018 5:51:56 PM Creation Date: 04/04/2018 5:51:56 PM Color: Layer: Space: 04/04/2018 5:51:56 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:54:59 PM Creation Date: 04/04/2018 5:53:41 PM Color: Layer: Space: 04/04/2018 5:54:59 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:55:07 PM Creation Date: 04/04/2018 5:53:59 PM Color: Layer: Space: 04/04/2018 5:55:07 PM (1) Subject: Highlight Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:57:20 PM Creation Date: 04/04/2018 5:57:20 PM Color: Layer: Space: 04/04/2018 5:57:20 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:58:02 PM Creation Date: 04/04/2018 5:57:52 PM Color: Layer: Space: 04/04/2018 5:58:02 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:58:10 PM Creation Date: 04/04/2018 5:58:10 PM Color: Layer: Space: 04/04/2018 5:58:10 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:58:16 PM Creation Date: 04/04/2018 5:54:23 PM Color: Layer: Space: 04/04/2018 5:58:16 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:58:55 PM Creation Date: 04/04/2018 5:54:17 PM Color: Layer: Space: 04/04/2018 5:58:55 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:59:07 PM Creation Date: 04/04/2018 5:59:07 PM Color: Layer: Space: 04/04/2018 5:59:07 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:59:14 PM Creation Date: 04/04/2018 5:59:14 PM Color: Layer: Space: 04/04/2018 5:59:14 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:59:41 PM Creation Date: 04/04/2018 5:59:41 PM Color: Layer: Space: 04/04/2018 5:59:41 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 5:59:51 PM Creation Date: 04/04/2018 5:59:51 PM Color: Layer: Space: 04/04/2018 5:59:51 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:00 PM Creation Date: 04/04/2018 6:00:00 PM Color: Layer: Space: 04/04/2018 6:00:00 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:08 PM Creation Date: 04/04/2018 6:00:08 PM Color: Layer: Space: 04/04/2018 6:00:08 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:26 PM Creation Date: 04/04/2018 6:00:26 PM Color: Layer: Space: 04/04/2018 6:00:26 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:34 PM Creation Date: 04/04/2018 6:00:34 PM Color: Layer: Space: 04/04/2018 6:00:34 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:43 PM Creation Date: 04/04/2018 6:00:43 PM Color: Layer: Space: 04/04/2018 6:00:43 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:49 PM Creation Date: 04/04/2018 6:00:49 PM Color: Layer: Space: 04/04/2018 6:00:49 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:00:58 PM Creation Date: 04/04/2018 6:00:58 PM Color: Layer: Space: 04/04/2018 6:00:58 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:01:03 PM Creation Date: 04/04/2018 6:01:03 PM Color: Layer: Space: 04/04/2018 6:01:03 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:01:19 PM Creation Date: 04/04/2018 6:01:19 PM Color: Layer: Space: 04/04/2018 6:01:19 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:01:27 PM Creation Date: 04/04/2018 6:01:27 PM Color: Layer: Space: 04/04/2018 6:01:27 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:01:35 PM Creation Date: 04/04/2018 6:01:35 PM Color: Layer: Space: 04/04/2018 6:01:35 PM (1) Subject: Line Page Label: 17 Page Index: 17 Status: Author: rnair Date: 04/04/2018 6:01:45 PM Creation Date: 04/04/2018 6:01:41 PM Color: Layer: Space: 04/04/2018 6:01:45 PM (1) Subject: Text Box Page Label: 12 Page Index: 12 Status: Author: rnair Date: 04/11/2018 4:31:09 PM Creation Date: 04/05/2018 1:00:24 PM Color: Layer: Space: include city if renton standard driveway plan since some driveways are proposed to be changed. add note that ada compliant curb ramps will be provided at locations where water work cuts into existing sidewalk. separate traffic control plan is required to be submitted by the contractor and approval to be obtained from city prior to start of work in the city row. 04/11/2018 4:31:09 PM (1) Subject: Text Box Page Label: 5 Page Index: 5 Status: Author: rwmarshall Date: 04/12/2018 11:48:29 AM Creation Date: 04/12/2018 7:41:57 AM Color: Layer: Space: CITY OF RENTON SURFACEWATER MAINTENACE CREWS WILL REPAIR FAILING SURFACEWATER STRUCTURES WITHIN THE NEWLY PAVED SECTIONS. THIS WILL INCLUDE REPLACEING CURB AND GUTTER INVOLVED IN THOSE REPAIRS. STRUCTURE REPARS WITHEN THE AREA OF WHEEL CHAR RAMPS WILL NOT INCLUDE CONCRETE RESTORATION. 04/12/2018 11:48:29 AM (1) Subject: Callout Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 12:41:14 PM Creation Date: 04/16/2018 12:40:53 PM Color: Layer: Space: use std plan 110 04/16/2018 12:41:14 PM (1) include city if renton standard driveway plansince some driveways are proposed to bechanged. add note that ada compliant curb ramps willbe provided at locations where water workcuts into existing sidewalk. separate traffic control plan is required tobe submitted by the contractor and approvalto be obtained from city prior to start ofwork in the city row. CITY OF RENTONSURFACEWATERMAINTENACE CREWSWILL REPAIR FAILINGSURFACEWATERSTRUCTURES WITHINTHE NEWLY PAVEDSECTIONS. THIS WILLINCLUDE REPLACEINGCURB AND GUTTERINVOLVED IN THOSEREPAIRS. STRUCTUREREPARS WITHEN THEAREA OF WHEELCHAR RAMPS WILLNOT INCLUDECONCRETERESTORATION. use std plan 110 Subject: Callout Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 12:42:13 PM Creation Date: 04/16/2018 12:41:58 PM Color: Layer: Space: use std plan 110.1 04/16/2018 12:42:13 PM (1) Subject: Text Box Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:13:57 PM Creation Date: 04/16/2018 2:07:21 PM Color: Layer: Space: ted-40-3944 04/16/2018 2:13:57 PM (1) Subject: Text Box Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:14:56 PM Creation Date: 04/16/2018 2:14:02 PM Color: Layer: Space: Soos creek w&S district cascade hills water main replacement 04/16/2018 2:14:56 PM (1) Subject: Text Box Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:15:24 PM Creation Date: 04/16/2018 2:12:54 PM Color: Layer: Space: C18001407 04/16/2018 2:15:24 PM (1) Subject: Text Box Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:15:51 PM Creation Date: 04/16/2018 2:13:24 PM Color: Layer: Space: PR18000003 04/16/2018 2:15:51 PM (1) use std plan 110.1 ted-40-3944Soos creek w&S district cascade hills water main replacementC18001407PR18000003 Subject: Rectangle Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:16:46 PM Creation Date: 04/16/2018 2:16:46 PM Color: Layer: Space: 04/16/2018 2:16:46 PM (1) Subject: Typewritten Text Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:18:17 PM Creation Date: 04/16/2018 2:16:57 PM Color: Layer: Space: 1 04/16/2018 2:18:17 PM (1) Subject: Callout Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:20:33 PM Creation Date: 04/16/2018 2:20:20 PM Color: Layer: Space: typical 04/16/2018 2:20:33 PM (1) Subject: Arrow Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:20:45 PM Creation Date: 04/16/2018 2:20:45 PM Color: Layer: Space: 04/16/2018 2:20:45 PM (1) Subject: Callout Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:21:23 PM Creation Date: 04/16/2018 2:19:37 PM Color: Layer: Space: typical 04/16/2018 2:21:23 PM (1) 1 typical typical Subject: Callout Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 2:21:40 PM Creation Date: 04/16/2018 2:21:37 PM Color: Layer: Space: typical 04/16/2018 2:21:40 PM (1) Subject: Line Page Label: 15 Page Index: 15 Status: Author: rnair Date: 04/16/2018 5:02:30 PM Creation Date: 04/16/2018 5:02:30 PM Color: Layer: Space: 04/16/2018 5:02:30 PM (1) Subject: Line Page Label: 15 Page Index: 15 Status: Author: rnair Date: 04/16/2018 5:02:38 PM Creation Date: 04/16/2018 5:02:38 PM Color: Layer: Space: 04/16/2018 5:02:38 PM (1) Subject: Text Box Page Label: 15 Page Index: 15 Status: Author: rnair Date: 04/16/2018 5:03:23 PM Creation Date: 04/16/2018 5:02:58 PM Color: Layer: Space: std plan 102 provides necessary information 04/16/2018 5:03:23 PM (1) Subject: Line Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 5:04:05 PM Creation Date: 04/16/2018 5:04:05 PM Color: Layer: Space: 04/16/2018 5:04:05 PM (1) typical std plan 102provides necessaryinformation Subject: Line Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 5:04:10 PM Creation Date: 04/16/2018 5:04:10 PM Color: Layer: Space: 04/16/2018 5:04:10 PM (1) Subject: Line Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 5:04:16 PM Creation Date: 04/16/2018 5:04:16 PM Color: Layer: Space: 04/16/2018 5:04:16 PM (1) Subject: Line Page Label: 16 Page Index: 16 Status: Author: rnair Date: 04/16/2018 5:04:20 PM Creation Date: 04/16/2018 5:04:20 PM Color: Layer: Space: 04/16/2018 5:04:20 PM (1) Subject: Text Box Page Label: 14 Page Index: 14 Status: Author: rnair Date: 04/16/2018 5:20:41 PM Creation Date: 04/16/2018 2:58:14 PM Color: Layer: Space: add std plan 104.1. add std plan 104.2. 04/16/2018 5:20:41 PM (1) Subject: Rectangle Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:28:46 PM Creation Date: 04/16/2018 5:28:42 PM Color: Layer: Space: 04/16/2018 5:28:46 PM (1) add std plan 104.1. add std plan 104.2. Subject: Rectangle Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:28:53 PM Creation Date: 04/16/2018 5:28:53 PM Color: Layer: Space: 04/16/2018 5:28:53 PM (1) Subject: Rectangle Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:29:07 PM Creation Date: 04/16/2018 5:29:00 PM Color: Layer: Space: 04/16/2018 5:29:07 PM (1) Subject: Typewritten Text Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:29:51 PM Creation Date: 04/16/2018 5:29:42 PM Color: Layer: Space: PRIOR TO 04/16/2018 5:29:51 PM (1) Subject: Typewritten Text Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:30:42 PM Creation Date: 04/16/2018 5:29:55 PM Color: Layer: Space: THE PAVING BY SOOS CREEK. 04/16/2018 5:30:42 PM (1) Subject: Rectangle Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:31:03 PM Creation Date: 04/16/2018 5:30:28 PM Color: Layer: Space: 04/16/2018 5:31:03 PM (1) PRIOR TO THE PAVING BY SOOS CREEK. Subject: Typewritten Text Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:31:09 PM Creation Date: 04/16/2018 5:29:38 PM Color: Layer: Space: CITY WORK 04/16/2018 5:31:09 PM (1) Subject: Rectangle Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:31:25 PM Creation Date: 04/16/2018 5:31:25 PM Color: Layer: Space: 04/16/2018 5:31:25 PM (1) Subject: Typewritten Text Page Label: 5 Page Index: 5 Status: Author: rnair Date: 04/16/2018 5:31:34 PM Creation Date: 04/16/2018 5:31:34 PM Color: Layer: Space: WITHIN 04/16/2018 5:31:34 PM (1) Subject: Approved - Planning Page Label: 1 Page Index: 1 Status: Author: rnair Date: 04/16/2018 5:37:39 PM Creation Date: 04/16/2018 5:37:27 PM Color: Layer: Space: 04/16/2018 5:37:39 PM (1) CITY WORK WITHIN CORRECTIONS - RESUBMIT 04/16/2018 rnair DEVELOPMENT ENGINEERING DIVISION