Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_20240228DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 29, 2024 PROJECT NAME/NUMBER: PR21-000240 SE 172nd St Water Quality Retrofit Project / LUA24-000064, ECF PROJECT LOCATION: SE 172nd St from 122nd Ave SE to 127th Ave SE; 122nd Ave SE, 123rd Ave SE, 124th Ave SE, and 125th Ave SE from SE 172nd St to SE 169th Pl APPLICANT/PROJECT CONTACT PERSON: Kevin Evans / 1055 S Grady Way Renton, WA 98057 / krevans@rentonwa.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://shorturl.at/wU012 PROJECT DESCRIPTION: The applicant, City of Renton, is requesting Environmental (SEPA) Review to retrofit residential neighborhood streets by installing porous concrete sidewalks, new stormwater pipes and structures, and water quality treatment facilities. The public works project is located along SE 172nd St from 122nd Ave SE to 127th Ave SE (roughly 1,500 linear feet of roadway); along 122nd Ave SE, 123rd Ave SE, 124th Ave SE, and 125th Ave SE from SE 172nd St to SE 169th Pl for approximately half a block (600 linear feet of roadway each street). The project consists of installing new conveyance system and green infrastructure to collect and treat stormwater runoff from approximately 2 acres of pollution-generating hard surface. It is estimated that approximately 6,020 cubic yards (CY) of excava tion and approximately 5,765 CY of fill would be required to complete the project. This project would help restore water quality within the City of Renton and downstream to Soos Creek, the Green River, and Puget Sound. The project area is currently used for residential street traffic in the Benson Community Planning Area, east of Cascade Village. Project construction is estimated to begin on November 1, 2024 and end on October 31, 2025. DATE OF APPLICATION: February 14, 2024 NOTICE OF COMPLETE APPLICATION: February 29, 2024 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Construction Permit REQUESTED STUDIES: Drainage Report, Geotechnical Engineering Report, and Wetland Delineation Report CONSISTENCY OVERVIEW: Zoning/Land Use: The project site is in public right-of-way. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist NOTICE OF APPLICATION Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR21-000240 SE 172nd St Water Quality Retrofit Project / LUA24-000064, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-9-070 Environmental Review Procedures and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing by 5:00 PM on March 14, 2024. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Current Planning Manager; Tel: (425) 430-7289; Email: cclose@rentonwa.gov