Loading...
HomeMy WebLinkAboutP_Site Plan_Thomas Residence Remodeling_240116MOUNTAIN VIEW AVENUE N3209 PROPERTY LINE UP 164' 125' 29'58'64'4'LAKE WASHINGTONSOLID BULKHEAD A 01 Site Plan & Cover Sheet Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code SITE PLAN SCALE 1'' = 10'- 0'' @ ARCH D01 N PROJECT DIRECTORY: ADDRESS: THOMAS RESIDENCE 3209 MOUNTAIN VIEW AVE N, RENTON, WA 98056 LEGAL DESCRIPTION: HILLMANS LK WN GARDEN OF EDEN #1 43 LESS N 10FT ALL 44 & 2ND CL SH LDS PARCEL NUMBER: 3342103810 LOT SIZE: 10,763 SQFT LOT FEATURES: DEAD END STREET, PAVED LAKE VIEW WATERFRONT FEATURES: BANK-LOW, SOLID BULKHEAD (CONCRETE W/ WOODEN DECK) LAKE FRONTAGE LENGTH: WATERFRONT 50 FT TOPOGRAPHY OF LAND: LEVEL TYPE OF MATERIAL: MUD PRESENT USE: TWO STORIES SINGLE FAMILY RESIDENCE W/ ATTACHED GARAGE GARAGE SPACES 2 COVERED SPACES 2 PROJECT DESCRIPTION: EXTERIOR & INTERIOR RENOVATION NO NEW STRUCTURES CONTRACTOR'S CONTACT INFORMATION: REMONT CONSTRUCTION 2265 116TH AVE NE, STE 210-4 BELLEVUE WA SHEET INDEX: A 01 Site Plan & Cover Sheet A 02 First Floor Plan - Existing A 03 Second Floor Plan - Existing A 04 Elevations - Existing A 05 First Floor Plan - Proposal A 06 Second Floor Plan - Proposal A 07 Elevations - Proposal D01 First Floor Plan - Demolitions D02 Second Floor Plan - Demolitions E 01 First Floor Plan - Electrical E 02 Second Floor Plan - Electrical KITCHEN 382 sq ft ENTRY 70 sq ft MAIN ENTRANCE POWDER BATH 27 sq ft LIVING / DINING 353 sq ft BATHROOM 1 55 sq ft OFFICE 145 sq ft STORAGE ROOM 78 sq ft GUEST BATH 20 sq ft UP UP DRIVEWAY11'-5"17'-612"8"19'-034"48'-812"10'-1114"8'-214"1'-112" 20'-314"28'-914"8"29'-514"5'-014"7'-712"6'-134"5'-834"6'-1114"11'-1012"5'-1034"8'-1014"4'-10"2'-934"2'-10"2'-1014"8'-8"3'-814"13'-2"4'-014" 4'-1"17'-912" 39'-812"8" 40'-412" 20'-112" 7'-712"4'-914"2'-234"6'-414"21'-1034"CL 8 sq ft GUEST ROOM 210 sq ft CL 6 sq ft CL 5 sq ft UP KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. A 02 First Floor Plan Existing Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FIRST FLOOR PLAN - EXISTING SCALE 1 4'' = 1'- 0'' @ ARCH D01 PRIMARY BEDROOM 298 sq ft PRIMARY BATH 157 sq ft GUEST BEDROOM 130 sq ft BATHROOM 2 48 sq ft DN PRIMARY CLOSET 131 sq ft LAUNDRY ROOM 63 sq ft GARAGE 176 sq ft PATIO PATIO 81 sq ft 10'-1012"7'-734"21'-214"8" 29'-6"12'-812"7'-1"5'-4"16'-014"734"41'-912"10'-034"9'-912"512" 20'-334"1'-812"20'-434"5'-914"13'-834"634" 20'-034"8'-1"10'-412"3'-1"4'-334"2'-1134"8'-212"6"9'-714"7'-714"4'-434"4'-134" 13'-534" 2'-734"3'-514"12'-134"7'-8"8'-6"8'-414"5'-012" 10'-734"7'-734"WIC 55 sq ft TOILET 12 sq ft CL 7 sq ft CL 9 sq ft HALL & STAIRS 132 sq ft GARAGE 114 sq ft 12'-012"CHARGING STATION FOR VACUUM DN KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. A 03 Second Floor Plan Existing Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code SECOND FLOOR PLAN - EXISTING SCALE 1 4'' = 1'- 0'' @ ARCH D01 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" A 04 Elevations - Existing Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FRONT ELEVATION - EAST SCALE 1 4'' = 1'- 0'' @ ARCH D01 REAR ELEVATION - WEST SCALE 1 4'' = 1'- 0'' @ ARCH D02 SIDE ELEVATION - SOUTH SCALE 1 4'' = 1'- 0'' @ ARCH D03 SIDE ELEVATION - NORTH SCALE 1 4'' = 1'- 0'' @ ARCH D04 BATHROOM SINKVERTICYLK-8189 BATHROOM SINKVERTICYLK-8189 TOILETSAN SOUCIK-5172 TOILETSAN SOUCIK-5172 K-8206CAIRNKITCHEN SINK KEEP (E) CHIMNEY BOX FOR (N) GAS FIREPLACE INSERT 1'-5"4'-1014"2'-914"±8'-0" (N) PICTURE WINDOW ±15'-9" (N) NANO SYSTEM 5'-11" (N) FULL HEIGHT WINDOW4"2'-312"9'-114"1"8"2'-414" 5'-0"412"6'-8"1'-2"1'-334"3'-412"±3'-734" (N) PIVOT DOOR UP KITCHEN 383 sq ft ENTRY 81 sq ft BATHROOM 1 49 sq ft POWDER BATH 30 sq ft MAIN ENTRANCE OFFICE 145 sq ft 3'-11"UP 13'-012" LIVING / DINING 353 sq ft GUEST BATH 20 sq ft STORAGE ROOM 78 sq ft GUEST ROOM 210 sq ft CL 6 sq ft UP KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. A 05 First Floor Plan Proposal Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FIRST FLOOR PLAN - PROPOSAL SCALE 1 4'' = 1'- 0'' @ ARCH D01 K-2882VERTICYLBATHROOM SINK K-2882VERTICYLBATHROOM SINK BATH FILLERCOMPOSEDK-T73087-4 BATHROOM SINK FAUCETCOMPOSEDK-73167-4 TOILETEIRK-77795 K-2882VERTICYLBATHROOM SINK BATHROOM SINK FAUCETCOMPOSEDK-73167-4 SMART GLASSCURBLESS SHOWER (N) RAILING TO MATCH W/ PRIMARY PATIO (N) SOFFIT, SEE ELEVATION SHEET A4.8 FOR DETAILS KEEP (E) SKYLIGHTS DN PRIMARY BEDROOM 284 sq ft PRIMARY BATH 182 sq ft BATHROOM 2 PRIMARY CLOSET 162 sq ft GARAGE 364 sq ft PATIO 158 sq ft 3'-6"13'-3"10'-10" WET AREA 412"412" 2'-934"8'-0"4'-934"5'-0"3'-212"2'-034"5'-0"334"812"3'-0"812"312"2'-6"5'-612"3'-0" 2'-7"1'-234"2'-712"2'-7"312"15'-634"(N)TALLWINDOW(N)TALLWINDOW1'-314"3'-012"1034"5'-012"1034"3'-012"4'-1012"20'-034"7'-1034"29'-512"PATIO 81 sq ft HALL & STAIRS 129 sq ft CL 9 sq ft CL 7 sq ft GUEST BEDROOM 130 sq ft TOILET 26 sq ft 10'-734"7'-734"DN KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. A 06 Second Floor Plan Proposal Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code SECOND FLOOR PLAN - PROPOSAL SCALE 1 4'' = 1'- 0'' @ ARCH D01 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" NEW PIVOT DOOR NEW DOOR TO REPLACE EXISTING 6'-8"00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" NEW NANO SYSTEM NEW FULL HEIGHT WINDOW 15'-9"5'-11"7'-0"4'-0"3'-0"NEW WINDOW NEW REPLACEMENT DOOR NEW WINDOW 5'-0"1'-8"5'-0"3'-4"3'-4"NEW WINDOW 6'-8"8'-0" 8'-112" 8'-0"6'-8"00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" EXISTING WINDOW TO BE REMOVED EXISTING WINDOW TO BE REMOVED 00 -0' - 11" 01 8' - 0 1/2" Level 3 15' - 3 1/2" 3'-012"3'-012"3'-4"3'-4"3'-4"3'-4"NEW WINDOW NEW WINDOW 5'-0" NEW WINDOW WINDOW NOTE: ALL NEW WINDOWS TO HAVE A U-VALUE OF U.30 OR LOWER A 07 Elevations - Proposed Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FRONT ELEVATION - EAST SCALE 1 4'' = 1'- 0'' @ ARCH D01 REAR ELEVATION - WEST SCALE 1 4'' = 1'- 0'' @ ARCH D02 SIDE ELEVATION - SOUTH SCALE 1 4'' = 1'- 0'' @ ARCH D03 SIDE ELEVATION - NORTH SCALE 1 4'' = 1'- 0'' @ ARCH D04 UP UP 2'-234" DEMO (E) GAS FIREPLACE DEMO ALL (E) MATERIAL COMPONENTS KEEP (E) CHIMNEY BOX FOR (N) GAS FIREPLACE INSERT DEMO (E) CASEWORK DEMO (E) KITCHEN REMOVE ALL (E) CABINETS, APPLIANCES, & PLUMBING FIXTURES DEMO WET BAR DEMO COAT CLOSET DEMO (E) WIINDOWS DEMO (E) WINDOWSDEMO (E) SLIDER DEMO (E) STAIRS DEMO (E) FENCE 1'-0"16'-214"4"8'-0"2'-914"8'-334"2'-512"10'-712"3'-1114"6'-9"2'-1034"2'-012"2'-312"8"2'-414"8" 2'-214" 3'-412"6'-112" KITCHEN 382 sq ft ENTRY 70 sq ft MAIN ENTRANCE POWDER BATH 27 sq ft LIVING / DINING 353 sq ft BATHROOM 1 55 sq ft OFFICE 145 sq ft STORAGE ROOM 78 sq ft GUEST BATH 20 sq ft DRIVEWAY CL 8 sq ft GUEST ROOM 210 sq ft CL 6 sq ft CL 5 sq ft UP KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. D 01 First Floor Plan Demolitions Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FIRST FLOOR - SCOPE OF DEMOLITIONS: ·REMOVE ALL (E) FLOOR MATERIAL @ MAIN FL ·DEMO (E) STAIRCASE ·DEMO ALL (E) BASEBOARDS & DOORS ·SAVE INTERIOR DOORS (TBD IF THEY WILL BE REUSED) ·REMOVE ALL (E) LIGHT FIXTURES @ MAIN FL ·DEMO (E) VANITY & (E) PLUMBING FIXTURES @ POWDER ROOM & BATHROOM 1 ·DEMO OR RELOCATE ANY (E) ELEC OUTLETS, SWITCHES, & ELEC.EQUIPMENTS @ AFFECTED AREA ·REPLACE ALL (E) WINDOWS W/ (N) BESIDES IN AFFECTED AREAS FIRST FLOOR - SCOPE OF DEMOLITION EXTERIOR: ·DEMO (E) FENCE & DOOR, PORTION TO BE REPLACED W/ (N) RAILING (MATCH W/ PRIMARY PATIO RAILING), TO BE DISCUSSED W/ GC & DESIGNER FIRST FLOOR PLAN - DEMOLITIONS SCALE 1 4'' = 1'- 0'' @ ARCH D01 DN DEMO (E) BATH REMOVE ALL (E) CABINETS, LIGHTING, & PLUMBING FIXTURES DEMO (E) BATH REMOVE ALL (E) CABINET, LIGHTING & PLUMBING FIXTURES DEMO ENTIRE LAUNDRY ROOM DEMO EXTERIOR HALF WALL DEMO (E) OFFICE CASEWORK DEMO ALL (E) CASEWORK RELOCATED (E)WATER HEATER, FURNACE, ETC. KEEP (E) SKYLIGHTS DEMO (E) FRIDGE DEMO (E) WINDOWS DEMO BATH DEMO (E) WINDOWS 6"10'-934"3'-7"13'-0"11"2'-134"5'-334"1'-4"8'-112"1'-7"3'-534"2'-234"2'-10"1'-412"2'-10"2'-1112"8'-612"2'-6"1'-414"3'-1112"5'-012"3'-1112"1'-314"3'-934"2'-712" 312"2'-214" 612"2'-7"3'-834"2'-7"2'-1114"1'-212" 3'-012"2'-1012"4'-3"2'-912"1'-1114"2'-1012"10'-734"7'-734"PRIMARY BEDROOM 298 sq ft PRIMARY BATH 157 sq ft GUEST BEDROOM 130 sq ft BATHROOM 2 48 sq ft PRIMARY CLOSET 131 sq ft LAUNDRY ROOM 63 sq ft GARAGE 176 sq ft PATIO 81 sq ft WIC 55 sq ft TOILET 12 sq ft CL 7 sq ft CL 9 sq ft HALL & STAIRS 132 sq ft GARAGE 114 sq ft CHARGING STATION FOR VACUUM PATIO 158 sq ft 10'-734"7'-734"DN KEY: EXISTING WALLS DEMOLITIONS NEW WALLS - 2X4 WD STUDS & 5/8" GWB EA SIDE, SOUND INSULATION IN (N) WALLS TYP, U.N.O. D 02 Second Floor Plan Demolitions Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code SECOND FLOOR PLAN - DEMOLITIONS SCALE 1 4'' = 1'- 0'' @ ARCH D01 SECOND FLOOR - SCOPE OF DEMOLITIONS: ·REMOVE ALL (E) FLOOR MATERIAL @ 2ND FL & STAIRCASE ·DEMO ALL (E) BASEBOARDS ·REPLACE ALL (E) WINDOWS W/ (N) BESIDES IN AFFECTED AREAS ·REMOVE ALL (E) LIGHT FIXTURES @ ALL BED ROOMS, ALL BATHROOMS, & STORAGE. ·DEMO ALL (E) CLOSET COMPONENTS @ PRIMARY BEDROOM ·REMOVE ALL (E) PLUMB FIXTURES ·DEMO OR RELOCATE ANY (E) ELEC OUTLETS, SWITCHES, & EQUIPMENTS @ AFFECTED AREA ·DEMO ALL (E) BATHROOM @ GARAGE ·REMOVE ALL (E) PLUMB FIXTURES @ GARAGE ·REMOVE ALL (E) WASHER & DRYER ·DEMO OR RELOCATE ANY (E) ELEC OUTLETS, SWITCHES, & EQUIPMENTS @ AFFECTED AREA ·RELOCATE (E) WATER HEATER & FURNACE, GC TO ADVISE ON NEW LOCATION IN GARAGE D3DDMD 33DD DDDLT-1A LT-1A LT-1B 3 LT-1A LT-1A LT-1A LT-1A LT-1A LT-2D LT-2DDLT-2 D DD D M LT-3 LT-4 LT-5 LT-6 LT-2 LT-6 BATHROOM SINKVERTICYLK-8189 BATHROOM SINKVERTICYLK-8189 TOILETSAN SOUCIK-5172 TOILETSAN SOUCIK-5172 K-8206CAIRNKITCHEN SINK UP±9'-114"(N) RAILING LENGTH TBDUP KITCHEN 383 sq ft ENTRY 81 sq ft BATHROOM 1 49 sq ft POWDER BATH 30 sq ft MAIN ENTRANCE OFFICE 145 sq ft LIVING / DINING 353 sq ft GUEST BATH 20 sq ft STORAGE ROOM 78 sq ft GUEST ROOM 210 sq ft CL 6 sq ft SA SA SA UPUP LT-XX (N) SMOKE & CO2 COMBINATION DETECTOR ALARM @ CLNGSACO2 NEW SA RECESSED LT PENDANT LT FLUSH MOUNT LT WALL SCONCE LOW VOL REC LT EXHAUST FAN SINGLE SWITCH ELEC OUTLET SMOKE ALARM LIGHT FIXTURE ELECTRICAL KEY: ELECTRICAL NOTES: ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT TYPE AND SIZE. ALL SMOKE DETECTORS TO BE ELECTRIC POWERED WITH BATTERY BACKUP AND WIRED TO SET ALL ALARMS OFF IF ONE IS TRIPPED. ALL KITCHEN OUTLETS TO BE GROUND FAULT CIRCUIT INTERRUPT EQUIPPED AND ON A SEPARATE CIRCUIT. ALL ELECTRICAL WORKS TO COMPLY WITH THE CURRENT NATIONAL ELECTRICAL CODE FOR AREAS WHERE EXTRA SWITCHES ARE TO BE REMOVED, DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH FOR AREAS WHERE CEILING RECESSED LIGHT FIXTURE ARE TO BE REMOVED / RELOCATED, DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH NOTES FIRST FLOOR: ·GC & DESIGNER TO DISCUSS LT-1B DETAIL PRIOR TO CONSTRUCTION ·LT-2 IN BREAKFAST CAB. TO BE AUTOMATIC NOTES SECOND FLOOR: ·MIRRORS IN PRIMARY BATH TO BE LED ·MIRROR IN GUEST BATHROOM 2 TO BE LED *EXHAUST HOOD: LOCAL EXHAUST SYSTEMS SHALL BE DESIGNED TO HAVE THE CAPACITY OF 100 CFM (INTERMITTENT) MINIMUM AIR FLOW RATE IN ACCORDANCE WITH IRC TABLE M1505.4.4(1) AS PER IRC M1503.6, IF THE EXHAUST HOOD IN THE KITCHEN HAS A CAPACITY IN EXCESS OF 400 CFM, IT MUST BE MECHANICALLY OR PASSIVELY PROVIDED WITH MAKEUP AIR AT A RATE OF APPROXIMATELY EQUAL TO THE EXHAUST AIR RATE. SUCH MAKEUP AIR SYSTEMS MUST BE EQUIPPED WITH NOT LESS THAN ONE DAMPER COMPLYING WITH SECTION M1503.6.2. EACH DAMPER SHALL BE A GRAVITY DAMPER OR AN ELECTRICALLY OPERATED DAMPER THAT AUTOMATICALLY OPENS WHEN THE EXHAUST SYSTEM OPERATES. ELECTRICAL EXHAUST HOOD D M DIMMER SWITCH 3 3 WAY SWITCH MOTION SENSOR FAN 3 WAY SWITCH WITH DIMMER CONTROL3 D LED LIGHT E 01 First Floor Plan Electrical Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code FIRST FLOOR PLAN - ELECTRICAL SCALE 1 4'' = 1'- 0'' @ ARCH D01 D D 3 D 3 D DDMMM DM D D LT-1A LT-2 LT-1ALT-1A LT-1A LT-1A LT-1A LT-1A LT-1B LT-9 D LT-1C K-2882VERTICYLBATHROOM SINK K-2882VERTICYLBATHROOM SINK BATH FILLERCOMPOSEDK-T73087-4 BATHROOM SINK FAUCETCOMPOSEDK-73167-4 TOILETEIRK-77795 K-2882VERTICYLBATHROOM SINK BATHROOM SINK FAUCETCOMPOSEDK-73167-4 DN PRIMARY BEDROOM 284 sq ft PRIMARY BATH 182 sq ft BATHROOM 2 PRIMARY CLOSET 162 sq ft GARAGE 364 sq ft PATIO 158 sq ft PATIO 81 sq ft HALL & STAIRS 129 sq ft CL 9 sq ft CL 7 sq ft GUEST BEDROOM 130 sq ft TOILET 26 sq ft SA SA DN LT-XX (N) SMOKE & CO2 COMBINATION DETECTOR ALARM @ CLNGSACO2 NEW SA RECESSED LT PENDANT LT FLUSH MOUNT LT WALL SCONCE LOW VOL REC LT EXHAUST FAN SINGLE SWITCH ELEC OUTLET SMOKE ALARM LIGHT FIXTURE ELECTRICAL KEY: ELECTRICAL NOTES: ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT TYPE AND SIZE. ALL SMOKE DETECTORS TO BE ELECTRIC POWERED WITH BATTERY BACKUP AND WIRED TO SET ALL ALARMS OFF IF ONE IS TRIPPED. ALL KITCHEN OUTLETS TO BE GROUND FAULT CIRCUIT INTERRUPT EQUIPPED AND ON A SEPARATE CIRCUIT. ALL ELECTRICAL WORKS TO COMPLY WITH THE CURRENT NATIONAL ELECTRICAL CODE FOR AREAS WHERE EXTRA SWITCHES ARE TO BE REMOVED, DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH FOR AREAS WHERE CEILING RECESSED LIGHT FIXTURE ARE TO BE REMOVED / RELOCATED, DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH NOTES FIRST FLOOR: ·GC & DESIGNER TO DISCUSS LT-1B DETAIL PRIOR TO CONSTRUCTION ·LT-2 IN BREAKFAST CAB. TO BE AUTOMATIC NOTES SECOND FLOOR: ·MIRRORS IN PRIMARY BATH TO BE LED ·MIRROR IN GUEST BATHROOM 2 TO BE LED *EXHAUST HOOD: LOCAL EXHAUST SYSTEMS SHALL BE DESIGNED TO HAVE THE CAPACITY OF 100 CFM (INTERMITTENT) MINIMUM AIR FLOW RATE IN ACCORDANCE WITH IRC TABLE M1505.4.4(1) AS PER IRC M1503.6, IF THE EXHAUST HOOD IN THE KITCHEN HAS A CAPACITY IN EXCESS OF 400 CFM, IT MUST BE MECHANICALLY OR PASSIVELY PROVIDED WITH MAKEUP AIR AT A RATE OF APPROXIMATELY EQUAL TO THE EXHAUST AIR RATE. SUCH MAKEUP AIR SYSTEMS MUST BE EQUIPPED WITH NOT LESS THAN ONE DAMPER COMPLYING WITH SECTION M1503.6.2. EACH DAMPER SHALL BE A GRAVITY DAMPER OR AN ELECTRICALLY OPERATED DAMPER THAT AUTOMATICALLY OPENS WHEN THE EXHAUST SYSTEM OPERATES. ELECTRICAL EXHAUST HOOD D M DIMMER SWITCH 3 3 WAY SWITCH MOTION SENSOR FAN 3 WAY SWITCH WITH DIMMER CONTROL3 D LED LIGHT E 02 Second Floor Plan Electrical Scale Project number Date Drawn by Checked by Thomas Residence 3209 Mountain View Ave N, Renton, WA 98056 No.Description Date Drawing no First Issue 12.14.2023 As noted @ ARCH D 2265 116th Ave NE, Ste 210-4 Bellevue WA RC - 211 December 2023 Viktor Turchik Denys Vasylyshyn General Notes: All works to be done by licensed & insured contractors and subcontractors. All local codes and regulation shall be followed. All dimensions to be checked on site prior to commencement of works. Adequate bracing and shoring to be provided as necessary until permanent support and stiffeners are installed. All plans comply with: State Building Code (SBC) 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 National Fuel Gas Code 2018 International Fire Code 2018 Uniform Plumbing Code 2018 Washington State Energy Code SECOND FLOOR PLAN - ELECTRICAL SCALE 1 4'' = 1'- 0'' @ ARCH D01