Loading...
HomeMy WebLinkAboutAdden 33 'AG-06-097 , Adden #33-08 Fiber Optic Project Agreement 33 Hazen High School 1101 Hoquiam Ave. NE Renton, WA Renton School District - Kohlwes Education Center 300 SW 7th St Renton, WA Install Fiber Between These Sites An Addendum to the General Terms and Conditions for Sharing of Fiber Optic Installation Projects Interlocal Agreement 1 -..+' Table of Contents I. Project Description.................................................................................................. 3 A. Project Number 33 ............................................................................................. 3 B. Project Name Kohlwes Education Center fiber backbone extension to Hazen HighSchool.......................................................................................................... 3 C. Project Description............................................................................................... 3 D. Lead Agency/Project Manager............................................................................. 3 E. Participating Agencies......................................................................................... 3 II. Physical Description of Project............................................................................... 3 A. Project Route........................................................................................................ 3 B. Points of Demarcation.......................................................................................... 4 C. Facilities to be Used, Owners and Managers....................................................... 4 D. Project Specifications and Scope of Work...........................................................4 E. Fiber Apportionment............................................................................................ 8 III. Project Budget......................................................................................................... 8 A. Construction Budget ............................................................................................ 8 B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves................................................................................... 9 IV. Apportionment of Liability..................................................................................... 9 V. Project Schedule.................................................................................................... 10 VI Changes or Addenda to General Terms and Conditions....................................... 10 2 * we 11%� L Project Description A. Project Number 33 B. Project Name Kohlwes Education Center fiber backbone extension to Hazen High School C. Project Description Extend the Kohlwes Education Center(KEC) backbone fiber from the splice vault at S Grady Way and Wells Ave. S to the Hazen High School (HHS) MDF through existing City of Renton conduit and new aerial conduit, providing vaults for fiber storage and future backbone splices. Install a 288 count SM fiber cable and a 24 count SM fiber cable between S Grady Way and Wells Ave. S and N 1St St. and Wells Ave N. Install a 72 count SM fiber cable and a 96 count SM fiber cable between N 1St St. and Wells Ave N and NE Sunset Blvd. and Duvall Ave. NE. Install a 36 count SM fiber cable between NE Sunset Blvd. and Duvall Ave. NE and Hazen High School. Install a splice vault at each of four locations: the SW corner of S 3rd St. and Wells Ave. S, the NW corner of N 1St St. and Wells Ave. N, north side of N 3rd St. just east of the I-405 overpass, adjacent to the crosswalk near Honeydew Elementary School. Two pole risers with attached underground conduit will be installed to access a newly installed aerial conduit segment connecting city conduit to Hazen High School and a connection to the MDF through new inner duct will be installed. D. Lead Agency/Project Manager Renton School District/Steve Lewey E. Participating Agencies Renton School District, City of Renton. ll. Physical Description of Project A. Project Route Segment A From the vault located on the NW corner of S Grady Way and Wells Ave. S the pathway proceeds north on the west side of Wells Ave. S in existing City of Renton 2" PVC conduit about 3,600' to the NW corner of N 1St St. and Wells Ave. N. 3 `.✓ `✓sole Segment B The route continues north on the west side of Wells Ave. S in existing City of Renton 2" PVC conduit about 800' to the SW corner of Wells Ave. N and N 3rd St. then turns east on the south side of N 3rd St. about 2,250' to the SE corner of N 3rd St. and Sunset Blvd. N, the pathway continues about 450' through a deep bore diagonally across the intersection and under the I-405 overpass to the north side of NE. 3rd St.just east of 1-405, where it continues on the north side of NE 3rd St. about 7,750' to the NW corner of NE 3rd St. and Union Ave. NE, turning north on the west side of Union Ave. NE about 600' before crossing to the east side of Union Ave. NE. and proceeding north about 5,000' to the NE corner of Union Ave. NE and NE Sunset Blvd., it proceeds east on the north side of NE Sunset Blvd. about 2,250' to a recently installed vault on the NE corner of NE Sunset Blvd. and Duvall Ave. NE. Segment C The final segment continues east on NE Sunset Blvd. in existing conduit about 900' to a point just east of Field Ave. NE where an existing type 1 hand hole is located near a PSE pole, the route runs about 50' through a new underground conduit to a riser on the PSE pole to an aerial segment which continues about 375' to the NE corner of NE Sunset Blvd. and Hoquiam Ave. NE, where it truns south on the east side of Hoquiam Ave. NE about 1,250' on existing PSE poles then crosses Hoquiam Ave. NE to an existing PSE pole about 75' NE of the NE corner of Hazen High School, continuing through newly installed conduit into the building and ends in the building MDF which will be connected to the new entrance by about 650' of inner duct. B. Points of Demarcation An existing vault on the NW corner of S Grady Way and Wells Ave. S A new vault on the NW corner of Wells Ave. N and N 1St St. An existing vault on the NE corner of NE Sunset Blvd. and Duvall Ave. NE. Hazen High School MDF C. Facilities to be Used, Owners and Managers City of Renton conduit systems New aerial conduit system installed by Renton School District on Puget Sound Energy poles New underground conduit installed by Renton School District D. Project Specifications and Scope of Work This project shall meet all the requirements of the City of Renton Public Works Department, i.e. traffic control plans, street use permits, waiver of existing underground ordinance, Renton Business License, etc. 4 Route Preparation • Work to be done during normal working hours: Segment A 1. Provide and install a 25-TA vault on the SW corner of S 3rd St. and Wells Ave. S,just SE of the existing type 3 intersection hand hole adjacent to the curb. Provide and install a 3" schedule 80 PVC conduit interconnecting the vault to the adjacent existing type 3 intersection signal control hand hole. 2. Provide and install 25-TA a vault at the NW corner of N 1 st St. and Wells Ave. N. in the grass area just north of the existing PSE pole. Intercept the existing two 2" PVC conduits. Provide and install 2" schedule 80 PVC conduit sweeps and extend the conduits into vault. Provide and install a 2" schedule 80 PVC conduit sweeping to the adjacent PSE pole for a future pole riser. Provide and install a 2" schedule 80 PVC conduit connecting to the adjacent type 2 street lighting conduit hand hole. 3. Provide the vaults with non-skid lids with welded raised lettering that reads: "LT/ITS". Replace sidewalk panels with 3,000 PSI concrete and finish to city specifications. 4. Restore adjacent landscaping to the condition that existed prior to the start of work. Segment B 1. Provide and install a 25-TA vault adjacent to the conduit path on the north side of N 3rd St.just east of the 1-405 overpass. Provide and install 2" schedule 80 PVC conduit sweeps and extend the conduits into vault. 2. Provide and install 25-TA a vault adjacent to the crosswalk near Honeydew Elementary School. Provide and install a 2" schedule 80 PVC conduit connection to the adjacent type 1 hand hole containing the existing two 2" city conduits. Provide and install a 2" schedule 80 PVC conduit to the adjacent type 1 crosswalk hand hole. 3. Provide the vaults with non-skid lids with welded raised lettering that reads: "LT/ITS". Replace sidewalk panels with 3,000 PSI concrete and finish to city specifications. 4. Restore adjacent landscaping to the condition that existed prior to the start of work. Segment C 1. From the existing PSE pole adjacent to the existing type 1 hand hole about 150' east of Field Ave. NE and NE Sunset Blvd, provide and install a 2" schedule 80 PVC conduit in a 36" deep trench approximately 20` to the adjacent type 1 hand hole containing the two 2" city conduit. Sweep the conduit into a pole riser ending not less than 25' above the ground. Bed the underground conduit in 6" of rock free fill and backfill the trench. Restore all adjacent landscaping to the condition that existed prior to the start of work. Replace damaged grass with live turf. 2. Inventory the 12 PSE poles on the route from Field Ave. NE and NE Sunset Blvd. east to Hoquiam Ave. NE and south on Hoquiam Ave. NE to Hazen 5 ,WWI' N"0000 High School, obtain the required permits and permissions, make-ready any existing strands,provide and install a new aerial cable strand with required support equipment according to PSE specifications and provide and lash a 1" aerial conduit to the strand. 3. Provide and install a pole riser on the first PSE pole east of Hoquiam Ave. NE just north of the Hazen property. 4. Provide and install a 2" schedule 80 PVC conduit in a 36" deep trench through about 25' of asphalt and about 50' of grass and landscaping, to the north side of the Hazen High School. Patch the asphalt as needed to restore the original surface. 5. Provide and install a new building entrance conduit and enclosure and provide and install approximately 650' of 3/4" inner duct to the building MDF. Restore adjacent landscaping to the condition that existed prior to the start of work. Underground and Aerial Fiber Placement • Work to be done during normal working hours: Segment A 1. Reel bare fiber test and provide test results of the customer provided 24 and 288 count SM fiber cables. 2. Install the 288 and 24 count SM fiber cables from the existing vault located on the NW corner of S Grady Way and Wells Ave. S along the west side of Wells Ave. S in existing City of Renton 2" PVC conduit about 3,600' to the NW corner of N 1 st St. and Wells Ave. N. 3. Route through and store about 100' of each cable in the new vault on the SW corner of S 3rd St. and Wells Ave. S, SE. 4. Attach a label to the 288 cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". Attach a label to the 24 cable at each access point reading "City of Renton contact the City of Renton Information Services Division". 5. Provide and install toneable mule tape along the fiber cable in the underground. Segment B 1. Reel bare fiber test and provide test results of the customer provided 72 and 96 count SM fiber cables. 2. Install the 72 and 96 count SM fiber cables from the new vault the NW corner of N 1St St. and Wells Ave. N. along the fiber route to the new vault just east of 1-405 on the north side of NE 3` St. Route through and store about 200' of each cable in the vault. 3. Continue the installation along the route to an existing vault 150' west of NE 3`d St. and Monroe Ave NE intersection. Route through and store about 200' of each cable in the vault. 6 `ftol' 4. Continue the installation along the route to the new vault adjacent to the crosswalk near Honeydew Elementary School. Route through and store about 200' of each cable in the vault. 5. Continue the installation along the route to the existing vault on the NE corner of NE Sunset Blvd. and Duvall Ave. NE. Route through and store about 200' of each cable in the vault. 6. Attach a label to the 72 cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". Attach a label to the 96 cable at each access point reading "City of Renton contact the City of Renton Information Services Division". 7. Provide and install toneable mule tape along the fiber cable in the underground. Segment C 1. Reel bare fiber test and provide test results of the customer provided 36 count SM fiber cable. 2. Install the 36 count SM fiber cables from the existing vault located on the NW corner of NE Sunset Blvd. and Duvall Ave. NE through the existing city 2" conduit and through the new aerial conduits, underground conduits and inner duct along the route to the Hazen High School MDF. 3. Provide and install toneable mule tape along the fiber cable in the underground. Fiber Terminations and Splicing • Work to be done during normal working hours: Segment A 1. In the 25-TA on the NW corner of S Grady Way and Wells Ave. S, provide and install a splice enclosure of sufficient size to splice 288 fibers. 2. Splice fibers 25 - 96 of the 144 count SM fiber from KEC to fibers 25 - 96 of the 288 count SM fiber running north on Wells Ave S. 3. Splice fibers 145 - 156 of the 288 count SM fiber to RCH to fibers 145 - 156 of the 288 count SM fiber running north on Wells Ave S. 4. Do not splice or terminate the 24 count fiber. Segment B 1. In the 25-TA on the NW corner of N 1St St. and Wells Ave. N, provide and install 2 splice enclosures of sufficient size to splice 144 fibers each. 2. Splice fibers 25 - 84 of the 288 count SM fiber from S Grady Way to fibers 1- 60 of the 72 count SM fiber running north on Wells Ave S. 3. Splice fibers 145 - 156 of the 288 count SM fiber from S Grady Way to fibers 1 - 12 of the 96 count SM fiber running north on Wells Ave S. 4. Do not splice or terminate the 24 count fiber. 7 Segment C 1. In the 25-TA on the NE corner of NE Sunset Blvd. and Duvall Ave NE, provide and install a splice enclosure of sufficient size to splice 168 fibers. 2. Splice fibers 49 - 60 of the 72 count SM fiber from N 1St St. to fibers 25 - 36 of the 36 count SM fiber running to Hazen High School. 3. Splice fibers 1 - 12 of the 96 count SM fiber from N 1St St. to fibers 1-12 of the 36 count SM fiber running to Hazen High School. 4. Provide and install a 36 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the Hazen High School MDF. Terminate fibers 25 — 36 to the panel. Provide and install LC connector type bulkheads in the enclosure. 5. Perform bidirectional, end to end OTDR tests from the KEC MDF and the HHS MDFon the 12 terminated fibers at both 1590 nm and 1310 nm and provide the test documents to Renton School District. E. Fiber Apportionment Five single mode fiber optic cables will be installed. 1. Fibers 1 - 144 of the 288 count SM fiber cable shall be owned and maintained by the Renton School District. 2. Fibers 145 - 288 of the 288 count SM fiber cable shall be owned and maintained by the City of Renton. 3. The 24 count SM fiber cable shall be for the exclusive use of City of Renton. 4. The 72 count SM fiber cable shall be for the exclusive use of the Renton School District. 5. The 96 count SM fiber cable shall be for the exclusive use of City of Renton. 6. Fibers 25 - 36 of the 36 count SM fiber cable shall be owned and maintained by the Renton School District. 7. Fibers 1 - 24 of the 36 count SM fiber cable shall be owned and maintained by the City of Renton. M. Project Budget A. Construction Budget In consideration for the City of Renton allowing Renton School District fiber to occupy certain portions of the City's conduit system for the useful life of the fiber, Renton School District agrees to pay for all cost such as but not limited to: fiber optic cable, conduit upgrades if required, splice enclosures, fiber patch panels, miscellaneous parts and supplies and labor to install, test and certify the fiber system. All upgrades to the conduit system on city property and in the city right of way will be owned and maintained by the City of Renton. Conduit on Renton School District property will be owned and maintained by the District. At such time as the School District shall determine 8 *ftwe r.oe that utilizing the fiber optic cable is no longer in its interest, the District shall transfer ownership of the fiber to the City of Renton or remove the fiber from the city's conduit system, leaving the conduits in original condition. B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves. Expected future maintenance has been broken down into the following categories. If a maintenance issue arises that is not listed below, those costs shall be borne by the Renton School District. Locates The Renton School District agrees to pay for all locates required and requested through the Underground Utilities Locate Center(UULC) that is on Renton School District property. The City of Renton agrees to perform all locates required and requested through Underground Utilities Locate Center(UULC) for the fiber and conduit installed as a result of this agreement that is on property owned by the City of Renton and in City of Renton right-of-way. Relocation Any and all relocations on Renton School District property will be borne by the Renton School District. Any and all relocations on City of Renton property will be borne by the City of Renton. Repairs/Breaks The Renton School District, acting as the Lead Agency, shall contract with a competent and qualified vendor to provide 7x24x365, four hour response to any fiber breaks/outages that happen on the 288 count SM fiber, the 72 count SM fiber and the 36 count SM fiber. This service level agreement will require an annual premium, estimated to be $6,000.00, to ensure services are available when needed. The City of Renton, shall contract with a competent and qualified vendor to provide 7x24x365, four hour response to any fiber breaks/outages that happen on the 96 count SM fiber. This service level agreement will require an annual premium, estimated to be $4,000.00, to ensure services are available when needed. IV. Apportionment of Liability During construction, the Contractor shall be responsible for the project work and the project site. In the event that the project work causes or contributes to any harm, damage, injury or loss to any person or property, whether during construction or after completion of the project, each party shall be responsible to the extent the party is found to be at fault. The Renton School District shall ensure that District and all persons performing the Work, including without limitation District's suppliers and subcontractors, maintain in effect at all times during the Work, coverage or insurance in accordance with the 9 **Ape NN801 applicable laws relating to worker's compensation and employer's liability insurance (including, but not limited to, the Washington Industrial Insurance Act and the laws of the state in which any such person was hired), regardless of whether such coverage or insurance is mandatory or merely elective under the law. District shall furnish to Participating Agencies such assurance and evidence of such coverage or insurance (such as copies of insurance policies and Certificates of Compliance issued by the Washington State Department of Labor and Industries) as Participating Agencies may request. The Renton School District shall maintain in full force and effect throughout the term of this Agreement, a minimum of One Million Dollars ($1,000,000) liability insurance for property damage and bodily injury. The City of Renton shall be named as a primary and non-contributory additional insured on the property damage and bodily injury policies. In satisfying the insurance requirements set forth in this section, the District may self- insure against such risks in such amounts as are consistent with good utility practice or shall obtain a coverage agreement through a Risk Pool authorized by Chapter 39.24 RCW which shall provide liability coverage to the District for the liabilities contractually assumed by the District in this Agreement. At the time of execution of this Agreement, and prior to commencement of performance of any of the Work, District shall furnish Participating Agencies upon request with Certificates of Insurance and any applicable endorsement pages as evidence that policies providing insurance (or self-insurance) with such provisions, coverage's and limits are in full force and effect. V. Project Schedule Completed VI Changes or Addenda to General Terms and Conditions This Agreement shall run concurrent with the Interlocal Agreement General Terms and Conditions document. This document supersedes the Interlocal Agreement General Terms and Conditions document to the extent it contains terms and conditions which change, modify, delete, add to, supplement or otherwise amend the terms and conditions of the Interlocal Agreement General Terms and Conditions document. 10 r.r+` Approvals IN WITNESS WHEREOF, the parties hereto have executed this Fiber Optic Project Agreement on the respective dates indicated below. 7 Denis Law Date Mayor, Attest: City of Renton ><6en x ✓ wag*,-, Bonnie I . Walton, City Clerk Bill Hulten Date Chief Technology Officer Renton School District 403 11