CONTRACT: CAG-14-090 SW 7th St/ Naches Ave SW Storm System Improvement C.O.# 4
Project— Phase 1
CONTRACTOR: Road Construction Northwest, Inc.
SUMMARY OF PROPOSED CHANGE:
C04A PSE Power Extension Force Account
Complete installation of a new power system by Puget Sound Energy(PSE)to provide power for the new
irrigation controller and irrigation system. All materials, equipment, and labor are included. Puget Sound
Energy costs are preliminary estimates and may change when the work is ordered and performed by PSE.
Depending on conditions some of the subtasks may not be needed. In that case payment for those subtasks
would be zero. Payment for subtasks will be prorated for the actual work needed.
The costs estimates for this changer order are per the attached March 11, 2014 letter from Road Construction
Northwest. The costs include sales tax and contractor's mark up. The work includes but is not limited to the
following subtasks:
1. Installing anew power transformer and base on the west side of Naches Ave SW (PSE)
Estimated cost= $9,974.32
1.a Installing new handhold, if required, on west side of Naches Ave SW (PSE)
Estimated cost=$9,483.76
2. Installing new power lines from the PSE vault on the east side of Naches Ave SW, in the existing power
conduits under Naches Ave SW, to the new transformer on the west side of Naches Ave SW (PSE)
Estimated cost= $5,701.92
3. Locating and exposing the existing power conduits on the west side of Naches Ave SW. Verifying that
they are suitable for PSE use. Making any adjustments, or extending the conduits to the new
transformer location, if needed. (RCNW, Signature Landscaping, or PSE).
Estimated cost=$4,700.80
4. Installing two bollards in front of the new transformer, if required by PSE (RCNW, Signature
Landscaping).
Estimated cost= $1,307.34
5. Contractor supervision, coordination, and assistance for PSE and Signature Landscaping.
Estimated cost=$5,740.50
CO-4A -Total estimated costs for all CO-4A subtasks =$36,908.64
Requested Additional Working Days: 15 days
CO-4113 Install Irrigation Controller Cabinet and Connect Power Force Account
All work needed to install a new steel cabinet and base to house the irrigation controller and PSE power
meter, and to supply power to the irrigation controller from the new PSE transformer. All materials,
equipment, and labor are included. The costs are preliminary estimates and may change when the work is
H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3570 Hardie Ave-SW 7th\1604 Change Orders\2015-0316 CO-4
SW7th-Naches.doc/DC
performed. Depending on conditions some of the subtasks may not be needed. In that case payment would
be zero for those subtasks. Payment for subtasks will be prorated for the actual work needed. The costs
include sales tax and contractor's mark up. The work includes but is not limited to the following subtasks:
1. Provide and install new steel irrigation controller cabinet and concrete base. The cabinet will be
locking,and will include a meter base and viewing window so the PSE power meter can be read.
Estimated cost=$3,008.36
2. Connect power to the new controller cabinet,including running the power lines from the PSE
transformer to the controller cabinet. Provide all electrical items needed inside and outside the
cabinet including conduits,electric panel,circuit breakers,an outlet to plug controller Into,and
connections needed for PSE power meter.
Estimated cost=$3,268.36
3. The costs for any State and City applications,permits,and inspections needed to install the new
cabinet and electrical system.
Estimated cost=$919.80
4. Installing the new irrigation controller(clock)in the cabinet and connecting the power and irrigation
system wiring to it. Test and troubleshoot the irrigation system so all water zones,valves,and
sprinklers are connected and functioning correctly.
Estimated cost=$840.08
5. Remove the existing steel service cabinet,remove concrete base,and plug all conduits,if required by
the City.
Estimated cost=$1,962.24
The costs for this changer order are per the attached March 11,2015 letter from Road Construction
Northwest. The costs include sales tax and contractor's mark up.
CO-48 -Total estimated costs for all C0-48 subtasks=$9,998.24
Requested Additional Working Days:5 days
TOTAL CHANGE ORDER COST for CO-4A and 4B= $46,907.48
Working Days
Additional Working Days added to the Contract for this Change Order: 20
Working days will start when PSE starts work at the site.
Schedule:PSE may schedule their work 2 to 3 months from now. The contractor work will immediately follow
the PSE work.
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THISORDER TOTAL AFTER CHANGE
$1,975,032.00 $2,013,325.50 $46,907.48 $2,087,064.04
SIGNATURES:
Contractor: Jeffrey M. Kan er/President Date: 3
Project Engineer: Gam" Date: 3
Approved By: Date:
(uGNry Systems oiector at Engineerag Manager)
H:\File Sys\SWP-Surface water Projects\SW P-27-Surface Water Projects(cIPA27.3570 Hardie Ave-SW 7th\1604 Change Orders\2015-0316 CO-4
SW7th-Naches.doc/DC
11/3/2014Request for Contract Modification No 3-R, Irrigation Systems\RCNW\PROJECTS\1409 Renton SW 7th St-Naches A storm Sys Impv\Change Order Requests-Force
Accounts\Change Order Request No.4-Power Cabin --st for Contract Modification No.3-Rebuild Irrigation Systemdocx
i oA CoNsTRucwoNNoRJ 17 S7, INC'.
PO Box 188 Renton, Washington 98057-0188 425-254-9999 425-254-1334 fax
March 11, 2014 Via E-Mail
Daniel W. Carey
Surface Water Utility Engineer
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: City of Renton—SW 7"' Street/Naches Avenue SW Storm System Improvements
Subject: Contract Change Order No.4—PSE Power Extension& Install Irrigation Cabinet and
Connect Power
Mr. Carey,
We are pleased to submit the requested contract change order for the complete installation of a new power
system by Puget Sound Energy (PSE)to provide power for the new irrigation controller and irrigation
system. All materials, equipment, and labor are included. Puget Sound Energy costs are preliminary
estimates and may change when the work is ordered from PSE.
The Change Order includes subtasks needed to install the power system. Depending on conditions some
of the subtasks may not be needed. In that case payment for those subtasks would be zero. Payment for
subtasks may be prorated for the actual work needed. The work includes but is not limited to the
following subtasks:
C04A PSE Power Extension—
Signature Landscaping Proposal:
1. Installing a new power transformer and base on the west side of Naches Ave SW (PSE)
Estimates cost:
Signature Landscaping = $8,905.64
Contractor markup 12% = $1,068.68
Total Cost Item No.I = $9,974.32
(425)254-999 phone P.O.Box 188 2500 East Valley Rd,C-3 Renton,WA 98055 (425)254-1334 fax
11/3/2014Request for Contract Modification No.3-F Irrigation Systems.\RCNW\PROJECTS\1409 Renton SW 7th St-Naches P Storm Sys Impv\Change Order Requests-Force
Accounts\Change Order Request No 4-Power Cabir lest for Contract Modification No.3-Rebuild Irrigation System.docx
1 a. If a new handhold is required on the west side of Naches Ave SW (PSE)
Estimates cost:
Signature Landscaping = $8,467.64
Contractor markup 12% = $1,016.12
Total Cost Item No.l =$9,483.76
2. Installing new power lines from the PSE vault on the east side of Naches Ave SW, in the existing
power conduits under Naches Ave SW,to the new transformer on the west side of Naches Ave SW (PSE)
Estimate Cost:
Signature Landscaping = $5,091.00
Contractor markup 12% = $610.92
Total Cost Item No.I =$5,701.92
3. Locating and exposing the existing power conduits on the west side of Naches Ave SW. Verifying that
they are suitable for PSE use. Making any adjustments, or extending the conduits to the new transformer
location,
Estimate Cost:
Signature Landscaping = $4,197.14
Contractor markup 12% = $503.66
Total Cost Item No.I = $4,700.80
4. Installing two bollards in front of the new transformer.
Estimate Cost:
Signature Landscaping = $1,167.27
Contractor markup 12% = $140.07
Total Cost Item No.I =$1,307.34
5. Contractor Supervision, Coordination, and Assistance for PSE & Signature Landscaping.
a. Equipment:
Foreman Truck(40 hr) $51.60 hr * 40 hr = $2,064.00
Markup 21%= $433.44
Total= $2,497.44
b. Labor:
Working Foreman (40 hr) $62.85 hr* 40 hr = $2,514.00
Markup 29%= $729.06
Total = $3,243.06
Total Cost Item No. 5 = $5,740.50
(425)254-999 phone P.O. Box 188 2500 East Valley Rd,C-3 Renton, WA 98055 (425)254-1334 fax
11/3/2014Request for Contract Modification No.3-P I Irrigation Systems.\RCNW\PRO]ECTS\1409 Renton SW 7th St-Naches/ Storm Sys Impv\Change Order Requests-Force
Accounts\Change Order Request No.4-Power Cabi. jest for Contract Modification No.3-Rebuild Irrigation System.docs `"Wo
�o
C04A Total estimates for all C04A subtasks including use tax: $36,908.64
Total Requested Additional Working Days: 15 days
CO-413 Install Irrigation Controller Cabinet and Connect Power Force Account
All work needed to install a new steel cabin and base to house the irrigation controller and PSE power
meter, and to supply power to the irrigation controller from the PSE transformer. All materials,
equipment, and labor are included. Puget Sound Energy costs are preliminary estimates and may change
when the work is ordered from PSE.
The Change Order includes subtasks needed to install the cabinet and connect the power system.
Depending on conditions some of the subtasks may not be needed. In that case payment would be zero for
those subtasks. Payment for subtasks may be prorated for the actual work needed. The work includes but
is not limited to the following subtasks:
1. Provide and install new steel irrigation controller cabinet and concrete base. The cabinet will be
locking, and will include a meter base and viewing window so the PSE power meter can be read.
Estimate Cost:
Signature Landscaping = $2,686.04
Contractor markup 12% =$322.32
Total Cost Item No.l = $3,008.36
2. Connect power to the controller cabinet, including running the power lines from the PSE transformer to
the new controller cabinet. Provide all electrical items needed inside and outside the cabinet including
conduits, electric panel, circuit breakers, outlet to plug controller into, and connections needed for PSE
power meter.
Estimate Cost:
Signature Landscaping = $2,918.18
Contractor markup 12% = $350.18
Total Cost Item No.I = $3,268.36
3. The costs for any State and City applications, permits, and inspections needed to install the new cabinet
and electrical system.
Estimate Cost:
Signature Landscaping = $821.25
Contractor markup 12% =$98.55
Total Cost Item No.l = $919.80
4. Installing the new irrigation controller(clock) in the cabinet and connecting the power and irrigation
system wiring to it. Test and troubleshoot the irrigation system so all water zones, valves, and sprinklers
are connected and functioning correctly.
Estimate Cost:
Signature Landscaping = $750.08
(425)254-999 phone P.O.Box 188 2500 East Valley Rd,C-3 Renton,WA 98055 (425)254-1334 fax
11/3/2014Request for Contract Modification No.3-P Irrigation Systems.\RCNW\PROIECTS\1409 Renton SW 7th St-Naches A Storm Sys Impv\Change Order Requests-Force
Accounts\Change Order Request No.4-Power Cabit 1%1000"'est for Contract Modification No.3-Rebuild Irrigation System.docx
Contractor markup 12% = $90.00
Total Cost Item No.I = $840.08
5. Remove the existing steel service cabinet, remove concrete base, and plug all conduits, if required by
the City.
Estimate Cost:
Signature Landscaping = $1,752.00
Contractor markup 12% = $210.24
Total Cost Item No.I =$1,962.24
CO-413 Total estimates for all CO-413 subtasks including use tax: $9,998.84
Total Requested Additional Working Days: 5 days
TOTAL CHANGE ORDER COST for C04A and 413 = $46,907.48
Additional working days added to the contract for this change order: 20 working days
Should you have any further questions or concerns, please contact me at(425)254-9999.
Regards,
Matthew
lew G. nlgitalty sign dby MatthewG Wages[-
nN.cn=Matthew G.Wages[er,o=0.oad
fonshuctian Northwest,Inc.,ou,
Wagester D201503111154460100
Matthew Wagester
Road Construction Northwest, Inc.
(425)254-999 phone P.O.Box 188 2500 East Valley Rd,C-3 Renton,WA 98055 (425)254-1334 fax
r
a
F
PROGRESSIVE ( RESPECTED I COMMITTED
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG-14-090 SW 7th St./ Naches Ave SW Storm System Improvement Project-
Phase 1
CONTRACTOR: Road Construction Northwest, Inc.
SUMMARY OF PROPOSED CHANGE:
Complete installation of a new power system by Puget Sound Energy (PSE)to provide power for the new
irrigation controller and irrigation system. All materials, equipment, and labor are included. Puget Sound
Energy cost are preliminary estimates and may change when work is ordered from PSE.
The change order includes subtasks needed to install the power system. Depending on conditions some
of the sub tasks may not be needed. In that case payment for those subtasks may be prorated for the
actual work needed. The work includes but not limited to the following subtasks:
1. Installing anew power transformer and base on the west side of Naches Ave SW(PSE)
Estimates cost$8,905.64
1.a If a new handhold is required on the west side of Naches Ave SW(PSE)
Estimates cost$8,467.64
2. Installing new power lines from PSE vault on the east side of Naches Ave SW, in the existing
power conduits under Naches Ave SW,to the new transformer on the west side of Naches Ave SW
(PSE)
Estimates cost$5,091.00
3. Locating and exposing the existing power conduits on the west side of Naches Ave SW. Verify
that they are suitable for PSE use. Make any adjustments, or extending the conduits to the new
transformer location if needed. (Signature LS)
Estimates cost$4,197.14
4. Installing two bollards in front of the new transformer, if required by PSE (Signature LS)
Estimates cost$1,167.27
The cost for this change order are per the attached letter form Road Construction Northwest.The cost
includes sales tax and contractors mark up
C04A Total estimated cost for all C04A subtasks = $27,828.69
CO-413 Install Irrigation Controller Cabinet and Connect Power Force Account
All work needed to install a new steel cabin and base to house the irrigation controller and PSE power
meter, and supply power to the irrigation controller from the PSE transformer. All materials, equipment,
and labor are included. Puget Sound Energy costs are preliminary estimates and may change when the
work is ordered for PSE.
The Change Order includes subtasks needed to install the cabinet and connect the power system.
Depending on conditions some of the subtasks may not be needed. In that case payment would be zero
for those subtasks. Payment for subtasks may be prorated for the actual work needed. The work included
but is not limited to the following subtasks:
1. Provide and install ne%w.,ieel irrigation controller cabinet and co`1'Ilete base. The cabinet will be
locking, and will include a meter base and viewing window so the PSE power meter can be read.
Estimates cost$2,686.04
2. Connect power to the controller cabinet, including running the power lines from the PSE
transformer to the new controller cabinet. Provide all electrical items needed inside and outside
the cabinet including conduits; electric panel, circuit breakers, outlet to plug controller into, and
connections needed for PSE power meter.
Estimates cost$2,918.18
3. The costs for any State and City applications, permits, and inspections needed to install the new
cabinet and electrical system.
Estimates cost$821.25
4. Installing the new irrigation controller(clock) in the cabinet and connecting the power and
irrigation system wiring to it.Test and troubleshoot the irrigation system so all water zones,
valves, and sprinklers are connected and functioning correctly.
Estimates cost$750.08
5. Remove the existing steel service cabinet, remove concrete base, and plug all conduits, if
required by the City.
Estimates cost$1,752.00
The costs for this change order are per the attached letter from Road Construction Northwest. The costs
include sales tax and contractor's mark up.
CO-413 Total estimated costs for all CO-46 subtasks =subtasks $8,927.55
TOTAL CHANGE ORDER COST for CO-4A and 4B = $36,756.24
Working Days
Additional Working Days added to the Contract for this Change Order: 0
ORIGNAbCQNTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT
AMOUNT AMOUNT THIS ORDER TOTAL AFTER
$ $
SIGNATURES:
Contractor: Date:
Project Engineer:
ved By: s« C D"1 Gm vGY Date:
•
I f Q
W I fig E N v
o E
LL- � N
C c
0
I ++,
v c
Cl 00
j I i >CD
a II - � 0
I > J (Cl s o
C). c �
D j Q X �.-� p _ C
U � = 0
Q I / I U) a � > o+
Z f/ N cr >
C)-
— aoi a-
Q
I1 0 0-4-J c
0E � �
If v 0 o 0
o > —� v opo
ry
o
ry ol C) U) Q) -0 C _a
- f E z m °' ° o -0 _a CDo
+' c c U 041
41E s> a c c IO oc c � 0
GO E X00
=� N
- ! --
Z � — ._ Uwe w
t r ' C4
7
S o I (/� I—
s41 /
} C7 J > Fw�
N a
c7 aM M c; o w
- - sr-c __ ci rr C 7 o
- ---'AA 0
fT� L- __
cr7 \ w
LO
77
LL,
-- - 1 A
y
a_�r -OjA
i.
n <s
to o
f /� �
V �lC'
y
.,
W
zl ,
IN
i
X",
+I " Lo
1 _