HomeMy WebLinkAboutMFP23005658.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23005658
IVR Number: 23005658
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:11/08/2023Application Date:3223059075Parcel Number: 18809 116TH AVE SE
Permit Type:02/08/2024Issue Date:Franchise
Permit Work Class:02/07/2025Expiration Date:Minor Utility
Job Number: 106395497Franchise Type:Natural Gas
Description: PSE Gas CREW TO INSTALL NEW COMMERCIAL GAS SERVICE AT MAIN, APPROX 43' IN ROW. 1:3'X5' ASPHALT
CUT AND 2 GRASS CUTS ANTICIPATED. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
INFRASOURCE, INC
6905 S 228TH ST KENT, WA 98032
PLEASE SEE ATTACHED
106395497
18809 116TH AVE SE # SHELTER
Jason Schaefer (425) 320-6926
MFP23005658
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 2/8/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
STOP
FLAGGER
STOP
FLAGGER
STOP
FLAGGER W20-7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE 116TH AVE SEW20-7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADX'X'X'ROAD
WORK
AHEAD W20-11010
1010
1616PRIVATE
STREET
SE 188TH ST
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
jose.rodriguez@pse.com
425-424-6658
JOSE RODRIGUEZ
1 OF 1 18809 116TH AVE SE, RENTON, WA 98058
0
514276153
10/30/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 18' NCL of SE 188th St & 12'
WCL of 116th Ave SE, 18' NCL of SE 188th St & 38'
WCL of 116th Ave SE, and 4' NCL of SE 188th St & 38'
WCL of 116th Ave SE.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
WORK PIT
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
John Crofoot
Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658
0'60'30'
MFP23005658
Service Address:
City Zip:
Site Contact:Phone:
Site Contact Email:
Est. Start Date:
Customer Email:
&
&
&
Q215.083
116TH AVE SE 3 X 5 X 3
SE 188TH ST 38'West of CL 116TH AVE SE
PM / Inspector:
charles_hargis@cable.comcast.com
98058
Phone:(971)777-0915
4 X 5 X 3
4'North of CL SE 188TH ST 38'West of CL
18'North of CL
116TH AVE SE 3 X 7 X 3
1/22/24Date:
106395497Job #:
Renton
18809 116TH AVE SE # SHELTER
Ken Bellefeuille 360-540-5776RENTON
Work Location
18'North of CL SE 188TH ST 12'West of CL
YesROW Permit:
Surface Type
A
GRS
Size of Cut
GRS
Yes New Commercial Svc
Service Information Street Information
1-1/4" PE
7800671
Del Press:2 PSI Traffic Signal:Bus Stop:No KNT FLT - KentBollards:2.5" #4" #ADA Ramps #:0 Route #'s:
Meter Loc:Trolley Lines:No Mtr Hoods #:003 - OL
A630 Steel - 1-1/4" x 1-1/4" - Style H17501 -
PLAT Map:
N
EFV:1-1/4" - 2600 - 9996744 Police #:0 TCP:Yes Tie-In Fitting
Meter:Speed Limit:30 No Parks #:6
Job Type
Diameter:Flaggers #:3 Arterial:
Jurisdiction:
Project Scope: Install new 1-1/4" Commercial service - 43' SCAT STUB + 102' PLAT EXT, set an A630 meter @ 2# PSI.
C.P. NOTES - NO ADDITIONS.
POTHOLE ALL EXISTING UTILITIES.
RESTORATION PER CITY OF RENTON STANDARDS.
Est. Duration:
No
Job Description
New Construction:
Construction Method
Building Foundation Type
Septic System
2 Days (16 Hours)
No
Slab
Hole Hog
kenneth.bellefeuille@enersys.com
Phone:(425) 320-6926Jason Schaefer
PL
CL
7'
3'Sidewalk<42 FT ROW / 30 FT ROW
5'
4'
5'
3'
PROPOSED 1-1/4"
PE SERVICE
C&C EXIST 1-1/8"
HE PE STUB
2" STW IP 12' W
5205-1963
PARKING STRIP3,000 SQ FT
WORK AREA
18809 116TH AVE SE
# SHELTER AD
PARCEL # 3223059075
SEWER MAN HOLE, GAS
TO BE SEPARATED BY 5
FEET MINIMUM
MFP23005658
ae
énton CAPITAL PLANNINGscHootorevaic?AND CONSTRUCTIONSERVICE|EXCELLENCE |EQUITY
DATE:January 3,2024
TO:Dr.Damien Pattenaude,Superintendent
FROM:Matt Feldmeyer,Executive Director,Capital Planning and Construction
FOR BOARD DATE:January 10,2024 \/JaN
CONSENT AGENDA ITEM:Easement —PSEat Benson Hill Elementary School
Puget Sound Energy needs an Easementat BensonHill Elementary School to construct,
operate,maintain,repair,replace,improve,remove,upgrade and extend one or moreutility
systems for the purpose of transmission,distribution and sale of gas per the attached
documents.
DISTRICT GOAL(S):Removing Barriers and Supporting Students
BUDGETIMPLICATION:
This item has no budget implication.
RECOMMENDATION:
Recommendapprovalof the attached PSE Easement for Benson Hill Elementary
ATTACHMENT(s):Easement
|have reviewed and recommend approvalof this request:
Jennifer A.Farmer 3 Jan 2024JenniferA.Fatmer (Jan 3,2024 13:23 PST)
Jennifer A.Farmer Date
Assistant Superintendent of Finance and Operations/CFO
SERVICE |EXCELLENCE|EQUITY
7812 S 124"St,Seattle,Washington 98178-4830 |p.425.204.4403 |£.425.204.4476
MFP23005658
RETURN ADDRESS;Puget Sound Energy,Inc.
Attn:ROW DepartmentPOBox97034/EST-O6W
Bellevue,WA 98009-9734Attn:FD
@ PuGET SOUND ENERGY
EASEMENT
REFERENCE#:GRANTOR(Owner):RENTON SCHOOLDISTRICT #403GRANTEE(PSE):PUGET SOUND ENERGY,INC.
SHORT LEGAL:A portion of the SE %of Section 32,Township 23N,Range 5E,King County,WA
ASSESSOR’S PROPERTY TAX PARCEL:322305-9149
For good and valuable consideration,the receipt and sufficiency of which are hereby acknowledged,RENTON
SCHOOLDISTRICT #403,a Washington corporation ("Owner"),hereby grants and conveys to PUGET SOUND
ENERGY,INC.,a Washington corporation ("PSE"),for the purposes hereafter set forth,a nonexclusive perpetual
easementover,under,along,across andthrough the following described real property (the "Property"herein)in King
County,Washington:
THE SOUTH 505.10 FEET,AS MEASURED AT RIGHT ANGLES TO THE SOUTH LINE OF THE
SOUTH HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION
32,TOWNSHIP 23 NORTH,RANGE 5 EasrT,W,M.,IN KING COUNTY,WASHINGTON;
EXCEPT THAT PORTION DEEDED TO KING COUNTY FOR STREET PURPOSES ASDESCRIBEDINDEEDRECORDEDUNDER20040916000765,RECORDSOF KING COUNTY,
WASHINGTON.
Except as may be otherwise set forth herein PSE's rights shall be exercised upon that portion of the Property
(Easement Area"herein)described asfollows:
An EASEMENTAREA TEN (10)FEET IN WIDTH HAVING FIVE (5)FEET OF SUCH WIDTH ON EACHSIDE OF THE
CENTERLINE OF PSE’S FACILITIES AS NOW CONSTRUCTED OR TO BE CONSTRUCTED,EXTENDED OR
RELOCATED LYING WITHIN THE ABOVE DESCRIBED PROPERTY.
4.Purpose.PSE shall have the right to use the Easement Area to construct,operate,maintain,repair,
replace,improve,remove,upgrade and extend one or moreutility systems for purposes of transmission,distribution
and sale of gas.Such systems mayinclude,but are notlimited to:
Undergroundfacilities.Pipes,pipelines,mains,laterals,conduits,regulators,gauges and rectifiers
for gas;fiber optic cable and otherlines,cables and facilities for communications;semi-buried or
ground-mountedfacilities and pads,manholes,meters,fixtures,attachments and any and all other
facilities or appurtenances necessary or convenientto anyorall of the foregoing.
Followingtheinitial construction ofall or a portion ofits systems,PSE may,from timeto time,construct such
additionalfacilities as it may require for such systems.PSE shall have the right of access to the Easement Area over
and across the Property to enable PSEto exerciseits rights granted in this easement.
PSE Gas Easement 2021
W/O 106395497,RW-132232Page1of3
2.Access.PSEshall have a reasonable right of access to the Easement Areaoverand across the Property
to enable PSEto exercise its rights granted in this easement.
3.EasementArea Clearing and Maintenance.PSEshall have the rightto cut,remove and disposeof any
andall brush,trees or other vegetation in the Easement Area.PSE shall also havethe right to control,on a continuing
basis and by any prudent and reasonable means,the establishment and growth of brush,trees or other vegetation in
the EasementArea.
4.Trees Outside Easement Area.PSE shall have theright to cut,trim remove and disposeof any trees
located on the Property outside the EasementAreathat could,in PSE’s reasonable judgment cause damageto PSE’s
systems and/or present a hazard to the general public health,safety or welfare as definedin RCW 64.12.035.PSE
shall,exceptin the event ofan emergency,prior to the exercise of such right,identify such trees and make a reasonable
effort to give Ownerprior notice that such trees will be cut,trimmed,removedor disposed.Ownershall be entitled to
compensation for the actual market value of merchantable timber(if any)cut and removed from the Property by PSE.
5.Restoration.Following theinitial installation,repair or extensionofits facilities,PSE shall,to the extent
reasonably practicable,restore landscaping and surfaces and portions of the Property affected by PSE's work to the
condition existing immediately prior to such work.PSE shall use goodfaith efforts to perform its restoration obligations
under this paragraph as soon as reasonably possible after the completion of PSE's work.
6.Owner’s Use of Easement Area.Ownerreserves the right to use the Easement Area for any purpose
not inconsistent with the rights herein granted,provided,however,Owner shall not perform the following activities
without PSE's prior written consent:(1)excavate within or otherwise change the grade of the Easement Area;(2)
construct or maintain any buildings,structures or other objects on the EasementArea;and/or (3)conduct any blasting
within 300 feet of PSE'sfacilities.
7.Indemnity.PSE agrees to indemnify Owner from and against liability incurred by Owner as a result of
PSE’s negligence,or the negligence of PSE’s employees,agents or contractors in the exercise of the rights herein
granted to PSE,butnothing herein shall require PSE to indemnify Ownerforthat portion of any suchliability attributable
to the negligence of Owner,its employees,agents or contractors or the negligence of third parties.
8.Attorneys’Fees.The prevailing party in any lawsuit brought to enforce or interpret the terms of this
Easementshall be entitled to recoverits reasonable attorneys’fees and costsincurred in said suit,including on appeal.
9,Successors and Assigns.This Easementis binding upon andwill inure to the benefit of the successors
and permitted assignsofthe parties.PSE may not assign or otherwisetransfer anyofits rights,obligationsorinterest
under this Easement without the prior written consent of Owner,which consent may not be unreasonably withheld.
Notwithstanding the foregoing,PSE mayassign this Easementto anaffiliate or in connection with a merger,acquisition,
corporate reorganization,sale of assets or other change in control.
10.Complete Agreement;Amendment;Counterparts.This Easement contains the entire agreement of
the parties with respect to this subject matter and supersedesall prior writings or discussions relating to the Easement.
This Easement may not be amended except by a written document executed by the authorized representatives of
Owner and PSE.This Easement may be executed in counterparts,each of which shall be treated as anoriginal forall
purposes andall executed counterparts shall constitute one agreement.
11.Warranty and Representation of Authority.The parties each representto the other that the person or
persons executing this Easement have authority to do so andto bind the parties hereunder.All consents,permissions
and approvals related to this Easement,and the obligations hereunder,have been obtained.Ownerfurther warrants
to PSEthatit has the necessaryright,title and interests in the Property to grant the easementrights set forth herein.
12.Severability.Invalidation of any of the provisions contained in this Easement,orof the application thereof
to any person,by judgment or court order,shall in no way affect any of the other provisionsthereof or the application
thereof to any other person and the sameshall remaininfull force and effect.Ifa provision is found to be unenforceable
or invalid,that provision shall be modified or partially enforced to the maximum extent permitted by law to effectuate
the purpose of this agreement.
PSE Gas Easement2021W/O 106395497,RW-132232Page2of3
13.Non-Waiver.The failure of any party to insist upon strict performance of any of the terms,covenants or
conditions hereof shall not be deemed a waiver of any rights or remedies which that party may have hereunderorat
law or equity and shall not be deemed a waiver of any subsequent breach or default in any of such terms,covenants
or conditions.
DATEDthis jor day of SULLY 202F.
#403,a Washington corporation
By:rinted Name)
ns Sipiateadenat(Titles
STATE OF WASHINGTON )*)sscountyor_&Lay )
Onthis 1/0Teaay of Tanacg.,20.ZF,before me,the undersigned,a Notary Public
in d for the State of Washingtn,duly commissioned and sworn,personally appeared
z ite ben ,to me known to be the person(s)who signed
as ta ,of RENTON SCHOOLDISTRICT #403,a
Washington corporation,the corporation that executed the within and foregoing instrument,and acknowledged said
instrument to be his/her free and voluntary act and deed and the free and voluntary act and deed of said corporation
for the uses and purposes therein mentioned;and on oath stated that he/she was authorized to execute the said
instrument on behalf of said corporation.
IN WITNESS WHEREOF|have hereunto set my hand andofficial seal the day and yearfirst above written.
SANDRA M DOLEH (Signature of Notary)
Notary Public Grdre MN Do [4h
Stateof Washington (Print or stamp nameof Notary)Commission #145487MyComm.Expires Nov 27,2025 NOTARY PUBLIC hye for the State of Washington,residing
at A LA
My AppointmentExpires:AVC bur a7 DIS
Notary seal,text and all notations mustbeinside 1”margins
PSE Gas Easement2021W/O 106395497,RW-132232Page3of3
NPEGYshee