HomeMy WebLinkAboutChange Order - 15DocuSign Envelope ID: 88580849-0899-418C-9DAD-74A98245A345 CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT 12/27/2023 CONTRACT: CAG-22-015 CONTRACTOR: Active Construction Inc. CHANGE ORDER: #15 SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1) Added bollards and associated site work to prevent vehicle use on parkland as requested by Parks Maintenance. DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 Added bollards and associated site work. $ 87,006.09 $ 95,793.71 - Total this Change Order: $ 95,793.71 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT THIS ORDER (W / WSST) TOTAL AFTER CHANGE $ 4,711,486.18 $ 5,054,966.88 $ 95,793.71 $ 5,150,760.59 Additional Calendar Days: (30)Calendar days extension of time is included. New completion date is January 29, 2023. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original aereement. All of the other terms orieinal reement remain in effect. SIGNATURES: Project Manager: Approved By: (Mayor) Date: ) 9 Z.o Date 1/8/2024 Date: CAG-22-015, CO #15-24 1/9/2024 Attest: _________________________ Jason A. Seth, City Clerk DocuSign Envelope ID: 88580B49-0B99-418C-9DAD-74A98245A345 BOLLARD BREAKDOWN (We did not wait for updated quotes): 1. Phoenician bollards: $10,328 / 6 EA= -$1721.33 • 2�$3,442.66 + $10,328 = $6885.34 (rounded to $6,886) 2.Surface Mounted: $26,808 / 42EA = $638.29 • 2 EA= $1276.58 + $26,808 = $28084.58 (rounded to $28,085}Ii IROIISMITH Sales Quotation Sales Rep: Northwest Playground Project : Philip Arnold Park Location: Renton, WA USA QUOTE NUMBER: 109967 Quote Date: 12/12/2023 Valid To: 1/12/2024 Revision: 0 QTY UNIT ITEM ID DESCRIPTION UNIT PRICE EXTENSION 6 Each 9028-6RA Phoenician Pipe bollard . Cast aluminum cap 36"x 6" schedule 40 Aluminum column. Removable -Finish: $1,057.00 Powder Coat Black 12 Each 9000R-6 Cast Iron Inground receiver for 6" removable pipe bollard. Irnbeded section finished black dip. Cover $268.00 Lead times vary by product and current demand. Please contact Ironsmith for current lead times. Quote valid for these items and quantities only. Please insure items are correct for your project. Sub Total Out of State 0.00% Sales Tax Freight One Load to: Renton $6,342.00 $3,216.00 $9,558.00 $0.00 $770.00 Frames and/or Receivers can ship separately for an additional $465.00 TOTAL $10,328.00 Typical lead time frames / receivers 3 to 4 weeks Terms: SO% with order, balance before final shipment. See attached for complete terms and conditions. IRONSMITH,INC. 41-701 Corporate Way #3 Palm Desert,CA 92260 800.338.4766 Fax: 760.776.5080 Web: www.ironsmith.biz Page 1 of 3 Doc"Slg, E,,elope ID 88580B49-0B99-41SC.P7H40 E N I CI AN I I .£ ..-t> '° 0) OJ (") .. C Q. .-ti(\] OJ ·a.C) � (") C) OJ """ Q. I _i_ _ _L I 7• t .£ -t> 0) ,. C (\J OJ (") � OJ Q. Q. 15�' 8 r OJ Q. ·a. C) """ 9028-6R Q.OJ �:::5 1:5 OJ 90 � :::5 1:5 28-4R OJ OJ .£ .£ u uVl Vl ..'° o] .. """ o] 3SQ'.'. w .. (\J ...... (/) >I- .......Q'.'.W t WU C/lW ZQ'.'. ....... --EB EB T REMOVABLE PIPE BOLLARDS •BOLLARD CAPS ARE CAST ALUMINUM FROM RECYCLED MATERIAL •CAPS ARE FACTORY MOUNTED TO PIPE •PIPE IS SCHEDULE 40. HEAVY WALL PIPE AVAILABLE ON REQUEST •CAN BE FINISHED IN A RANGE OF FINISHES AND COLORS OR SUPPLIED UNFINISHED TO PAINT ON SITE •FOR USE WITH IRONSMITH LOCK TAB RECEIVERS IRONSMITH BOLLARDS FOR LANDSCAPE ARCHITECTURE (800)338-4766 DocuSign Envelope ID: 88580B49-0B99-418C-9DAD-74A98245A345 065."8 � CJD SECTION A-A l 12" L_j- • . ., .. .. . . .• . : • '!. •• 4 . C .. :� .• 4 ••. 1J Ii.... 0 0 co 0 -�-TA � 0 11!-· , . ... . � .,, ;.41 12 3/8" 8 1/2" Concrete flush with top edge of receiver 171114 .. .. . . • 9000R-6 Removable top plate I Receiver for clean out or part replacement Receiver has 1 /2" maximum slot opening for pedestrian safety when bollard is removed. '---Lock Tab From 100% Recycled CAST GRAY IRON Opening Cast In Anchors Lock Tab automatically drops below grade when bollard is removed. .• . : • '!. •• 4 . C .. ·;.· . 4 ••. 1J Ii.... 0 0 co 0 Gravel base is recommended for drainage. Pop-up Concrete profile and sump depth to be Tab determined by installer Lock based on site conditions. ... • � "' Lock tab opening must be kept clear, protect with tape during concrete pour. ;.41 �m • • 111111 , . 111 ••·•.· 111111 .:_IUIII This drawing embodies a confidential proprietary design of IRONSMITH,INC. Palm Desert.CA. All design, manufacturing,reproduction,use,sale and other rights regarding the same are expressly reserved. This drawing is submitted under confidential relationship for a specific purpose and the recipient agrees by accepting this drawing not to supply or disclose any information regarding it to any unauthorized person or to incorporate any special feature peculiar to this design in other projects. The information in this drawing may be covered completely or in part by patents pending. IRONSNITH 41701 Corporate Way #3 Palm Desert, CA 92260 (800)-338-4766 www.ironsmith.biz DocuSign Envelope ID: 88580B49-0B99-418C-9DAD-74A98245A345 Highwire, Inc. 1116 NJ St Tacoma, WA 98403 Estimate 1. Phoenician bollards: $10,328 / 6 EA= -$1721.33 • 2 = -$3,442.66 + $10,328 = $6885.34 (rounded to $6,886) 2. Surface Mounted: $2 ,808 / 4"2EA = $638.29 • 2 EA= $1276.58 + $26,808 = $28084.58 (rounded to $28,085) ADDRESS Active Construction PO Box 430 Puyallup, WA 98371 PROJECT NAME O23-1674 I Phillip Arnold Park ACTIVITY 2-Urban Accessories:Bollard SHIP TO Active Construction PO Box 430 Puyallup, WA 98371 CONTACT Josh 253 349-1336 EB-36 Bollard I Surface Mount I Steel I PC Color: Black 2-Urban Accessories:ExpediteExpedite for 8 weeks or less* shippinp:Freight Freight Equipment Lead Time begins from receipt of deposit. QTY 42 SUBTOTAL TAX ESTIMATE# 3897 DATE 12/15/2023 EXPIRATION DATE 01/15/2024 EST LEAD TIME / EST DEL DATE 11-14 weeks PRICE 472.00 5,980.00 1,004.00 AMOUNT 19,824.00 5,980.00 1,004.00 26,808.00 0.00 Payment terms: 50% deposit, net 30 upon shipment, late fees will apply. Installation pricing (if provided) is estimated, actual pricing may vary and may not include all site prep and installation services required. TOTAL $26,808.00 Customer is responsible for regular maintenance following installation, to ensure full effect of warranty Customer is responsible for receiving and off-loading equipment at time of delivery (site must be accessible to class 8 vehicles). Highwire assumes no responsibility for underground obstacles, for proper drainage, or for geotechnical issues such as sinkholes, settling, etc. Equipment is designed for level site, not to exceed 1 % grade (unless otherwise specified in design) , if in-ground footings, site must be free of underground obstacles such as utilities, drainage systems and large boulders. (additional charges may apply) Equipment pricing is valid for 30 days, Freight prices a valid for 30 days (subject to change) Accepted By Accepted Date GFeait GaFa 13aymeAtS aaa 3.6%. GaAeellea eFaeFs may be subject tea 40% rnsteekiAg fee. PaymeAt teFms: balaAee 13aia iA full u13eA iAstallatieA, late fees will a1313ly.