Loading...
HomeMy WebLinkAboutEX13_M_CastleAdvisoryNotes_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA24-000022 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal p rocess for the land use action. Planning: (Contact: Andrew Van Gordon, 425-430-7286,avangordon@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant will be required to submit a Final Stream Mitigation Report and Maintenance and Monitoring proposal. In addition, the applicant will be required to comply with all the code requirements of RMC 4-3-050 Critical Areas. This includes, but is not limited to, placing the critical area within a Native Growth Protection Easement, providing fencing and signage, and providing the City with a site restoration surety device and, later, a maintenance and monitoring surety device. 6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 7. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 8. This permit shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Yong Qi, 425-430-7439,yqi@rentonwa.gov) 1. See Attached Development Engineering Memo dated January 25, 2024. EXHIBIT 13DocuSign Envelope ID: 770927E7-33D7-4664-84C3-752486BD42F0 ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA24-000022 Building: (Contact: Rob Shuey, 425-430-7290, rshuey@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed as a condition of building permits. DocuSign Envelope ID: 770927E7-33D7-4664-84C3-752486BD42F0 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: January 25, 2024 TO: Andrew Van Gordon, Associate Planner FROM: Yong Qi, Development Engineering SUBJECT: Castle Auto Sale Tenant Improvement 805 SW 10th St LUA24-000022 I have completed the review for the above-referenced proposal located at parcel 2423049025. The following comments are based on the land use application submittal made to the City of Renton by the applicant. EXISTING SITE CONDITIONS The proposed Castle Auto Sale Tenant Improvement project will occupy the existing one-story warehouse for a used automobile sale with four service bays. The existing building was recently used under an emergency use authorization during the Covid-19 pandemic as a testing station. Prior to that, it was used as a vehicle emissions testing station for the Department of Ecology’s Air Quality Program. Water There is an existing 12-inch water main located in SW Grady Way that can deliver a maximum flow capacity of 4,700 GPM (Record Dwg: W-190402). There is an existing 12-inch water main located to the west of the project site that can deliver a maximum flow capacity of 4,700 GPM (Record Dwg: W- 042002). There is an existing 12-inch water main located in SW 10th St that can deliver a maximum flow capacity of 4,700 GPM (Record Dwg: W-02390F). The approximate static water pressure is 75 psi at a ground elevation of 22’. There is an existing 1-1/2” domestic water service and meter serving the existing building (Facility ID No. MTR-016409). Sewer There is an existing 8-inch gravity wastewater main located within SW 10th Street (Record Dwg: S-009107), which discharges to the 108-inch gravity King County Wastewater Main along the north property line within SW 10th Street. There is an existing 6-inch PVC sewer stub and 6-inch PVC side sewer serving the property, which is connected to the existing 8-inch sewer main within SW 10th Street. Storm There are onsite private storm conveyance system surrounding the existing building, which flows to a 42’’ CMP pipe to the south of the existing building flowing west (Record Dwg: R-297803). Streets The proposed development fronts SW Grady Way along the south property line. The SW Grady Way is classified as Principal Arterial Street with an existing right-of-way (ROW) width of approximately 100 feet. The proposed development also fronts SW 10th St along the north property line. The SW 10th St DocuSign Envelope ID: 770927E7-33D7-4664-84C3-752486BD42F0 Castle Auto Sale Tenant Improvements - LUA24-000022 January 25, 2024 Page 2 of 3 is classified as a Commercial-Mixed Use & Industrial Access Street with an existing right-of-way (ROW) width of approximately 69 feet. CODE REQUIREMENTS WATER COMMENTS 1. There is an existing 1.5” domestic water service and meter (Facility ID No. MTR-016409) serving the existing building. a. If the existing a 1 ½” water service is to be used for both irrigation and domestic services, the applicant will be charged for the City of Renton sewer fees along with the King County sewer fees, but would not be charged with the SDC fees associated with water services. A DCVA per City Standard Plan 340.8 is required downstream of the existing water meter, and no deduct meter is allowed. b. If a separate irrigation service line and meter is proposed and connected to the existing 12’’ water main on SW 10th St, a DCVA per City Standard Plan 340.8 behind the meter is required and along with associated SDC fees. 2. If the project proposes to upsize the water meter or additional meters are needed, the development will be subject to applicable water system development charges (SDC’s) and meter installation fees based on the size and number of the new meter. Current fees can be found in the 2024 Development Fees document on the City’s website. a. The current water fee for a single 1-inch meter is $4,850.00 per meter, 1-1/2-inch meter is $24,250.00, and a 2-inch meter is $38,800.00. b. Water Service installation fee is $2,875.00 per 1-inch service line, $4,605.00 per 1-1/2-inch service line, and $4,735.00 per 2-inch service line. c. Drop-in meter fee is $460.00 per meter for a 1-inch meter, $750.00 for a 1-1/2-inch meter, and $950.00 for a 2-inch meter. d. Credit will be applied to the 1.5’’ existing service if abandoned. e. Final determination of applicable fees will be made after the water meter size has been determined. SDC fees are assessed and payable at construction permit issuance. The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=1&repo=CityofRe nton. SEWER COMMENTS 1. The auto sale building floor drains will need to be directed to an oil/water separator system prior to connecting into the City’s Sanitary Sewer system. Installation of an oil/water separator will be required if there is not an existing one. The oil/water separator shall be sized in accordance with standards found in the latest edition of the Unifor Plumbing Code (UPC). The oil/water separator shall drain by gravity to the sewer main and shall be located so that it is accessible for routine owner maintenance. a. There is an existing oil water separator to the north of the existing building. The applicant needs to provide a detailed calculation/analysis to show that the existing oil/water separator meets the current UPC. Otherwise, the applicant needs to upgrade the oil water separator to meet current UPC and provide detailed information of the new oil/water separator installed. 2. Since the existing sewer service will be reused, no sewer system development charges are applicable. If the domestic water meter size is proposed/required to be upsized or additional DocuSign Envelope ID: 770927E7-33D7-4664-84C3-752486BD42F0 Castle Auto Sale Tenant Improvements - LUA24-000022 January 25, 2024 Page 3 of 3 meters are required as a result of the project, applicable SDC fees would be required. Credit would be provided for the existing meter size. a. No SDC fee will be collected since no new or upgraded water meter is installed and the existing sewer service will be reused. SURFACE WATER COMMENTS 1. A drainage report complying with the 2022 Renton Surface Water Design Manual (2022 RSWDM) will be required if construction is proposed exterior to the existing building. Refer to Figure 1.1.2.A – Flow chart to determine the type of drainage review required in the RSWM. a. No drainage review will be required since there is no construction proposed exterior to the existing building. TRANSPORTATION COMMENTS 1. An accessible route of travel meeting American’s With Disabilities Act’s requirements (ADA) from the public right of way to the working facilities is required and will be reviewed in conjunction with the building permit submittal. a. The existing onsite ADA parking and landings will be further reviewed during building permit review. 2. Since this project is proposing an interior remodel and no new construction or additions valued at over $175,000, no street frontage improvements or right of way dedication are required. 3. Sites that generate 20 or more net new peak hour trips (either in the AM peak or PM peak) are required to do a traffic impact analysis. The trips should be calculated based on the guidelines of the current ITE Trip Generation Manual. a. A Trip Generation Analysis Memo (memo) dated October 16, 2023, was prepared by William Popp Associates, LLC. and submitted with the land use application. The memo indicates that the proposed project is anticipated to generate 50 weekday daily trips, net new 3 weekday AM peak hour trips and 19 fewer weekday PM peak hour trips. Therefore, a traffic impact analysis is not required. Staff concurs with the assessment. b. The memo indicates that the transportation impact fee is estimated to be $0 for this development since the proposed new use project trip generation estimate is to 19 fewer weekday PM peak hour trips. Staff concurs with the assessment. GENERAL COMMENTS 1. Fees quoted in this document reflect the fees applicable in the year 2024 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. DocuSign Envelope ID: 770927E7-33D7-4664-84C3-752486BD42F0