HomeMy WebLinkAboutP_Site Plan_Thomas Residence Remodeling_240116MOUNTAIN VIEW AVENUE N3209
PROPERTY LINE
UP
164'
125'
29'58'64'4'LAKE WASHINGTONSOLID BULKHEAD
A 01
Site Plan & Cover Sheet
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
SITE PLAN
SCALE 1'' = 10'- 0'' @ ARCH D01
N
PROJECT DIRECTORY:
ADDRESS:
THOMAS RESIDENCE
3209 MOUNTAIN VIEW AVE N,
RENTON, WA 98056
LEGAL DESCRIPTION:
HILLMANS LK WN GARDEN OF EDEN #1 43
LESS N 10FT ALL 44 & 2ND CL SH LDS
PARCEL NUMBER:
3342103810
LOT SIZE:
10,763 SQFT
LOT FEATURES:
DEAD END STREET, PAVED
LAKE VIEW
WATERFRONT FEATURES:
BANK-LOW, SOLID BULKHEAD (CONCRETE W/
WOODEN DECK)
LAKE FRONTAGE LENGTH:
WATERFRONT 50 FT
TOPOGRAPHY OF LAND:
LEVEL
TYPE OF MATERIAL:
MUD
PRESENT USE:
TWO STORIES
SINGLE FAMILY RESIDENCE
W/ ATTACHED GARAGE
GARAGE SPACES 2
COVERED SPACES 2
PROJECT DESCRIPTION:
EXTERIOR & INTERIOR
RENOVATION
NO NEW STRUCTURES
CONTRACTOR'S CONTACT INFORMATION:
REMONT CONSTRUCTION
2265 116TH AVE NE, STE 210-4
BELLEVUE WA
SHEET INDEX:
A 01 Site Plan & Cover Sheet
A 02 First Floor Plan - Existing
A 03 Second Floor Plan - Existing
A 04 Elevations - Existing
A 05 First Floor Plan - Proposal
A 06 Second Floor Plan - Proposal
A 07 Elevations - Proposal
D01 First Floor Plan - Demolitions
D02 Second Floor Plan - Demolitions
E 01 First Floor Plan - Electrical
E 02 Second Floor Plan - Electrical
KITCHEN
382 sq ft
ENTRY
70 sq ft
MAIN ENTRANCE
POWDER
BATH
27 sq ft
LIVING / DINING
353 sq ft
BATHROOM 1
55 sq ft
OFFICE
145 sq ft
STORAGE ROOM
78 sq ft
GUEST BATH
20 sq ft
UP
UP
DRIVEWAY11'-5"17'-612"8"19'-034"48'-812"10'-1114"8'-214"1'-112"
20'-314"28'-914"8"29'-514"5'-014"7'-712"6'-134"5'-834"6'-1114"11'-1012"5'-1034"8'-1014"4'-10"2'-934"2'-10"2'-1014"8'-8"3'-814"13'-2"4'-014"
4'-1"17'-912"
39'-812"8"
40'-412"
20'-112"
7'-712"4'-914"2'-234"6'-414"21'-1034"CL
8 sq ft
GUEST ROOM
210 sq ft
CL
6 sq ft
CL
5 sq ft
UP
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
A 02
First Floor Plan
Existing
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FIRST FLOOR PLAN - EXISTING
SCALE 1
4'' = 1'- 0'' @ ARCH D01
PRIMARY BEDROOM
298 sq ft
PRIMARY BATH
157 sq ft
GUEST BEDROOM
130 sq ft
BATHROOM 2
48 sq ft
DN
PRIMARY CLOSET
131 sq ft
LAUNDRY ROOM
63 sq ft
GARAGE
176 sq ft
PATIO
PATIO
81 sq ft
10'-1012"7'-734"21'-214"8"
29'-6"12'-812"7'-1"5'-4"16'-014"734"41'-912"10'-034"9'-912"512"
20'-334"1'-812"20'-434"5'-914"13'-834"634"
20'-034"8'-1"10'-412"3'-1"4'-334"2'-1134"8'-212"6"9'-714"7'-714"4'-434"4'-134"
13'-534"
2'-734"3'-514"12'-134"7'-8"8'-6"8'-414"5'-012"
10'-734"7'-734"WIC
55 sq ft
TOILET
12 sq ft
CL
7 sq ft
CL
9 sq ft
HALL & STAIRS
132 sq ft
GARAGE
114 sq ft
12'-012"CHARGING STATION
FOR VACUUM
DN
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
A 03
Second Floor Plan
Existing
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
SECOND FLOOR PLAN - EXISTING
SCALE 1
4'' = 1'- 0'' @ ARCH D01
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
A 04
Elevations - Existing
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FRONT ELEVATION - EAST
SCALE 1
4'' = 1'- 0'' @ ARCH D01
REAR ELEVATION - WEST
SCALE 1
4'' = 1'- 0'' @ ARCH D02
SIDE ELEVATION - SOUTH
SCALE 1
4'' = 1'- 0'' @ ARCH D03
SIDE ELEVATION - NORTH
SCALE 1
4'' = 1'- 0'' @ ARCH D04
BATHROOM SINKVERTICYLK-8189
BATHROOM SINKVERTICYLK-8189
TOILETSAN SOUCIK-5172
TOILETSAN SOUCIK-5172
K-8206CAIRNKITCHEN SINK
KEEP (E) CHIMNEY BOX FOR
(N) GAS FIREPLACE INSERT
1'-5"4'-1014"2'-914"±8'-0"
(N) PICTURE WINDOW
±15'-9"
(N) NANO SYSTEM
5'-11"
(N) FULL HEIGHT WINDOW4"2'-312"9'-114"1"8"2'-414"
5'-0"412"6'-8"1'-2"1'-334"3'-412"±3'-734"
(N) PIVOT DOOR
UP
KITCHEN
383 sq ft
ENTRY
81 sq ft
BATHROOM 1
49 sq ft
POWDER
BATH
30 sq ft
MAIN ENTRANCE
OFFICE
145 sq ft 3'-11"UP
13'-012"
LIVING / DINING
353 sq ft
GUEST BATH
20 sq ft
STORAGE ROOM
78 sq ft
GUEST ROOM
210 sq ft
CL
6 sq ft
UP
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
A 05
First Floor Plan
Proposal
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FIRST FLOOR PLAN - PROPOSAL
SCALE 1
4'' = 1'- 0'' @ ARCH D01
K-2882VERTICYLBATHROOM SINK
K-2882VERTICYLBATHROOM SINK
BATH FILLERCOMPOSEDK-T73087-4
BATHROOM SINK FAUCETCOMPOSEDK-73167-4
TOILETEIRK-77795
K-2882VERTICYLBATHROOM SINK
BATHROOM SINK FAUCETCOMPOSEDK-73167-4
SMART GLASSCURBLESS SHOWER
(N) RAILING TO MATCH
W/ PRIMARY PATIO
(N) SOFFIT, SEE ELEVATION
SHEET A4.8 FOR DETAILS
KEEP (E) SKYLIGHTS
DN
PRIMARY BEDROOM
284 sq ft
PRIMARY BATH
182 sq ft
BATHROOM 2
PRIMARY CLOSET
162 sq ft
GARAGE
364 sq ft
PATIO
158 sq ft
3'-6"13'-3"10'-10"
WET AREA
412"412"
2'-934"8'-0"4'-934"5'-0"3'-212"2'-034"5'-0"334"812"3'-0"812"312"2'-6"5'-612"3'-0"
2'-7"1'-234"2'-712"2'-7"312"15'-634"(N)TALLWINDOW(N)TALLWINDOW1'-314"3'-012"1034"5'-012"1034"3'-012"4'-1012"20'-034"7'-1034"29'-512"PATIO
81 sq ft
HALL & STAIRS
129 sq ft
CL
9 sq ft
CL
7 sq ft
GUEST BEDROOM
130 sq ft
TOILET
26 sq ft
10'-734"7'-734"DN
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
A 06
Second Floor Plan
Proposal
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
SECOND FLOOR PLAN - PROPOSAL
SCALE 1
4'' = 1'- 0'' @ ARCH D01
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
NEW PIVOT
DOOR
NEW DOOR TO
REPLACE EXISTING
6'-8"00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
NEW NANO
SYSTEM
NEW FULL
HEIGHT
WINDOW
15'-9"5'-11"7'-0"4'-0"3'-0"NEW
WINDOW
NEW REPLACEMENT DOOR
NEW
WINDOW
5'-0"1'-8"5'-0"3'-4"3'-4"NEW WINDOW 6'-8"8'-0"
8'-112"
8'-0"6'-8"00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
EXISTING WINDOW
TO BE REMOVED
EXISTING WINDOW
TO BE REMOVED
00
-0' - 11"
01
8' - 0 1/2"
Level 3
15' - 3 1/2"
3'-012"3'-012"3'-4"3'-4"3'-4"3'-4"NEW
WINDOW
NEW WINDOW
5'-0"
NEW
WINDOW
WINDOW NOTE:
ALL NEW WINDOWS TO HAVE A
U-VALUE OF U.30 OR LOWER
A 07
Elevations - Proposed
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FRONT ELEVATION - EAST
SCALE 1
4'' = 1'- 0'' @ ARCH D01
REAR ELEVATION - WEST
SCALE 1
4'' = 1'- 0'' @ ARCH D02
SIDE ELEVATION - SOUTH
SCALE 1
4'' = 1'- 0'' @ ARCH D03
SIDE ELEVATION - NORTH
SCALE 1
4'' = 1'- 0'' @ ARCH D04
UP
UP
2'-234"
DEMO (E) GAS FIREPLACE
DEMO ALL (E)
MATERIAL COMPONENTS
KEEP (E) CHIMNEY BOX FOR
(N) GAS FIREPLACE INSERT
DEMO (E)
CASEWORK
DEMO (E) KITCHEN
REMOVE ALL (E) CABINETS,
APPLIANCES, &
PLUMBING FIXTURES
DEMO WET BAR
DEMO COAT CLOSET
DEMO (E)
WIINDOWS
DEMO (E) WINDOWSDEMO (E) SLIDER
DEMO (E) STAIRS
DEMO (E)
FENCE
1'-0"16'-214"4"8'-0"2'-914"8'-334"2'-512"10'-712"3'-1114"6'-9"2'-1034"2'-012"2'-312"8"2'-414"8"
2'-214"
3'-412"6'-112"
KITCHEN
382 sq ft
ENTRY
70 sq ft
MAIN ENTRANCE
POWDER
BATH
27 sq ft
LIVING / DINING
353 sq ft
BATHROOM 1
55 sq ft
OFFICE
145 sq ft
STORAGE ROOM
78 sq ft
GUEST BATH
20 sq ft
DRIVEWAY
CL
8 sq ft
GUEST ROOM
210 sq ft
CL
6 sq ft
CL
5 sq ft
UP
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
D 01
First Floor Plan
Demolitions
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FIRST FLOOR - SCOPE OF DEMOLITIONS:
·REMOVE ALL (E) FLOOR MATERIAL @ MAIN FL
·DEMO (E) STAIRCASE
·DEMO ALL (E) BASEBOARDS & DOORS
·SAVE INTERIOR DOORS (TBD IF THEY WILL BE
REUSED)
·REMOVE ALL (E) LIGHT FIXTURES @ MAIN FL
·DEMO (E) VANITY & (E) PLUMBING FIXTURES @
POWDER ROOM & BATHROOM 1
·DEMO OR RELOCATE ANY (E) ELEC OUTLETS,
SWITCHES, & ELEC.EQUIPMENTS @ AFFECTED
AREA
·REPLACE ALL (E) WINDOWS W/ (N) BESIDES IN
AFFECTED AREAS
FIRST FLOOR - SCOPE OF DEMOLITION EXTERIOR:
·DEMO (E) FENCE & DOOR, PORTION TO BE
REPLACED W/ (N) RAILING (MATCH W/ PRIMARY
PATIO RAILING), TO BE DISCUSSED W/ GC &
DESIGNER
FIRST FLOOR PLAN - DEMOLITIONS
SCALE 1
4'' = 1'- 0'' @ ARCH D01
DN
DEMO (E) BATH
REMOVE ALL (E)
CABINETS, LIGHTING,
& PLUMBING FIXTURES
DEMO (E) BATH
REMOVE ALL (E) CABINET,
LIGHTING & PLUMBING FIXTURES
DEMO ENTIRE
LAUNDRY ROOM
DEMO EXTERIOR
HALF WALL
DEMO (E) OFFICE
CASEWORK
DEMO ALL
(E) CASEWORK
RELOCATED
(E)WATER HEATER,
FURNACE, ETC.
KEEP (E) SKYLIGHTS
DEMO (E) FRIDGE
DEMO (E) WINDOWS
DEMO BATH
DEMO (E) WINDOWS
6"10'-934"3'-7"13'-0"11"2'-134"5'-334"1'-4"8'-112"1'-7"3'-534"2'-234"2'-10"1'-412"2'-10"2'-1112"8'-612"2'-6"1'-414"3'-1112"5'-012"3'-1112"1'-314"3'-934"2'-712"
312"2'-214"
612"2'-7"3'-834"2'-7"2'-1114"1'-212"
3'-012"2'-1012"4'-3"2'-912"1'-1114"2'-1012"10'-734"7'-734"PRIMARY BEDROOM
298 sq ft
PRIMARY BATH
157 sq ft
GUEST BEDROOM
130 sq ft
BATHROOM 2
48 sq ft
PRIMARY CLOSET
131 sq ft
LAUNDRY ROOM
63 sq ft
GARAGE
176 sq ft
PATIO
81 sq ft
WIC
55 sq ft
TOILET
12 sq ft
CL
7 sq ft
CL
9 sq ft
HALL & STAIRS
132 sq ft
GARAGE
114 sq ft
CHARGING STATION
FOR VACUUM
PATIO
158 sq ft
10'-734"7'-734"DN
KEY:
EXISTING WALLS
DEMOLITIONS
NEW WALLS - 2X4 WD STUDS & 5/8"
GWB EA SIDE, SOUND INSULATION IN
(N) WALLS TYP, U.N.O.
D 02
Second Floor Plan
Demolitions
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
SECOND FLOOR PLAN - DEMOLITIONS
SCALE 1
4'' = 1'- 0'' @ ARCH D01
SECOND FLOOR - SCOPE OF DEMOLITIONS:
·REMOVE ALL (E) FLOOR MATERIAL @ 2ND FL &
STAIRCASE
·DEMO ALL (E) BASEBOARDS
·REPLACE ALL (E) WINDOWS W/ (N) BESIDES IN
AFFECTED AREAS
·REMOVE ALL (E) LIGHT FIXTURES @ ALL BED
ROOMS, ALL BATHROOMS, & STORAGE.
·DEMO ALL (E) CLOSET COMPONENTS @
PRIMARY BEDROOM
·REMOVE ALL (E) PLUMB FIXTURES
·DEMO OR RELOCATE ANY (E) ELEC OUTLETS,
SWITCHES, & EQUIPMENTS @ AFFECTED AREA
·DEMO ALL (E) BATHROOM @ GARAGE
·REMOVE ALL (E) PLUMB FIXTURES @ GARAGE
·REMOVE ALL (E) WASHER & DRYER
·DEMO OR RELOCATE ANY (E) ELEC OUTLETS,
SWITCHES, & EQUIPMENTS @ AFFECTED AREA
·RELOCATE (E) WATER HEATER & FURNACE, GC
TO ADVISE ON NEW LOCATION IN GARAGE
D3DDMD
33DD
DDDLT-1A
LT-1A
LT-1B
3
LT-1A
LT-1A
LT-1A
LT-1A LT-1A
LT-2D
LT-2DDLT-2
D
DD D M
LT-3
LT-4
LT-5
LT-6
LT-2
LT-6
BATHROOM SINKVERTICYLK-8189
BATHROOM SINKVERTICYLK-8189
TOILETSAN SOUCIK-5172
TOILETSAN SOUCIK-5172
K-8206CAIRNKITCHEN SINK
UP±9'-114"(N) RAILING LENGTH TBDUP
KITCHEN
383 sq ft
ENTRY
81 sq ft
BATHROOM 1
49 sq ft
POWDER
BATH
30 sq ft
MAIN ENTRANCE
OFFICE
145 sq ft
LIVING / DINING
353 sq ft
GUEST BATH
20 sq ft
STORAGE ROOM
78 sq ft
GUEST ROOM
210 sq ft
CL
6 sq ft
SA
SA
SA
UPUP
LT-XX
(N) SMOKE & CO2 COMBINATION
DETECTOR ALARM @ CLNGSACO2
NEW
SA
RECESSED LT
PENDANT LT
FLUSH MOUNT LT
WALL SCONCE
LOW VOL REC LT
EXHAUST FAN
SINGLE SWITCH
ELEC OUTLET
SMOKE ALARM
LIGHT FIXTURE
ELECTRICAL KEY:
ELECTRICAL NOTES:
ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT TYPE AND
SIZE.
ALL SMOKE DETECTORS TO BE ELECTRIC POWERED WITH
BATTERY BACKUP AND WIRED TO SET ALL ALARMS OFF IF ONE IS
TRIPPED.
ALL KITCHEN OUTLETS TO BE GROUND FAULT CIRCUIT
INTERRUPT EQUIPPED AND ON A SEPARATE CIRCUIT.
ALL ELECTRICAL WORKS TO COMPLY WITH
THE CURRENT NATIONAL ELECTRICAL CODE
FOR AREAS WHERE EXTRA SWITCHES ARE TO BE REMOVED,
DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH
FOR AREAS WHERE CEILING RECESSED LIGHT FIXTURE ARE TO
BE REMOVED / RELOCATED, DRYWALL, PATCH, SKIM AND SAND
FOR CONSISTENT FINISH
NOTES FIRST FLOOR:
·GC & DESIGNER TO DISCUSS LT-1B DETAIL PRIOR TO
CONSTRUCTION
·LT-2 IN BREAKFAST CAB. TO BE AUTOMATIC
NOTES SECOND FLOOR:
·MIRRORS IN PRIMARY BATH TO BE LED
·MIRROR IN GUEST BATHROOM 2 TO BE LED
*EXHAUST HOOD:
LOCAL EXHAUST SYSTEMS SHALL BE DESIGNED TO HAVE THE
CAPACITY OF
100 CFM (INTERMITTENT) MINIMUM AIR FLOW RATE IN
ACCORDANCE WITH IRC TABLE M1505.4.4(1)
AS PER IRC M1503.6, IF THE EXHAUST HOOD IN THE KITCHEN HAS
A CAPACITY IN EXCESS OF 400 CFM, IT MUST BE MECHANICALLY
OR PASSIVELY PROVIDED WITH MAKEUP AIR AT A RATE OF
APPROXIMATELY EQUAL TO THE EXHAUST AIR RATE.
SUCH MAKEUP AIR SYSTEMS MUST BE EQUIPPED WITH NOT
LESS THAN ONE DAMPER COMPLYING WITH SECTION M1503.6.2.
EACH DAMPER SHALL BE A GRAVITY DAMPER OR AN
ELECTRICALLY OPERATED DAMPER THAT AUTOMATICALLY
OPENS WHEN THE EXHAUST SYSTEM OPERATES.
ELECTRICAL EXHAUST HOOD
D
M
DIMMER SWITCH
3 3 WAY SWITCH
MOTION SENSOR FAN
3 WAY SWITCH WITH DIMMER CONTROL3
D
LED LIGHT
E 01
First Floor Plan
Electrical
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
FIRST FLOOR PLAN - ELECTRICAL
SCALE 1
4'' = 1'- 0'' @ ARCH D01
D
D
3
D
3
D DDMMM
DM
D
D
LT-1A
LT-2
LT-1ALT-1A
LT-1A
LT-1A
LT-1A
LT-1A
LT-1B
LT-9
D
LT-1C
K-2882VERTICYLBATHROOM SINK
K-2882VERTICYLBATHROOM SINK
BATH FILLERCOMPOSEDK-T73087-4
BATHROOM SINK FAUCETCOMPOSEDK-73167-4
TOILETEIRK-77795
K-2882VERTICYLBATHROOM SINK
BATHROOM SINK FAUCETCOMPOSEDK-73167-4
DN
PRIMARY BEDROOM
284 sq ft
PRIMARY BATH
182 sq ft
BATHROOM 2
PRIMARY CLOSET
162 sq ft
GARAGE
364 sq ft
PATIO
158 sq ft
PATIO
81 sq ft
HALL & STAIRS
129 sq ft
CL
9 sq ft
CL
7 sq ft
GUEST BEDROOM
130 sq ft
TOILET
26 sq ft
SA
SA
DN
LT-XX
(N) SMOKE & CO2 COMBINATION
DETECTOR ALARM @ CLNGSACO2
NEW
SA
RECESSED LT
PENDANT LT
FLUSH MOUNT LT
WALL SCONCE
LOW VOL REC LT
EXHAUST FAN
SINGLE SWITCH
ELEC OUTLET
SMOKE ALARM
LIGHT FIXTURE
ELECTRICAL KEY:
ELECTRICAL NOTES:
ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT TYPE AND
SIZE.
ALL SMOKE DETECTORS TO BE ELECTRIC POWERED WITH
BATTERY BACKUP AND WIRED TO SET ALL ALARMS OFF IF ONE IS
TRIPPED.
ALL KITCHEN OUTLETS TO BE GROUND FAULT CIRCUIT
INTERRUPT EQUIPPED AND ON A SEPARATE CIRCUIT.
ALL ELECTRICAL WORKS TO COMPLY WITH
THE CURRENT NATIONAL ELECTRICAL CODE
FOR AREAS WHERE EXTRA SWITCHES ARE TO BE REMOVED,
DRYWALL, PATCH, SKIM AND SAND FOR CONSISTENT FINISH
FOR AREAS WHERE CEILING RECESSED LIGHT FIXTURE ARE TO
BE REMOVED / RELOCATED, DRYWALL, PATCH, SKIM AND SAND
FOR CONSISTENT FINISH
NOTES FIRST FLOOR:
·GC & DESIGNER TO DISCUSS LT-1B DETAIL PRIOR TO
CONSTRUCTION
·LT-2 IN BREAKFAST CAB. TO BE AUTOMATIC
NOTES SECOND FLOOR:
·MIRRORS IN PRIMARY BATH TO BE LED
·MIRROR IN GUEST BATHROOM 2 TO BE LED
*EXHAUST HOOD:
LOCAL EXHAUST SYSTEMS SHALL BE DESIGNED TO HAVE THE
CAPACITY OF
100 CFM (INTERMITTENT) MINIMUM AIR FLOW RATE IN
ACCORDANCE WITH IRC TABLE M1505.4.4(1)
AS PER IRC M1503.6, IF THE EXHAUST HOOD IN THE KITCHEN HAS
A CAPACITY IN EXCESS OF 400 CFM, IT MUST BE MECHANICALLY
OR PASSIVELY PROVIDED WITH MAKEUP AIR AT A RATE OF
APPROXIMATELY EQUAL TO THE EXHAUST AIR RATE.
SUCH MAKEUP AIR SYSTEMS MUST BE EQUIPPED WITH NOT
LESS THAN ONE DAMPER COMPLYING WITH SECTION M1503.6.2.
EACH DAMPER SHALL BE A GRAVITY DAMPER OR AN
ELECTRICALLY OPERATED DAMPER THAT AUTOMATICALLY
OPENS WHEN THE EXHAUST SYSTEM OPERATES.
ELECTRICAL EXHAUST HOOD
D
M
DIMMER SWITCH
3 3 WAY SWITCH
MOTION SENSOR FAN
3 WAY SWITCH WITH DIMMER CONTROL3
D
LED LIGHT
E 02
Second Floor Plan
Electrical
Scale
Project number
Date
Drawn by
Checked by
Thomas Residence
3209 Mountain View Ave N,
Renton, WA 98056
No.Description Date
Drawing no
First Issue 12.14.2023
As noted @ ARCH D
2265 116th Ave NE, Ste 210-4
Bellevue WA
RC - 211
December 2023
Viktor Turchik
Denys Vasylyshyn
General Notes:
All works to be done by licensed & insured
contractors and subcontractors.
All local codes and regulation shall be
followed.
All dimensions to be checked on site prior to
commencement of works.
Adequate bracing and shoring to be
provided as necessary until permanent
support and stiffeners are installed.
All plans comply with:
State Building Code (SBC)
2018 International Building Code
2018 International Residential Code
2018 International Mechanical Code
2018 National Fuel Gas Code
2018 International Fire Code
2018 Uniform Plumbing Code
2018 Washington State Energy Code
SECOND FLOOR PLAN - ELECTRICAL
SCALE 1
4'' = 1'- 0'' @ ARCH D01