HomeMy WebLinkAboutMFP23005027.pdfNote: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
MFP23005027
265 RAINIER AVE S, RENTON, WA 98057
2/5/2024 2/8/2024 9am 4pm
Northsky Communications
Mike Smith
Trench 40' ROW and 5' sidewalk push. 15' ROW trench and 35' ROW driveway bore. 80' ROW
trench on 265 RAINIER AVE S, RENTON, WA 98057.
16701 SE McGillivray Blvd Vancouver 98683
23072816
425-615-7121
Holly Powers - CED 1/17/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Merilyn Luong
1/11/2024
SIGN STAND
TYPE III BARRICADE
TRAFFIC CONE/DELINEATOR
FLASHING ARROW BOARD
WORK AREA / CLOSURE
FLAGGER
Date:09/27/2023 Author:Brian Carnline WA TC Supervisor # 013104 Project:265 Rainier Ave S, Renton WA 98057Contractor:North Sky Communications Page:1 Quest Job :23072816
Comments:
Right Lane Closure
Cones to be used in all Tangents and Tapers
RAINIER AVE S
(1) All spacing may be adjusted to accommodate interchange ramps,
at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR AS
PER MUTCD)
MINIMUM TAPER LENGTH IN FEET (L)
LANE
WIDTH
(FEET)
POSTED SPEED LIMIT (MPH)
10
11
12
3025 35 40 45 50 55 60 65 70
105
115
180
205
225
320 540
495
450270
295
245
165
150
125
550
500
680
600 720 780 840
550
605
660
RAINIER AVE S
S 2 STD/W100'
TRENCH
BORE
ROAD
WORK
AHEAD
245'350'RIGHT LANECLOSEDAHEAD350'350'
350'ROADWORKAHEADROADWORKAHEADwww.invarion.com
Provide a signed traffic
control application with
the traffic control plans.
RAINIER AVE S
WALGREENS MIDAS SANSONINA
HERTZ/LYFT WENDY'S
TACO TIME
SAFEWAY 25TACORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
142 281
NOV 2020
14087A
142
STA 15+00 TO STA 18+25
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
HH tduc tduc tduc
tductductductduc HH
btelbtelbtel btel HH tduc tduc tduc
bsw-exbsw-extduc tduc tduc tduc
HH #252
25-TA
- remove
HH #240-3
25-TA
- remove
HH #265-1
25-TA
- remove
remove
cable
tductductduc
tduc
tduc
50 pr. ug.
- abandon
4
of 14To C.O.To Sheet 5To Sheet 3Place/provide 132'
of 2-4" conduit
- place/provide 160' of
2-4" conduit VACANT
future path
CL01
3048 Intercept Vault
Place/provide 249' of
2-4" conduit- place/provide 175' of
2-4" conduit VACANT
future path
CL02 - 25-TA
Intercept Vault
CL03
25TA Handhole
CenturyLink Civil Base Map
RAINIER AVE S JOINT UTILITY TRENCH
CITY OF RENTON PUBLIC WORK DEPT. - PROJECT No. 14087A
RENTON, WA
Cover Sheet
2 Legend
3-11 Joint Utility Trench Plan
Civil Base Map Color Key:
Existing FacilitiesConflict Mitigation Action (Proposed Facilities)Additional Information Needed/Notes
Estimated % Design Drawings: 90%
Jurisdiction File Name: 14087A RAINIER AVE PH4 90 PLANS.pdf
Received file from Jurisdiction Date: 3/4/22
PROJECT LOCATION
FOR REFERENCE ONLY
NOTES:
ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON INFORMATION
PROVIDED BY OTHERS. CENTURYLINK CANNOT BE RESPONSIBLE FOR THE
ACCURACY OF INFORMATION AND/OR PLANS PROVIDED BY OUTSIDE PARTIES.
FACILITY LOCATIONS, DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIED
PRIOR TO CONSTRUCTION.
PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS ONLY AND
SHOULD BE VERIFIED PRIOR TO CONSTRUCTION.
INDEX OF SHEETS
Plans Prepared For:
Plans Prepared By:
LOCATION MAP
NOT TO SCALE N
SHEET 1 of 14
DATE: 04-07-2022
REV. DATE DESCRIPTION
1 10-17-19 Initial TT Draft Issued
1
CTL JOB: N.
GEO CODE:
WC CLLI: Renton (RNTNWA01)
ENGINEER: Jesse Patjens
PHONE: 425-429-5722
EMAIL: jesse.patjens@centurylink.com
CPA: Paul Butler
PHONE: 206-652-5690
EMAIL: paul.butler@centurylink.comRainier Ave SSW Sunset Blvd
NW 3rd Pl
Airport Way
S Tobin St
S 3rd St
2 11-20-19 Added Existing Handhole Info
3 12-13-19 Added Info on 3rd St
4 04-07-22 Updated w/ 90% Plans
TT Eng: Beth Tan
Phone: 206-660-6330
E-mail: btan@terratechllc.net
TT #: CL 18.7317
http://www.terratechllc.net
12-14 JUT Sections
5 04-08-22 Telecom design
Legend
X
X XXX X
X X X
HH
HH
HHX
X
X
XX XCP
)
X
Existing CenturyLink pedestalor
or
or
New CenturyLink pedestal
Existing CenturyLink pedestal to be removed
Existing CenturyLink SAI (serving area interface)
New CenturyLink SAI (serving area interface)
Existing CenturyLink SAI to be removed or
abandoned
Existing CenturyLink cable or conduit to be
removed or abandoned
Existing CenturyLink handhole
New CenturyLink handhole
Existing CenturyLink handhole to be removed
Existing CenturyLink manhole (various sizes)
New CenturyLink manhole (various sizes)
Existing CenturyLink double lidded manhole
(various sizes)
New CenturyLink double lidded manhole
(various sizes)
Existing CenturyLink manhole to be removed
or abandoned (all sizes and types)
Existing CenturyLink repeater
New CenturyLink repeater
Existing CenturyLink repeater to be removed
CP
Existing CenturyLink cool ped. - fiber/electronics
New CenturyLink cool ped. - fiber/electronics
Existing CenturyLink RT (remote terminal)
New CenturyLink RT (remote terminal)
Existing CenturyLink pole
New CenturyLink pole
Existing CenturyLink pole
Existing CenturyLink down guy and anchor
New CenturyLink down guy and anchor
New CenturyLink sidewalk down guy and anchor
Existing power company down guy and anchor
X
X
CenturyLink Civil Base Map 2
of 14
btel Existing buried telephone line
tduc Existing telephone duct run
afo-exist Existing aerial fiber optic
aer-tel Existing overhead telephone line
fo-exist Existing buried fiber optic
bsw-ex Existing buried service wire
asw-ex Existing aerial service wire
New overhead telephone line
BTEL New buried telephone line
TDUC New telephone duct run
BSW-NEW New buried service wire
AFO-NEW New aerial fiber optic
AER-TEL
FO-NEW New buried fiber optic
ASW-NEW New aerial service wire
Project Details
Narrative/Special Remarks:
This project proposes to relocate CenturyLink facilities along (insert
project route) between (insert project extents) for the Construction of
(insert Jurisdiction's Project Name and Number).
The (insert Jurisdiction) will be protecting in place the following
CenturyLink facilities within the project limits:
•
•
•
The CenturyLink relocation scope will include:
•
•
•
•
Construction Sequencing Description Regarding CenturyLink RelocationScope and Jurisdiction Project Construction:
CenturyLink's relocation scope is planned to occur prior to Jurisdiction's
Construction Start Date.
Temporary Facilities:
There are no planned temporary facilities as part of CenturyLink's
relocation scope.
Existing buried splice
New buried splice
New leased pole
Existing leased poleL
L
Abbreviations
ct. Count
pr. Pair
pp Pending Placement
ug. Underground
Existing joint use pole
New joint use pole
New foreign owned (e.g. power)
Existing foreign owned (e.g. power)
J
J
Existing CenturyLink power pedestal
New CenturyLink power pedestal
P
P
Existing CenturyLink pole to be removed
1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS
NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS
SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW
EXISTING FINISHED GRADE.
2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED
AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE
DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS.
Notes All methods, materials, content and form contained in this
material are the intellectual property of Terra Technologies
LLC, and may not be copied, reproduced, distributed, or
displayed without the express written permission of
Terra Technologies LLC.
The technology presented in this material is protected under
various U.S. and international patents and pending patent
applications, including without limitation, U.S. Patent Nos.
7,771,140; 8,016,518; and 8,061,934.
Jesse Patjens
425-429-5722
jesse.patjens@centurylink.com
RNTNWA01
CL18.7317E
RAINIER AVE S SW SUNSET BLVDS 3RD STO'REILLY AUTO PARTSFIRESTONE
SHELL
7-ELEVEN
HERTZ/LYFT
WALGREENS
HE
R
T
Z
/
L
Y
F
T
SA
F
E
W
A
Y
CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAJOINT UTILITY TRENCH PLAN
STA 11+00 TO STA 15+00
141
14087A
NOV 2020
281141
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
KPF
KPF
DPY
STP(UL) -1615(005)
H
H
HH
HH #2-5
2'x3'
- REMOVE
Existing
HH #926
264-TA
tdu
c
t
d
u
c
tductductduc tductductdu
c
tduc
t
d
u
c
tduc
tduc
tduc
1-4" duct
50 pr. ug.
72 ct. ug. fiber
2-4" duct
50 pr. ug.
72 ct. ug. fiber
3
of 14
(Se
e
S
h
e
e
t
1
1
)To C.O.To Sheet 4- place/provide 175' of 2-4" conduit
VACANT future path
RAINIER AVE S
WALGREENS MIDAS SANSONINA
HERTZ/LYFT WENDY'S
TACO TIME
SAFEWAY 25TACORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
142 281
NOV 2020
14087A
142
STA 15+00 TO STA 18+25
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
HH tduc tduc tduc
tductductductduc HH
btelbtelbtel btel HH tduc tduc tduc
bsw-exbsw-extduc tduc tduc tduc
HH #252
25-TA
- remove
HH #240-3
25-TA
- remove
HH #265-1
25-TA
- remove
remove
cable
tductductduc
tduc
tduc
50 pr. ug.
- abandon
4
of 14To C.O.To Sheet 5To Sheet 3Place/provide 132'
of 2-4" conduit
- place/provide 160' of
2-4" conduit VACANT
future path
CL01
3048 Intercept Vault
Place/provide 249' of
2-4" conduit- place/provide 175' of
2-4" conduit VACANT
future path
CL02 - 25-TA
Intercept Vault
CL03
25TA Handhole
RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN
AUTOZONE
TACO TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
25TACORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
143 281
NOV 2020
14087A
143
STA 18+25 TO STA 22+50
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)tductductductductductductductductductductductductductductductductductduc
tduc tduc tduc tduc tduc tduc tduc tduc tduc HH
HH
HHtductductductductduc
tductductductductduc
tduc tduc
tductductductductductductductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc
tducfo-existtduc tduc tduc tduc
HH tduc
HH #253
25-TA
- remove
MH #197
HH #C205
25-TA
- remove
HH #258-1
48"x42"
1-4" duct
- protect in place
1-4" duct
- abandon
tduc
2-4" ducts
- abandon
5
of 14TDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUCTDUC- provide 315' of 2-4" conduit
- pull in new 100pr UG (335')
529' 12-4" ducts
260' 1-4" duct
CL10
25-TA
CL04
467-TA
TO C.O.To Sheet 4CL09
25-TA
- place/provide 230'
of 4-4" conduit
see sheet 4
- place/provide 249' of
2-4" conduit
To Sheet 6CL08
4484 TA Vault
225 Rainier
Ave S
(AA) 16-4" Lumen
4wrkg
Harold Auto
Body1wrkg
20-4" CenturyLink
(BB)14-4"
Lumen
260' 1-4" duct
243' 1-4" duct
529' 12-4" ducts
243' 1-4" duct
529' 12-4" ducts
106'-4"4484 TA vault
SW VICTORIA STHAY
E
S
PL
S
W
RAINIER AVE S
WATSON SECURITY
WEST WIND MOTEL ROYAL ORCHID
FORMULA 1 FAST LUBE TOMMY'S CAFE
BROWN
BEAR
CAR
WASH
CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
144 281
NOV 2020
14087A
144
STA 22+50 TO STA 27+00
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)6
of 14
HH
HH #153
25-TA
tduc tduc
HH
HH #258
25-TA
- remove
tduc tduc tduc tduc tduc tduc tduc
MH #198
- remove
tduc
tductductduc tductductductduc
tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc
tduc tduc tduc tduc tduc tduc tduc tducHH
HH #259
25-TA
- remove
1-4" duct
50 pr. ug.
1-4" duct
50 pr. ug.
1-4" duct
50 pr. ug.btelbtel50 pr. buried
tduc tductductducplace/provide 45' of 4-4" conduit
place/provide 135'
of 1-4" conduit
CL12
4484 TA Vault
CL13
3048 Handhole
1-4" CenturyLink
*FROM VAULT AT
STA 22+25
12-4" CenturyLink
Ped #100
7"x11"
- Remove ex. Pedestal,
shift terminal
- overset 3048
HH w/BMT w/4wrkg
HHTo C.O.To Sheet 5To Sheet 74wrkg
529' 12-4" ducts
243' 1-4" duct
- place/provide 135' of 1-4" conduit with approx.
- place/provide 510' of 4-4" conduit with approx.
- place/provide
510' of 4-4"
conduit with
4484 TA Vault
BROWN BEAR
RAINIER AVE S
S TOBIN STBROWN BEAR
CAR WASH
CHEVRON MCDONALD'S
STARBUCKS
CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT02.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAPLAN
JOINT UTILITY TRENCH PLAN
STA 27+00 TO STA 31+00
145
14087A
NOV 2020
281145
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
KPF
KPF
DPY
STP(UL) -1615(005)
HH
HH #1
tductductductductduc
tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH tduc tduc
HH
HH
fo-existfo-exist
fo-exist
btel
btel btel
tductductductducfo-existfo-exist1-4" duct
7
of 14tductductductductductduc
btel btel btel btel
New PSE Pole (PO2A)
Install New Riser
- place 300' of 4-4"
conduit
CL16
467-TA Manhole
End of Phase 1
CL15
25-TA
- place/provide
2-4" 90'
CL14
25-TA
- place/provide
510' of 4-4"
conduit
TDUCTDUCTDUC
TDUCTDUCTDUCTDUCTDUCTDUCTDUC TDUC TDUC TDUC TDUC
TDU
C
RFI - pathway
changed due to city
request
RENTON AVENUE
EXT
RAINIER AVE N
AIRPORT WAYBANNER BANK
MCDONALD'S
ARCO
AM/PM
RENTON LAUNDRY
RAINIER AVE S
CORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT02.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAPLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
146 281
NOV 2020
14087A
146
STA 31+00 TO STA 35+50
JOINT UTILITY TRENCH PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
HH
tductductduc
HH
HH
tduc tduc tduc tduc tduc
tduc
tduc
td
u
c
tduc
tduc
tduc
tduc
tduc
tduc
tduc
tduc
tduc tduc tduc tduc
b
t
e
l
b
t
e
l
b
t
e
l
b
t
e
l
btelbteltduc tduc tduc tduc tduc
8
of 14
CL18
467-TA Manhole
CL17
BD 3 pedestal
- place 300' of 4-4"
conduit
- place 318' of 3-4"
conduit
- place 110' 1-4"
from CL 18 to
N
E
L
S
O
N
P
L
N
W
RAINIER AVE N
MATHEWSON'S
AUTOMOTIVE PRECISION
MOTORS
CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT02.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAPLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
147 281
NOV 2020
14087A
147
STA 35+50 TO STA 39+00
JOINT UTILITY TRENCH PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
HH
HH #247
28"x64"
HHtductductductductductductductductductductduc tduc tduc tducbtelbtel
9
of 14
CL19
264-TA Intercept
CL20
264-TA
- place 318' of 3-4"
conduit
- place 150' of 3-4"
conduit - place 371' of 3-4"
conduit
25TA
RAINIER AVE NNW 3RD PLVACANT GERBER COLLISION
& GLASS
ADVANCE
AUTO TUNE
N
E
L
S
O
N
P
L
N
W
CORRESPONDING SHEETSFRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
TRENCH SECTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT02.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
R
EGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADAPLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
148 281
NOV 2020
14087A
148
STA 39+00 TO STA 43+50
JOINT UTILITY TRENCH PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
HH
tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH tduc tduc tducbte
lbtelbtelbtel btelbtelbtel10
of 14
CL21
467-TA
CL22
264-TA
- place 371' of 3-4"
conduit
- place 162' of 3-4"
conduit
S 3RD ST
HERTZ/LYFT SAFEWAY
SHELL
7-ELEVEN SLEEPLESS COFFEE FREDDIE'S CASINO
GENERAL DRAINAGE NOTES
CONSTRUCTION NOTES
LEGEND
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SDPLN03.dwg
90% REVIEW
SUBMITTAL
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
45211WILLIAM R . ED
R
ALI
N3131 Elliott Ave
Suite 400
Seattle, WA 98121
(206) 286-1640
2502 Jefferson Ave
Tacoma, WA 98402
(253) 627-0720
www.kpg.com
Interdisciplinary Design
PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
87 281
NOV 2020
14087A
87
STA 201+50 TO STA 205+00
DRAINAGE PLAN
KDP
KDP
WRE
STP(UL) -1615(005)
HH tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc
HH tduc
11
of 14(See Sheet 3)HH tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc