Loading...
HomeMy WebLinkAboutChange Order - 11DocuSign Envelope ID: 1 CC98989-1 FDB-4F24-91 FF-DFD49496459D Contract Title: Change Order No. 11 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction. Inc. Contract No. CAG-22-163 Federal Aid No. : STPUL-1615(005) □Ordered by Engineer 1:8:1 Proposed by the Contractor □Unilateral D lumpSum 1:8:1 Bid Item □Force Account Amount Working Days Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Reviewed By: �� Er<gineer'o{ Record '°' Reviewed By: City Attorney 11 Date 1/16/2024 Date 1/16/2024 Date Date $28,284,172.90 500 $29,143,776.79 538 $0.00 0 $29,143,776.79 538 Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: Bill Adams Contractor aJtidd�; Digitally signed by Bill Adams Date: 2024.01.1915:46:14-08'00' Martin Pastucha 1ty8dl1 ffJWt8RPublic Works Administrator/ Mayor Change Order No. Contract Title: Rainier Ave S Corridor Improvements -Phase 4 Contract No. CAG-22-163 Date Date 1/19/2024 Date 1/31/2024 I 11:23 AM PST Date Page 1 of 5 CAG-22-163, CO #11-24 Approved by Cheryl Beyer via email 1/12/2024 DocuSign Envelope ID: 1 CC98989-1 FDB-4F24-91 FF-DFD49496459D THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The proposal is revised as follows: 11-A22-Gravel Borrow Incl. Haul, -2,350 CV@ $48.25/CV = -$113,387.50 11-A172-Gravel Borrow Incl. Haul, 3,360.6254 TN@ $33.74/TN = $113,387.50 11-D6 -Gravel Borrow Incl. Haul, -2,735 CV@ $34.60/CV = -$94,631.00 11-D62 -Gravel Borrow Incl. Haul, 3,910.3719 TN @ $24.20/TN = $94,631.00 SP 2-03.5 paragraph 2 is deleted in its entirety and replaced as follows: "Gravel Borrow Incl. Haul", per ton. SP 2-09.4 paragraph 2 sentence 2 is deleted in its entirety and replaced as follows: Horizontal: Duct Bank Width + Minimum Separation + 12 inches SP 8-35.4 paragraph 3 is deleted in its entirety and replaced as follows: "Sand Bedding Incl. Haul for Joint Utility Trench" shall be measured and paid per ton and will be based on the weight of material installed into the Work. Certified weight tickets shall accompany each load, a copy of tickets shall be given to the Engineer daily. Wasted materials will not be included in the measurement or payment. Only materials placed within the pay limits shown will be considered for measurement and payment. Material placed outside of the pay limits shown on the Plans or as approved by the Engineer will be deducted from the certified tickets. SP 8-35.4 paragraph 4 is deleted in its entirety and replaced as follows: "Controlled Density Fill Incl. Haul for Joint Utility Trench" will be measured by the cubic yard for the volume installed in place. Change Order No. Contract Title: Contract No. 11 Rainier Ave S Corridor Improvements -Phase 4 CAG-22-163 Page 2 of 5 DocuSign Envelope ID: 1 CC98989-1 FDB-4F24-91 FF-DFD49496459D To be attached to Change Order: IZI Estimated Change Order Cost □Plans □Field Directive/Request for Information Response/Serial Letter □Contractors Quotation □Project Labor List □Force Account Equipment Rate Request (DOT Form 422-010 EF) □Overhead Adjustment Determination Change Order No. Contract Title: Contract No. 11 Rainier Ave S Corridor Improvements -Phase 4 CAG-22-163 Page 4 of 5 DocuSign Envelope ID: 1 CC989B9-1 FDB-4F24-91 FF-DFD49496459D Revised Unit of Measurement for Gravel Borrow and Revised Pay limits for Sand Bedding and Controlled Density Fill -Estimated Change Order Cost Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: Federal Aid No: Construction Manager: Item No. Rainier Ave S Corridor Improvements -Phase 4 Pivetta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) Perteet Description Quantity Engineers Estimate Labor Labor Markup Equipment Equipment Markup Materials Materials Markup Services Services Markup Mobilization Subcontractor Subcontractor Markup 11-A22 Gravel Borrow Incl. Haul 11-A172 Gravel Borrow Incl. Haul 11-D6 Gravel Borrow Incl. Haul 11-D62 Gravel Borrow Incl. Haul Per attached determination Estimated Change Order Cost (Schedule A) Estimated Change Order Cost (Schedule D) Estimated Sales Tax Cost (Schedule D) Estimated Change Order Cost Summary of Contractors Quotes: Item Quote Location 11-A172 N/A 11-D62 N/A Total Quoted Added Cost: Quoted Cost N/A N/A $0.00 I Bid Item Change Overhead -2350 3360.6254 -2735 3910.3719 Change Order No. 11 Unit Hours Labor Cost Hours Cents/Dollar EA Cents/Dollar LF Cents/Dollar Estimate Estimate Cents/Dollar By: Jordan Howe Date: 1/11/24 Unit Price $ 0.31 $ 0.21 $ 0.21 $ 0.21 $ 0.12 CALCULATED TOTAL: ESTIMATED TOTAL: CY $ 48.25 TN $ 33.74 Schedule A Calculated TOTAL Schedule A Estimated TOTAL CY $ 34.60 TN $ 24.20 Schedule D Calculated TOTAL Schedule D Estimated TOTAL By Agreement Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$113,387.50 $113,387.50 $0.00 $0.00 -$94,631.00 $94,631.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I Change Order #11 -Page 5 of 5 I