HomeMy WebLinkAboutAdden 35 C. 06-097 , Adden #35-08 Fiber Optic Project Agreement 35 Hillcrest Special Services Center 1800 Index Ave NE, Renton, WA Kenneydale Elementary School 1700 NE 28th St. Renton, WA Highlands Elementary School 2720 NE 7th St. Renton, WA Connection of the Above Sites to KEC via City of Renton City Hall An Addendum to the General Terms and Conditions for Sharing of Fiber Optic Installation Projects Interlocal Agreement 1 Table of Contents I. Project Description.................................................................................................. 3 A. Project Number 35 ............................................................................................... 3 B. Project Name Hillcrest Special Service Center, Kenneydale Elementary School and Highlands Elementary School connection to KEC via Renton City Hall..... 3 C. Project Description............................................................................................... 3 D. Lead Agency/Project Manager........................................................................... 3 E. Participating Agencies......................................................................................... 3 11. Physical Description of Project............................................................................... 3 A. Project Route........................................................................................................ 3 B. Points of Demarcation..........................................................................................4 C. Facilities to be Used, Owners and Managers....................................................... 4 D. Project Specifications and Scope of Work........................................................... 5 E. Fiber Apportionment............................................................................................ 7 III. Project Budget......................................................................................................... 8 A. Construction Budget ............................................................................................ 8 B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves................................................................................... 8 IV. Apportionment of Liability..................................................................................... 9 V. Project Schedule...................................................................................................... 9 VI Changes or Addenda to General Terms and Conditions....................................... 10 2 �„✓ 1. Project Description A. Project Number 35 B. Project Name Hillcrest Special Service Center, Kenneydale Elementary School and Highlands Elementary School connection to KEC via Renton City Hall C. Project Description Provide fiber optic network connections from Hillcrest Special Services Center (HSSC), Kenneydale Elementary School (KES) and Highlands Elementary School (HiES) to existing City of Renton fiber through Renton City Hall (RCH) to Kohlwes Education Center(KEC). Install a 6 count single mode (SM) fiber cable from Hillcrest Special Services Center MDF to an aerial splice on the McKnight Middle School fiber. Install a 24 count single mode fiber cable from Kenneydale Elementary School MDF to the North Highlands Neighborhood Center MDF. Install a 12 count fiber from the Highlands Elementary School MDF to an aerial splice near Harrington Ave. NE and NE 9th St. Three pole risers with attached underground conduit will be installed to access two newly installed aerial conduit segments connecting city conduit to the above locations. D. Lead Agency / Project Manager Renton School District/ Steve Lewey E. Participating Agencies Renton School District, City of Renton. ll. Physical Description of Project A. Project Route Segment A: HSSC From the HSSC MDF through about 300' of existing entrance conduit to a PSE pole on the south side of Harrington Ave NE, 60' north across Harrington Ave. NE to the NE corner of Harrington Circle NE and Harrington Ave. NE, southwest about 165' along the north side of Harington Ave. NE to the NW corner of Harrington Ave. NE and Index Ave. NE, south about 550' along the west side of Index Ave. NE to the SW corner of Index Ave. NE and NE 16th St. to an existing aerial conduit. An aerial splice at this location will complete the pathway to the NHNC. 3 Segment B: KES From the KES MDF through about 250'of existing building entrance conduit, through about 160' of new 2" PVC conduit in a new bore under NE 28th St. to the north most PSE pole on the west side of Jones Ave. NE, up a new riser then south along the west side of Jones Ave. NE in new aerial conduit about 2,500' to a pole on the SW corner of Jones Ave NE and NE 16th St., easterly across both Jones Ave. NE and NE 16th St. to the north side of NE 16th street, continuing east about 2,600' to the PSE pole just west of the NW corner of NE 16th St. and Edmonds Ave. NE, down a new pole riser then east about 150' in new 2" PVC conduit to the existing type 1 hand hole on the NW corner of NE 16th St. and Edmonds Ave. NE, through existing street lighting conduit about 50' to the east side of Edmonds Ave NE, then south along the east side of Edmonds Ave. NE about 60 feet to the type 1 hand hole on the offset NE corner of NE 16th St. and Edmonds Ave. NE, east on the north side of NE 16th St. about 110' to the existing type 1 hand hole adjacent to a PSE pole, up a new riser and east about 800' on NE 16th St. to an existing aerial conduit, east crossing diagonally to the south then north side of NE 16th St. to the existing riser that connects through about 165' of existing building entrance conduit to the NHNC MDFP. Important Note: The existing street lighting conduit segment in the vicinity of Edmonds Ave. NE and NE 16th St. contains street lighting conductors that are always energized with 220 volts. Use appropriate caution. The Edmonds Ave. NE crossing conduit is partially blocked with mud and must be cleaned prior to installation of fiber. Segment C: HiES From the building MDF about 250'through existing entrance conduit to a PSE pole on the SW corner of NE 8th St and Harrington Ave. NE, up the pole on a new riser to a new aerial conduit, north along the west side of Harrington Ave. NE about 1,000' to a PSE pole where 12 count SM fiber from the old Fire Station 12 is coiled. B. Points of Demarcation Hillcrest Special Service Center MDF Kenneydale Elementary School MDF Highlands Elementary School MDF North Highlands Neighborhood Center MDF City of Renton City Hall P2 telephone room C. Facilities to be Used, Owners and Managers City of Renton conduit systems Renton School District conduit system New aerial conduit system installed by Renton School District on Puget Sound Energy poles 4 +%0✓ -Vale D. Project Specifications and Scope of Work This project shall meet all the requirements of the City of Renton Public Works Department, i.e. traffic control plans, street use permits, waiver of existing underground ordinance, Renton Business License, etc. Route Preparation • Work to be done during normal working hours: Segment A: HSSC 1. Inventory the 7 PSE poles on the route from the PSE pole on the south side of Harrington Ave NE to the SW corner of Index Ave. NE and NE 16th St., obtain the required permits and permissions, make-ready any existing strands, provide and install a new aerial cable strand with required support equipment according to PSE specifications and provide and lash a 1" aerial conduit to the strand. Segment B: KES 1. Provide and install about 160' of 2" schedule 80 PVC conduit in a new horizontal bore running form the existing building entrance conduit under NE 28th St to the north most PSE pole on the west side of Jones Ave. NE. Sweep the conduit into a pole riser ending not less than 25' above the ground. Bed the underground conduit not in the bore in 6" of rock free fill and backfill the trench and bore pits. Restore all adjacent landscaping to the condition that existed prior to the start of work. Replace damaged grass with live turf. 2. Inventory the 46 PSE poles on the route from NE 28th St. and Jones Ave. NE south to NE 16th St., east to Edmonds Ave. NE and on NE 16th St. NE east of Edmonds Ave. NE, obtain the required permits and permissions, make-ready any existing strands, provide and install a new aerial cable strand with required support equipment according to PSE specifications and provide and lash a 1" aerial conduit to the strand. 3. Provide and install about 150' of 2" schedule 80 PVC conduit in a 36" deep trench from the existing type 1 street lighting hand hole located on the NW corner of NE 16th St. and Edmonds Ave. NE, east to the PSE pole. Sweep the conduit into a pole riser ending not less than 25' above the ground. Bed the underground conduit in 6" of rock free fill and backfill the trench. Locate the trench such that it will be under any future sidewalk. This trench cuts across two approximately 16' wide asphalt driveways serving 1609 Edmonds Ave. NE. Make the necessary arrangements with the owner to schedule and or sequence the trenching to minimize disruption. Patch and restore the asphalt and restore the adjacent landscaping to its original condition. Patch any grass with live turf. 4. Clean and prepare as required the existing 2" PVC conduit crossing Edmonds Ave. NE at NE 16th St. 5. Provide and install about 5' of 2" schedule 80 PVC conduit in a 36" deep trench from the existing type 1 street lighting hand hole located about 110' east of Edmonds Ave. NE and NE 16th St. to the adjacent PSE pole. Sweep the conduit into a pole riser ending not less than 25' above the ground. Bed the 5 underground conduit in 6" of rock free fill and backfill the trench. Restore the adjacent landscaping to its original condition. Patch any grass with live turf. Segment C: HiES 1. Inventory the 7 PSE poles on the route from NE 8th St. and Harrington Ave. NE north on the west side of Harrington Ave. NE to the first pole north of NE 91h St. and Harrington Ave. NE. adjacent to the old Renton Fire Station 12, obtain the required permits and permissions, make-ready any existing strands, provide and install a new aerial cable strand with required support equipment according to PSE specifications and provide and lash a 1" aerial conduit to the strand. Underground and Aerial Fiber Placement • Work to be done during normal working hours: Segment A: HSSC 1. Reel bare fiber test and provide test results of the customer-provided 12 count single mode (SM) fiber cable. 2. Install the 12 count SM fiber cable from the HSSC MDF through the building entrance conduit, through the pole riser and through the aerial conduit route to SW corner of Index Ave. NE and NE 16th St. Provide a 50' service loop in the MDF. 3. Attach a label to the 12 count SM fiber cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". 4. Provide and install toneable mule tape along fiber cable in the underground. Segment B: KES 1. Install a 24 count SM fiber cable from the KES MDF through the existing building entrance conduit, through the conduit crossing NE 281h St., up the riser and through the aerial route south on NE Jones Ave. to NE 16th St. and east to Edmonds Ave. NE, descend the pole riser and continue through the new conduit, into the existing street lighting conduit under Edmonds Ave. NE, then south to NE 16th St. and east to and up the pole riser, then continue east to the existing aerial conduit serving McKnight Middle School, continue through the existing conduit pathway into the NHNC MDF. Provide a 50' service loop in each MDF. 2. Attach a label to the 24 count SM fiber cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". Segment C: HiES 1. Install a 12 count SM fiber cable from the NW corner of NE 9th St. and Harrington Ave. NE. through the overhead pathway to the HiES MDF. Provide a 50' service loop in the MDF. 6 2. Attach a label to the 12 count SM fiber cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". 3. Provide and install toneable mule tape along fiber cable in the underground. Fiber Terminations and Splicing • Work to be done during normal working hours: 1. Provide and install a 12 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the HSSC MDF. Terminate fibers 1 - 12 to the panel. Provide and install LC connector type bulkheads in the enclosure. 2. Provide and install a 12 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the KEC MDF. Terminate fibers 1 - 12 to the panel. Provide and install LC connector type bulkheads in the enclosure. 3. Provide and install a 12 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the HIES MDF. Terminate fibers 1 - 12 to the panel. Provide and install LC connector type bulkheads in the enclosure. 4. Provide and install a 24 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the NHNC MDF. Terminate fibers 1 - 24 to the panel. Provide and install SC-APC connector type bulkheads in the enclosure. 5. At the splice point on the PSE pole on the NW corner of Index Ave. NE and NE 16th St., provide and install an aerial splice enclosure of sufficient size to splice 12 fibers. 6. Splice fibers 7 - 12 of the 12 count SM fiber running to McKnight Middle School to fibers 7 - 12 of the 12 count HSSC SM fiber to provide a complete connection from HSSC to NHNC. 7. At the splice point on the PSE pole north of the NW corner of Harrington Ave. NE and NE 12th St., provide and install an aerial splice enclosure of sufficient size to splice 12 fibers. 8. Splice fibers 1 - 6 of the 12 count SM fiber running to from HiES to fibers 1 - 6 of the existing 12 count SM fiber that previously served old Renton Fire Station 12 to provide a complete connection from HIES to Renton City Hall. 9. Perform bidirectional, end to end OTDR tests on the 36 terminated fibers at both 1590 nm and 1310 nm and provide the test documents to Renton School District and the City of Renton. E. Fiber Apportionment Three single mode fiber optic cables will be installed. 1. The 12 count SM fiber cable to HSSC shall be for the exclusive use of the Renton School District. 2. Fibers 1 - 12 of the 24 count SM fiber cable to KES shall be owned and maintained by the Renton School District. 3. Fibers 13 - 24 of the 24 count SM fiber cable to KES shall be owned and maintained by the City of Renton. 7 4. The 12 count SM fiber cable to HiES shall be for the exclusive use of Renton School District. Ill. Project Budget A. Construction Budget In consideration for the City of Renton allowing Renton School District fiber to occupy certain portions of the City's conduit system for the useful life of the fiber, Renton School District agrees to pay for most costs such as but not limited to: fiber optic cable, conduit upgrades if required, splice enclosures, fiber patch panels, miscellaneous parts and supplies and labor to install, test and certify the fiber system. All upgrades to the conduit system on city property and in the city right of way will be owned and maintained by the City of Renton. Conduit on Renton School District property will be owned and maintained by the District. At such time as the School District shall determine that utilizing the fiber optic cable is no longer in its interest, the District shall transfer ownership of the fiber to the City of Renton or remove the fiber from the city's conduit system, leaving the conduits in original condition. B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves. Expected future maintenance has been broken down into the following categories. If a maintenance issue arises that is not listed below, those costs shall be borne by the Renton School District. Locates The Renton School District agrees to pay for all locates required and requested through the Underground Utilities Locate Center(UULC) that is on Renton School District property. The City of Renton agrees to perform all locates required and requested through Underground Utilities Locate Center(UULC) for the fiber and conduit installed as a result of this agreement that is on property owned by the City of Renton and in the City of Renton right-of-way. Relocation Any and all relocations on Puget Sound Energy poles serving HSSC, HiES or KES will be borne by the Renton School District. Any and all relocations on Renton School District property will be borne by the Renton School District. Any and all relocations on City of Renton property will be borne by the City of Renton. Repairs/Breaks The Renton School District, acting as the Lead Agency, shall contract with a competent and qualified vendor to provide 7x24x365, four hour response to any fiber breaks/outages that happen on the HSSC 12 count SM fiber, the KES 24 count SM fiber and the HiES 12 8 *00 count fiber. This service level agreement will require an annual premium, estimated to be $3,000.00, to ensure services are available when needed. IV. Apportionment of Liability During construction, the Contractor shall be responsible for the project work and the project site. In the event that the project work causes or contributes to any harm, damage, injury or loss to any person or property, whether during construction or after completion of the project, each party shall be responsible to the extent the party is found to be at fault. The Renton School District shall ensure that District and all persons performing the Work, including without limitation District's suppliers and subcontractors, maintain in effect at all times during the Work, coverage or insurance in accordance with the applicable laws relating to worker's compensation and employer's liability insurance (including, but not limited to, the Washington Industrial Insurance Act and the laws of the state in which any such person was hired), regardless of whether such coverage or insurance is mandatory or merely elective under the law. District shall furnish to Participating Agencies such assurance and evidence of such coverage or insurance (such as copies of insurance policies and Certificates of Compliance issued by the Washington State Department of Labor and Industries) as Participating Agencies may request. The Renton School District shall maintain in full force and effect throughout the term of this Agreement, a minimum of One Million Dollars ($1,000,000) liability insurance for property damage and bodily injury. The City of Renton shall be named as a primary and non-contributory additional insured on the property damage and bodily injury policies. In satisfying the insurance requirements set forth in this section, the District may self- insure against such risks in such amounts as are consistent with good utility practice or shall obtain a coverage agreement through a Risk Pool authorized by Chapter 39.24 RCW which shall provide liability coverage to the District for the liabilities contractually assumed by the District in this Agreement. At the time of execution of this Agreement, and prior to commencement of performance of any of the Work, District shall furnish Participating Agencies upon request with Certificates of Insurance and any applicable endorsement pages as evidence that policies providing insurance (or self-insurance) with such provisions, coverage's and limits are in full force and effect. V. Project Schedule Task Target Completion Date Fiber installation from HSSC to splice Completed Fiber installation from HiES to splice Completed Pathway for KES completed 8/8/2008 Fiber installation for KES 8/22/2008 Splicing and fiber testing 8/29/2008 Final Project Acceptance 9/3/2008 9 NW-01 VI Changes or Addenda to General Terms and Conditions This Agreement shall run concurrent with the Interlocal Agreement General Terms and Conditions document. This document supersedes the Interlocal Agreement General Terms and Conditions document to the extent it contains terms and conditions which change, modify, delete, add to, supplement or otherwise amend the terms and conditions of the Interlocal Agreement General Terms and Conditions document. Approvals IN WITNESS WHEREOF, the parties hereto have executed this Fiber Optic Project Agreement on the respective dates indicated below. i Denis Law Date Mayor, Attest : City of Renton Bonnie I . Walton, City Clerk � -- 3-Pi � Bill ulten Date Chief Technology Officer Renton School District 403 10