HomeMy WebLinkAboutAddendum - 2AMENDMENT NO. 2 TO AGREEMENT FOR FINAL DESIGN OF THE
SE 172ND ST & 125TH AVE SE GREEN STORMWATER
INFRASTRUCTURE PROJECT
THIS AMENDMENT, dated for reference purposes only as January 16, 2024, is by and between
the City of Renton (the “City”), a Washington municipal corporation, and Osborn Consulting, Inc.
(“Consultant”), a Washington corporation. The City and the Consultant are referred to collectively
in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is
effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG‐23‐082, dated
February 1, 2023, to provide necessary services for the Final Design of the SE 172nd St & 125th Ave
SE Green Stormwater Infrastructure Project (referred to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide for 100% Design and
final plans, specifications, and cost estimate.
NOW THEREFORE, It is mutually agreed upon that CAG‐23‐082 is amended as follows:
1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A‐2, which is attached and incorporated herein.
2.Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit D‐2. All Work shall be performed by no later than
December 31, 2024.
3.Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $98,969 from $132,614 to $231,583,
plus any applicable state and local sales taxes. The additional compensation shall be paid
based upon Work actually performed according to the rate(s) or amounts specified in
Exhibit C‐2,which is attached and incorporated herein].
4.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
CAG-232-082, Adden #2-24
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Armondo Pavone
Mayor
Robert Parish
Vice President
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By:__________________________
Shane Moloney
Renton City Attorney
Contract Template Updated 06/17/2021
01/19/2024
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
2-5-2024
Approved by Cheryl Beyer via 1/17/2024 email
1 | Page
SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
EXHIBIT A-2
SCOPE OF WORK
Project Name: SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
Client:City of Renton
Prime Consultant: Osborn Consulting, Inc.
Contract Number:
BACKGROUND
The Project will plan and design stormwater system modifications and green stormwater infrastructure
(GSI) to improve water quality and drainage capacity for approximately half a block (600 ft) north of SE
172nd Street for 122nd Ave SE, 123rd Ave SE, 124th Ave SE and 125th Ave SE, and approximately two
blocks (1,400 ft) of SE 172nd Street. This project for the City of Renton (City) will consist of installing a
new stormwater conveyance system and green infrastructure with pervious concrete sidewalks
supplemented with GULD facilities to collect and treat stormwater runoff from approximately 2 acres of
pollution generating impervious surfaces.
The project design and deliverable will meet the requirements of the Washington State Department of
Ecology (Ecology) Water Quality Stormwater Pre-Construction Grant agreement and follow the 2019
Stormwater Management Manual for Western Washington (2019 SWMMWW), and the 2022 City of
Renton Surface Water Design Manual (SWDM) as an amendment to the 2021 King County Surface
Water Design Manual.
This amendment will provide the final design of the project to bid ready plans, specifications and
engineers estimate. This will include the final bid package deliverables for Ecology’s approval. The final
bid package will include the water and sewer final design elements as a separate bid schedule that will be
compiled through a separate task amendment. Additional site survey will be completed to document
driveway and private fence revisions completed since the previous site survey. Support services during
bidding and construction will be added through a future project amendment.
The scope of work below is assumed to be completed between approximately January 2024 to June
2024. Construction is planned to begin in the autumn of 2024.
SCOPE OF WORK
Task 1 Project Management
Monitoring and communicating the status of the scope, schedule, and budget of this work assignment and
providing monthly reporting to the City over a 6-month period.
Consultant Services
Prepare status reports describing the following:
Services completed during the month.
Outstanding issues (if any).
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
2 | Page
SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
Scope/schedule/budget status.
A financial summary.
Project Management including client/subconsultant coordination.
Manage Project Schedule
Bi-weekly PM Check-ins.
Manage Issue Log for City and all team members.
Manage Risk Register to identify and document project risks and mitigation strategies.
Monthly progress tracking and reporting.
Client Responsibility
Attend project meetings (via teleconference).
Review and approve invoices.
Review and comment on submittals within the project schedule.
Assumptions
One meeting will be held with the City to review the Revised 90% review comments.
One meeting will be held with the City to review the Revised 95% review comments.
Meetings will be held virtually with bi-weekly meetings lasting up to 30-minutes.
Deliverables
Project schedule, update to be provided with monthly status reports.
Issue Log and Risk Register to be provided at each deliverable.
Bi-weekly check-in action items summary.
Monthly status reports.
Task 7 Storm and Roadway Design – 95% Submittal
The Consultant shall revise the design layout per City review comments with the 95% design submittal to
provide dispersed water quality treatment units with reduced piped conveyance connections to these
proposed facilities to limit system complexity, maintenance concerns and reduce the number of utility
relocations required. The locations of existing driveways and fences that have been modified since the
previous site survey will be located in the field with electronic updates to the project basemap.
The 95% design plans, estimate and specifications will include the stormwater and roadway
improvements with the proposed improvements to the water and sewer system reflected in the revised
design. The water and sewer improvements will be included as a separate submittal with separate bid
schedules within the combined SE 172nd GSI Project Final Ad-Ready Submittal in Task 8.
Consultant Services
Site survey of up to 3 driveways and two fences will be completed with electronic updates to the
project basemap and construction sheets.
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
3 | Page
SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
The 90% Design Report will be updated to reflect to design changes to the water quality system
for review and approval by the City and Ecology.
The project existing conditions sheets, proposed improvement sheets and cost estimates will be
updated to reflect the revised field survey.
The 95% plans, special provisions and cost estimates will be updated per the revised stormwater
system design and to address 90% review comments.
Client Responsibility
City to provide one (1) consolidated review comments of the Revised 90% submittal by the City
and Soos Creek.
Assumptions
Sewer design will be completed through Amendment No. 3 of this contract. The Soos Creek
standard plans to be included in an appendix of the project specifications.
Additional site survey along 125th Ave SE for the sewer force main design will be completed and
incorporated into the project basemap through Amendment No.3 of this contract.
No roadway or pedestrian improvements will be required south of SE 172nd St along 125th Ave
SE.
The City will update and compile the project specifications, with exception to the bid schedule
summary in Section 10 and the Special Provisions in Section 24.
Deliverables
95% Design Package Submittal (PDF)
Revised 90% Review Comment Responses (PDF)
95% Design Construction Plans with Soos Creek water and sewer 50% plans as a separate
submittal (PDF)
95% Design Special Provisions with Soos Creek specifications (PDF and MS Word
document)
95% Design Construction Estimate of Probable Cost (PDF and Excel Spreadsheet)
95% Design Report (PDF)
Task 8 Storm and Roadway Design – Final Submittal
The Consultant shall provide comment response and make minor updates to the reports and plans based
on City’s and Ecology’s comments.
The final design plans, estimate and specifications will include the stormwater and roadway
improvements along with the water and sewer improvements as separate bid schedules in the combined
SE 172nd GSI Project Final Ad-Ready Submittal.
Consultant Services
Updates to the Final Design Report will be completed to address City and Ecology comments and
meet the grant submittal requirements.
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
4 | Page
SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
The construction plans, specifications and cost estimates will be updated to address review
comments.
The project working day estimate will be updated per final design improvements, including the
completion of the water and sewer improvements through separate bid schedules.
Client Responsibility
City to provide one (1) consolidated review comments of the 95% Design submittal by the City
and Soos Creek.
Provide updates to the project specifications and compile into a single Ad-Ready PDF.
Assumptions
The Cover Sheet, Notes and Abbreviations sheets will be incorporated in the final combined
submittal.
Sewer design will be completed through Amendment No. 3 of this contract. The Soos Creek
standard plans to be included in an appendix of the project specifications.
The City will update and compile the project specifications, with exception to the bid schedule
summary in Section 10 and the Special Provisions in Section 24.
There will only be minor changes to the project design to address review comments of the 95%
Design submittal.
A design report of sewer improvements will not be required.
Neither pump station nor SCADA modification will not be required.
Deliverables
Final Design Package Submittal (PDF)
95% Design Review Comment Responses (PDF)
100%/Ad Ready Construction Plans, including Soos Creek water and sewer plans (PDF)
100%/Ad Ready Special Provisions with Soos Creek specifications (PDF and MS Word
document)
Engineer's 100%/Ad-Ready Construction Estimate of Probable Cost (PDF and Excel
Spreadsheet)
100%/Ad-Ready Design Report (PDF)
GENERAL ASSUMPTIONS
All coordination with property owners will be handled by the City.
Electronic copies of plan sets will be provided. Printing of hard copy sets will be provided by the
City.
Project specifications and bid items will be based on WSDOT standard specifications.
Planting plans will consist of a hatch pattern which defines plant species and planting
requirements.
Traffic Control plans are not included in this scope of work.
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
5 | Page
SE 172nd St Green Stormwater Infrastructure Project- Final Design
Amendment 2 – Final Design and Construction Support
Flow Control will not be required.
No additional geotechnical investigation will be required.
No additional potholing of sewer force main or other utilities will be needed.
No site visits will be required prior to the final design submittal.
Additional permit support is not required.
Assume one (1) round of comments from the City and Soos Creek on the Revised 90% Design
Submittal and one (1) round of comments for the 95% Design Submittal.
No pipe alignment design changes will not be required after 100% submittal.
Temporary Construction Easements will not be required.
SCHEDULE
The overall project design, through construction support, is estimated to cover a 6-month period from
January 2024 to June 2024.
TASK ORDER BUDGET
TASK ITEM COST
Task 1 Project Management $ 11,361
Task 7 95% Design Submittal $ 64,766
Task 8 Final Submittal $ 22,842
Total $ 98,969
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
Osborn Consulting, Inc. ‐ City of Renton SE 172nd St and 151st Ave SE GSI ProjectFinal Design ‐ Amendment No. 2EXHIBIT B‐2Firm$0.00PIC PM Sr. PEDesign EngineerSenior Civil TechCivil Tech ISr. Admin AdminSub Mark‐UpHourly Rate (2024)$227.35 $217.22 $182.33 $130.56$154.57 $93.42 $164.44 $120.432.0%Project TasksTotal Hours102412 0 0 0 0 14‐$ ‐$ 11,361$ ‐$ $11,361 11%Total Hours24 60 96 104 34 78 0 0‐$ 52$ 62,166$ 2,600$ $64,766 65%Total Hours92846384800‐$ ‐$ 22,842$ ‐$ $22,842 23%Firm Subtotal: $96,369 $0% of total budget: 97% 0%$98,969100%Task 1: Project ManagementTask 8: 100% Storm and Roadway Design Package SubmittalTask 7: 95% Storm and Roadway Design Package SubmittalOCIDHA SurveyingClassificationExpense Cost EstimateHours EstimateCost EstimateCity of Renton 172nd St and 125th Ave GSI_Phase 2_Amend 2 ‐Final Design_ FeeEstimate_Exhibit B_2024‐01‐16 Osborn Consulting, Inc.Printed: 1/18/2024Page 1 of 1DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
EXHIBIT C-2
Renton SE 172nd St & 125th Ave SE
All-Inclusivie Billing Rates – January 1, 2024 to December 31, 2024
2024
Hourly Rate
227.35$
217.22$
200.62$
182.33$
160.95$
130.56$
109.17$
69.78$
177.59$
154.57$
123.33$
93.42$
164.44$
120.43$
137.31$
Project Assistant
Graphic Design
Project Engineer
Design Engineer
Engineer in Training
Intern Engineer
Senior Civil Designer
Civil Tech I
Civil Tech II
Senior Civil Tech
Senior Administration
Classification
Principal
Project Manager
Senior Engineer II
Senior Engineer I
DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4
Exhibit D -2Osborn Consulting, Inc. ‐ City of Renton SE 172nd St and 152nd Ave SE GSIFinal Design ‐ Amendment 212 19 26 2 9 16 23 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28Task #Task Description1Project Management7Storm and Roadway Design - 95% DesignDX8torm and Roadway Design - Final DesignDXLegendConsultant TasksD DeliverableCity TasksX MeetingProject ScheduleJan-24 Feb-24Mar-24Apr-24May-24Jun-24DocuSign Envelope ID: 858A6534-723C-4A41-BF7A-BE1121795BE4