Loading...
HomeMy WebLinkAboutMFP23005027.pdfNote: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering MFP23005027 265 RAINIER AVE S, RENTON, WA 98057 2/5/2024 2/8/2024 9am 4pm Northsky Communications Mike Smith Trench 40' ROW and 5' sidewalk push. 15' ROW trench and 35' ROW driveway bore. 80' ROW trench on 265 RAINIER AVE S, RENTON, WA 98057. 16701 SE McGillivray Blvd Vancouver 98683 23072816 425-615-7121 Holly Powers - CED 1/17/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Merilyn Luong 1/11/2024 SIGN STAND TYPE III BARRICADE TRAFFIC CONE/DELINEATOR FLASHING ARROW BOARD WORK AREA / CLOSURE FLAGGER Date:09/27/2023 Author:Brian Carnline WA TC Supervisor # 013104 Project:265 Rainier Ave S, Renton WA 98057Contractor:North Sky Communications Page:1 Quest Job :23072816 Comments: Right Lane Closure Cones to be used in all Tangents and Tapers RAINIER AVE S (1) All spacing may be adjusted to accommodate interchange ramps, at-grade intersections, and driveways. (2) This spacing may be reduced in urban areas to fit roadway conditions. RURAL HIGHWAYS RURAL ROADS RURAL ROADS & URBAN ARTERIALS RURAL ROADS, URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. 60/65 MPH 45/55 MPH 35/40 MPH 25/30 MPH 25 MPH OR LESS 800' SIGN SPACING=X (FEET) (1) 500' 350' 200' 100'(2) (2) FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR AS PER MUTCD) MINIMUM TAPER LENGTH IN FEET (L) LANE WIDTH (FEET) POSTED SPEED LIMIT (MPH) 10 11 12 3025 35 40 45 50 55 60 65 70 105 115 180 205 225 320 540 495 450270 295 245 165 150 125 550 500 680 600 720 780 840 550 605 660 RAINIER AVE S S 2 STD/W100' TRENCH BORE ROAD WORK AHEAD 245'350'RIGHT LANECLOSEDAHEAD350'350' 350'ROADWORKAHEADROADWORKAHEADwww.invarion.com Provide a signed traffic control application with the traffic control plans. RAINIER AVE S WALGREENS MIDAS SANSONINA HERTZ/LYFT WENDY'S TACO TIME SAFEWAY 25TACORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 142 281 NOV 2020 14087A 142 STA 15+00 TO STA 18+25 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005) HH tduc tduc tduc tductductductduc HH btelbtelbtel btel HH tduc tduc tduc bsw-exbsw-extduc tduc tduc tduc HH #252 25-TA - remove HH #240-3 25-TA - remove HH #265-1 25-TA - remove remove cable tductductduc tduc tduc 50 pr. ug. - abandon 4 of 14To C.O.To Sheet 5To Sheet 3Place/provide 132' of 2-4" conduit - place/provide 160' of 2-4" conduit VACANT future path CL01 3048 Intercept Vault Place/provide 249' of 2-4" conduit- place/provide 175' of 2-4" conduit VACANT future path CL02 - 25-TA Intercept Vault CL03 25TA Handhole CenturyLink Civil Base Map RAINIER AVE S JOINT UTILITY TRENCH CITY OF RENTON PUBLIC WORK DEPT. - PROJECT No. 14087A RENTON, WA Cover Sheet 2 Legend 3-11 Joint Utility Trench Plan Civil Base Map Color Key: Existing FacilitiesConflict Mitigation Action (Proposed Facilities)Additional Information Needed/Notes Estimated % Design Drawings: 90% Jurisdiction File Name: 14087A RAINIER AVE PH4 90 PLANS.pdf Received file from Jurisdiction Date: 3/4/22 PROJECT LOCATION FOR REFERENCE ONLY NOTES: ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON INFORMATION PROVIDED BY OTHERS. CENTURYLINK CANNOT BE RESPONSIBLE FOR THE ACCURACY OF INFORMATION AND/OR PLANS PROVIDED BY OUTSIDE PARTIES. FACILITY LOCATIONS, DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIED PRIOR TO CONSTRUCTION. PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS ONLY AND SHOULD BE VERIFIED PRIOR TO CONSTRUCTION. INDEX OF SHEETS Plans Prepared For: Plans Prepared By: LOCATION MAP NOT TO SCALE N SHEET 1 of 14 DATE: 04-07-2022 REV. DATE DESCRIPTION 1 10-17-19 Initial TT Draft Issued 1 CTL JOB: N. GEO CODE: WC CLLI: Renton (RNTNWA01) ENGINEER: Jesse Patjens PHONE: 425-429-5722 EMAIL: jesse.patjens@centurylink.com CPA: Paul Butler PHONE: 206-652-5690 EMAIL: paul.butler@centurylink.comRainier Ave SSW Sunset Blvd NW 3rd Pl Airport Way S Tobin St S 3rd St 2 11-20-19 Added Existing Handhole Info 3 12-13-19 Added Info on 3rd St 4 04-07-22 Updated w/ 90% Plans TT Eng: Beth Tan Phone: 206-660-6330 E-mail: btan@terratechllc.net TT #: CL 18.7317 http://www.terratechllc.net 12-14 JUT Sections 5 04-08-22 Telecom design Legend X X XXX X X X X HH HH HHX X X XX XCP ) X Existing CenturyLink pedestalor or or New CenturyLink pedestal Existing CenturyLink pedestal to be removed Existing CenturyLink SAI (serving area interface) New CenturyLink SAI (serving area interface) Existing CenturyLink SAI to be removed or abandoned Existing CenturyLink cable or conduit to be removed or abandoned Existing CenturyLink handhole New CenturyLink handhole Existing CenturyLink handhole to be removed Existing CenturyLink manhole (various sizes) New CenturyLink manhole (various sizes) Existing CenturyLink double lidded manhole (various sizes) New CenturyLink double lidded manhole (various sizes) Existing CenturyLink manhole to be removed or abandoned (all sizes and types) Existing CenturyLink repeater New CenturyLink repeater Existing CenturyLink repeater to be removed CP Existing CenturyLink cool ped. - fiber/electronics New CenturyLink cool ped. - fiber/electronics Existing CenturyLink RT (remote terminal) New CenturyLink RT (remote terminal) Existing CenturyLink pole New CenturyLink pole Existing CenturyLink pole Existing CenturyLink down guy and anchor New CenturyLink down guy and anchor New CenturyLink sidewalk down guy and anchor Existing power company down guy and anchor X X CenturyLink Civil Base Map 2 of 14 btel Existing buried telephone line tduc Existing telephone duct run afo-exist Existing aerial fiber optic aer-tel Existing overhead telephone line fo-exist Existing buried fiber optic bsw-ex Existing buried service wire asw-ex Existing aerial service wire New overhead telephone line BTEL New buried telephone line TDUC New telephone duct run BSW-NEW New buried service wire AFO-NEW New aerial fiber optic AER-TEL FO-NEW New buried fiber optic ASW-NEW New aerial service wire Project Details Narrative/Special Remarks: This project proposes to relocate CenturyLink facilities along (insert project route) between (insert project extents) for the Construction of (insert Jurisdiction's Project Name and Number). The (insert Jurisdiction) will be protecting in place the following CenturyLink facilities within the project limits: • • • The CenturyLink relocation scope will include: • • • • Construction Sequencing Description Regarding CenturyLink RelocationScope and Jurisdiction Project Construction: CenturyLink's relocation scope is planned to occur prior to Jurisdiction's Construction Start Date. Temporary Facilities: There are no planned temporary facilities as part of CenturyLink's relocation scope. Existing buried splice New buried splice New leased pole Existing leased poleL L Abbreviations ct. Count pr. Pair pp Pending Placement ug. Underground Existing joint use pole New joint use pole New foreign owned (e.g. power) Existing foreign owned (e.g. power) J J Existing CenturyLink power pedestal New CenturyLink power pedestal P P Existing CenturyLink pole to be removed 1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW EXISTING FINISHED GRADE. 2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS. Notes All methods, materials, content and form contained in this material are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed, or displayed without the express written permission of Terra Technologies LLC. The technology presented in this material is protected under various U.S. and international patents and pending patent applications, including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934. Jesse Patjens 425-429-5722 jesse.patjens@centurylink.com RNTNWA01 CL18.7317E RAINIER AVE S SW SUNSET BLVDS 3RD STO'REILLY AUTO PARTSFIRESTONE SHELL 7-ELEVEN HERTZ/LYFT WALGREENS HE R T Z / L Y F T SA F E W A Y CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAJOINT UTILITY TRENCH PLAN STA 11+00 TO STA 15+00 141 14087A NOV 2020 281141 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF KPF KPF DPY STP(UL) -1615(005) H H HH HH #2-5 2'x3' - REMOVE Existing HH #926 264-TA tdu c t d u c tductductduc tductductdu c tduc t d u c tduc tduc tduc 1-4" duct 50 pr. ug. 72 ct. ug. fiber 2-4" duct 50 pr. ug. 72 ct. ug. fiber 3 of 14 (Se e S h e e t 1 1 )To C.O.To Sheet 4- place/provide 175' of 2-4" conduit VACANT future path RAINIER AVE S WALGREENS MIDAS SANSONINA HERTZ/LYFT WENDY'S TACO TIME SAFEWAY 25TACORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 142 281 NOV 2020 14087A 142 STA 15+00 TO STA 18+25 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005) HH tduc tduc tduc tductductductduc HH btelbtelbtel btel HH tduc tduc tduc bsw-exbsw-extduc tduc tduc tduc HH #252 25-TA - remove HH #240-3 25-TA - remove HH #265-1 25-TA - remove remove cable tductductduc tduc tduc 50 pr. ug. - abandon 4 of 14To C.O.To Sheet 5To Sheet 3Place/provide 132' of 2-4" conduit - place/provide 160' of 2-4" conduit VACANT future path CL01 3048 Intercept Vault Place/provide 249' of 2-4" conduit- place/provide 175' of 2-4" conduit VACANT future path CL02 - 25-TA Intercept Vault CL03 25TA Handhole RAINIER AVE S S 2ND STBIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS 25TACORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 143 281 NOV 2020 14087A 143 STA 18+25 TO STA 22+50 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005)tductductductductductductductductductductductductductductductductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH HH HHtductductductductduc tductductductductduc tduc tduc tductductductductductductductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tducfo-existtduc tduc tduc tduc HH tduc HH #253 25-TA - remove MH #197 HH #C205 25-TA - remove HH #258-1 48"x42" 1-4" duct - protect in place 1-4" duct - abandon tduc 2-4" ducts - abandon 5 of 14TDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUC- provide 315' of 2-4" conduit - pull in new 100pr UG (335') 529' 12-4" ducts 260' 1-4" duct CL10 25-TA CL04 467-TA TO C.O.To Sheet 4CL09 25-TA - place/provide 230' of 4-4" conduit see sheet 4 - place/provide 249' of 2-4" conduit To Sheet 6CL08 4484 TA Vault 225 Rainier Ave S (AA) 16-4" Lumen 4wrkg Harold Auto Body1wrkg 20-4" CenturyLink (BB)14-4" Lumen 260' 1-4" duct 243' 1-4" duct 529' 12-4" ducts 243' 1-4" duct 529' 12-4" ducts 106'-4"4484 TA vault SW VICTORIA STHAY E S PL S W RAINIER AVE S WATSON SECURITY WEST WIND MOTEL ROYAL ORCHID FORMULA 1 FAST LUBE TOMMY'S CAFE BROWN BEAR CAR WASH CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 144 281 NOV 2020 14087A 144 STA 22+50 TO STA 27+00 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005)6 of 14 HH HH #153 25-TA tduc tduc HH HH #258 25-TA - remove tduc tduc tduc tduc tduc tduc tduc MH #198 - remove tduc tductductduc tductductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tducHH HH #259 25-TA - remove 1-4" duct 50 pr. ug. 1-4" duct 50 pr. ug. 1-4" duct 50 pr. ug.btelbtel50 pr. buried tduc tductductducplace/provide 45' of 4-4" conduit place/provide 135' of 1-4" conduit CL12 4484 TA Vault CL13 3048 Handhole 1-4" CenturyLink *FROM VAULT AT STA 22+25 12-4" CenturyLink Ped #100 7"x11" - Remove ex. Pedestal, shift terminal - overset 3048 HH w/BMT w/4wrkg HHTo C.O.To Sheet 5To Sheet 74wrkg 529' 12-4" ducts 243' 1-4" duct - place/provide 135' of 1-4" conduit with approx. - place/provide 510' of 4-4" conduit with approx. - place/provide 510' of 4-4" conduit with 4484 TA Vault BROWN BEAR RAINIER AVE S S TOBIN STBROWN BEAR CAR WASH CHEVRON MCDONALD'S STARBUCKS CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT02.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAPLAN JOINT UTILITY TRENCH PLAN STA 27+00 TO STA 31+00 145 14087A NOV 2020 281145 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF KPF KPF DPY STP(UL) -1615(005) HH HH #1 tductductductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH tduc tduc HH HH fo-existfo-exist fo-exist btel btel btel tductductductducfo-existfo-exist1-4" duct 7 of 14tductductductductductduc btel btel btel btel New PSE Pole (PO2A) Install New Riser - place 300' of 4-4" conduit CL16 467-TA Manhole End of Phase 1 CL15 25-TA - place/provide 2-4" 90' CL14 25-TA - place/provide 510' of 4-4" conduit TDUCTDUCTDUC TDUCTDUCTDUCTDUCTDUCTDUCTDUC TDUC TDUC TDUC TDUC TDU C RFI - pathway changed due to city request RENTON AVENUE EXT RAINIER AVE N AIRPORT WAYBANNER BANK MCDONALD'S ARCO AM/PM RENTON LAUNDRY RAINIER AVE S CORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT02.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAPLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 146 281 NOV 2020 14087A 146 STA 31+00 TO STA 35+50 JOINT UTILITY TRENCH PLAN DPY KPF KPF STP(UL) -1615(005) HH tductductduc HH HH tduc tduc tduc tduc tduc tduc tduc td u c tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc b t e l b t e l b t e l b t e l btelbteltduc tduc tduc tduc tduc 8 of 14 CL18 467-TA Manhole CL17 BD 3 pedestal - place 300' of 4-4" conduit - place 318' of 3-4" conduit - place 110' 1-4" from CL 18 to N E L S O N P L N W RAINIER AVE N MATHEWSON'S AUTOMOTIVE PRECISION MOTORS CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT02.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAPLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 147 281 NOV 2020 14087A 147 STA 35+50 TO STA 39+00 JOINT UTILITY TRENCH PLAN DPY KPF KPF STP(UL) -1615(005) HH HH #247 28"x64" HHtductductductductductductductductductductduc tduc tduc tducbtelbtel 9 of 14 CL19 264-TA Intercept CL20 264-TA - place 318' of 3-4" conduit - place 150' of 3-4" conduit - place 371' of 3-4" conduit 25TA RAINIER AVE NNW 3RD PLVACANT GERBER COLLISION & GLASS ADVANCE AUTO TUNE N E L S O N P L N W CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES TRENCH SECTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT02.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADAPLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 148 281 NOV 2020 14087A 148 STA 39+00 TO STA 43+50 JOINT UTILITY TRENCH PLAN DPY KPF KPF STP(UL) -1615(005) HH tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH tduc tduc tducbte lbtelbtelbtel btelbtelbtel10 of 14 CL21 467-TA CL22 264-TA - place 371' of 3-4" conduit - place 162' of 3-4" conduit S 3RD ST HERTZ/LYFT SAFEWAY SHELL 7-ELEVEN SLEEPLESS COFFEE FREDDIE'S CASINO GENERAL DRAINAGE NOTES CONSTRUCTION NOTES LEGEND NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPLN03.dwg 90% REVIEW SUBMITTAL Public Works Department CITY OF RENTON R EGIST E R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 45211WILLIAM R . ED R ALI N3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 87 281 NOV 2020 14087A 87 STA 201+50 TO STA 205+00 DRAINAGE PLAN KDP KDP WRE STP(UL) -1615(005) HH tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH tduc 11 of 14(See Sheet 3)HH tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc