Loading...
HomeMy WebLinkAboutAdden 31 S-06-097. Adden #31-08 ..0+ Fiber Optic Project 31 Renton School District - Kohlwes Education Center 300 SW 7`" St Renton, WA City of Renton — City Hall 1055 S Grady Way Renton, WA Install fiber between these sites An Addendum to the General Terms and Conditions for Sharing of Fiber Optic Installation Projects Interlocal Agreement 1 rr' we Table of Contents I. Project Description.................................................................................................. 3 A. Project Number 31 ............................................................................................... 3 B. Project Name Kohlwes Education Center fiber backbone to Grady and Wells . 3 C. Project Description............................................................................................... 3 D. Lead Agency/Project Manager............................................................................ 3 E. Participating Agencies......................................................................................... 3 11. Physical Description of Project............................................................................... 3 A. Project Route........................................................................................................ 3 B. Points of Demarcation.......................................................................................... 4 C. Facilities to be Used, Owners and Managers....................................................... 4 D. Project Specifications and Scope of Work...........................................................4 E. Fiber Apportionment............................................................................................ 5 III. Project Budget......................................................................................................... 6 A. Construction Budget............................................................................................ 6 B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves. ................................................................................. 6 IV. Apportionment of Liability..................................................................................... 7 V. Project Schedule...................................................................................................... 7 2 *Male L Project Description A. Project Number 31 B. Project Name Kohlwes Education Center fiber backbone to S Grady Way and Wells Ave. S Renton City Hall fiber backbone to S Grady Way and Wells Ave. S C. Project Description Install a 144 count single mode (SM) fiber cable for Renton School District and a 48 count SM fiber cable for the City of Renton running between Kohlwes Education Center and S Grady Way and Wells Ave. S. Install a 288 count SM fiber cable between RCH and the vault at S Grady Way and Wells Ave. S. Install a 25-TA vault in front of Kohlwes Education Center(KEC), interconnect an empty 4" conduit to KEC's MDF and interconnect existing two 2" City of Renton conduits on the north side of SW 7th St. Install a 25-TA vault at the NW corner of S Grady Way and Wells Ave. S intercepting a City of Renton conduit connecting to Renton City Hall (RCH) and intercepting the two City of Renton 2" conduits that connect to KEC. D. Lead Agency/Project Manager Renton School District/Steve Lewey E. Participating Agencies Renton School District, City of Renton. IL Physical Description of Project A. Project Route From Renton City Hall P2 phone room through existing 3" conduit to an existing vault on the east side of Benson Rd. S. North about 350' to the NE corner of the Benson Rd. S, Main Ave. S and S Grady Way intersection. West on the north side of S Grady Way about 1,400' to the NE corner of S Grady Way and Talbot Rd. S. North on the east side of Talbot Rd. S about 300' to the SE corner of S 7th St. and Talbot Rd. S. West on the south side of S 7th St. about 2,300' to a hand hole on the south side of SW 7th St. (about 100' west of Hardie Ave. SW). North crossing SW 7th St. then west on the north side of SW 7th St. about 400' to a new vault in front of Kohlwes Education Center and trough the existing 4" conduit to the KEC MDF. 3 *ftmwl 14001, B. Points of Demarcation Renton City Hall in the P2 phone room. Kohlwes Education Center's MDF. C. Facilities to be Used, Owners and Managers Renton School District conduit system and City of Renton conduit systems. D. Project Specifications and Scope of Work This project shall meet all the requirements of the City of Renton Public Works Department, i.e. traffic control plans, street use permits, waiver of existing underground ordinance, Renton Business License, etc. Route Preparation • Work to be done during normal working hours: 1. Provide and install a 25-TA vault in front of Kohlwes Education Center. Provide and install 4" schedule 80 PVC conduit as needed to intercept the existing, capped 4"building entrance conduit and extend it into the vault. Intercept the two existing 2" PVC conduit on the north side of SW 7th St. Provide and install sweeps and 2" schedule 80 PVC conduits as needed to connect this conduit to the new vault. 2. Provide and install a 25-TA vault on the NW corner of S Grady Way and Wells Ave. S. Provide and install a 2" PVC conduit from the vault to the existing type 1 hand hole containing the 1 ''/z" conduit crossing Wells Ave. S. Provide and install a 3" schedule 80 PVC conduit to the type 2 hand hole containing the existing two 2" conduit. 3. Provide the vault with a non-skid lid with welded raised lettering that reads: "LT/ITS". Replace sidewalk panels with 3,000 PSI concrete and finish to city specifications. 4. Restore adjacent landscaping to the condition that existed prior to the start of work. Underground and Aerial Fiber Placement • Work to be done during normal working hours: 1. Reel bare fiber test and provide test results of the customer-provided 48, 144 and 288 count single mode (SM) fiber cables. 2. Install the 144 count SM fiber cable from a vault at S Grady Way and Wells Ave. S to the vault at Kohlwes Education Center; continue into Kohlwes Education Center's MDF along an existing underground pathway. 3. Install the 48 count SM fiber cable from the vault at S Grady Way and Wells Ave. S to the vault at Kohlwes Education Center along an existing underground pathway and leave a 600' coil in the vault. 4 4. Install the 288 count SM fiber from the vault at S Grady Way and Wells Ave. S to Renton City Hall's P2 telephone room along an existing underground pathway. 5. Attach a label to the 144 count SM fiber cable at each access point reading "Renton School District contact Renton School District Information Management Services Department". Attach a label to the 48 and 288 count SM fiber cable at each access point reading "City of Renton contact City of Renton's Information Services Division". 6. Provide and install toneable mule tape along fiber cable in the underground. Fiber Terminations and Splicing • Work to be done during normal working hours: 1. Provide and install a 144 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the KEC MDF. Terminate 144 fibers to the panel. Provide and install LC connector type bulkheads in the enclosure. 2. Provide and install a 288 fiber capacity Corning LANScape patch panel in the assigned, existing rack in the RCH P2 telephone room. Terminate fibers 1-24 to the panel. Provide and install SC-APC connector type bulkheads in the enclosure in positions 1-24. 3. In the 25-TA on the NW corner of S Grady Way and Wells Ave. S, provide and install a splice enclosure of sufficient size to splice 288 fibers. 4. Splice fibers 1-24 of the 144 count SM fiber to fibers 1-24 of the 288 count SM fiber to provide a complete connection from KEC to City Hall. 5. Do not splice or terminate the 48 count fiber. 6. Perform bidirectional, end to end OTDR tests on the 24 terminated fibers at both 1590 nm and 1310 nm and provide the test documents to Renton School District and the City of Renton. E. Fiber Apportionment Three single mode fiber optic cables will be installed. 1. The 144 count SM fiber cable shall be for the exclusive use of the Renton School District. 2. The 48 count SM fiber cable shall be for the exclusive use of City of Renton. 3. Fibers 1-24 of the 288 count SM fiber cable shall be owned and maintained by the Renton School District. 4. Fibers 25-288 of the 288 count SM fiber cable shall be owned and maintained by the City of Renton. 5 *save 14� Ill. Project Budget A. Construction Budget In consideration for the City of Renton allowing Renton School District fiber to occupy certain portions of the City's conduit system for the useful life of the fiber, Renton School District agrees to pay for all cost such as but not limited to: fiber optic cable, conduit upgrades if required, splice enclosures, fiber patch panels, miscellaneous parts and supplies and labor to install, test and certify the fiber system. All upgrades to the conduit system on city property and in the city right of way will be owned and maintained by the City of Renton. Conduit on Renton School District property will be owned and maintained by the District. At such time as the School District shall determine that utilizing the fiber optic cable is no longer in its interest, the District shall transfer ownership of the fiber to the City of Renton or remove the fiber from the city's conduit system, leaving the conduits in original condition. B. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Moves. Expected future maintenance has been broken down into the following categories. If a maintenance issue arises that is not listed below, those costs shall be borne by the Renton School District. Locates The Renton School District agrees to pay for all locates required and requested through the Underground Utilities Locate Center(UULC) that is on Renton School District property. The City of Renton agrees to perform all locates required and requested through Underground Utilities Locate Center(UULC) for the fiber and conduit installed as a result of this agreement that is on property owned by the City of Renton and in City of Renton right-of-way. Relocation Any and all relocations on Renton School District property will be borne by the Renton School District. Any and all relocations on City of Renton property will be borne by the City of Renton. Repairs/Breaks The Renton School District, acting as the Lead Agency, shall contract with a competent and qualified vendor to provide 7x24x365, four hour response to any fiber breaks/outages that happen on the 144 count SM fiber. This service level agreement will require an annual premium, estimated to be $3,000.00, to ensure services are available when needed. The City of Renton, shall contract with a competent and qualified vendor to provide 7x24x365, four hour response to any fiber breaks/outages that happen on the 288 and 48 count SM fiber. This service level agreement will require an annual premium, estimated to be $3,000.00, to ensure services are available when needed. 6 err° "NO, IV. Apportionment of Liability During construction, the Contractor shall be responsible for the project work and the project site. In the event that the project work causes or contributes to any harm, damage, injury or loss to any person or property, whether during construction or after completion of the project, each party shall be responsible to the extent the party is found to be at fault. The Renton School District shall ensure that District and all persons performing the Work, including without limitation District's suppliers and subcontractors, maintain in effect at all times during the Work, coverage or insurance in accordance with the applicable laws relating to worker's compensation and employer's liability insurance (including, but not limited to, the Washington Industrial Insurance Act and the laws of the state in which any such person was hired), regardless of whether such coverage or insurance is mandatory or merely elective under the law. District shall furnish to Participating Agencies such assurance and evidence of such coverage or insurance (such as copies of insurance policies and Certificates of Compliance issued by the Washington State Department of Labor and Industries) as Participating Agencies may request. The Renton School District shall maintain in full force and effect throughout the term of this Agreement, a minimum of One Million Dollars ($1,000,000) liability insurance for property damage and bodily injury. In satisfying the insurance requirements set forth in this section, the District may self-insure against such risks in such amounts as are consistent with good utility practice or shall obtain a coverage agreement through a Risk Pool authorized by Chapter 39.24 RCW which shall provide liability coverage to the District for the liabilities contractually assumed by the District in this Agreement. At the time of execution of this Agreement, and prior to commencement of performance of any of the Work, District shall furnish Participating Agencies upon request with a Certificates of Insurance as evidence that policies providing insurance (or self-insurance) with such provisions, coverage's and limits are in full force and effect. V. Project Schedule Completed 7 `*00 -4.I' Approvals IN WITNESS WHEREOF,the parties hereto have executed this Fiber Optic Project Agreement on the respective dates indicated below. Dend Law Date Mayor, Attest: City of Renton Bonnie I . Walton , City Clerk 4, 4 Bill Hulten Date Chief Technology Officer Renton School District 403 8