Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_240215_v1 Sazei Design Group 16608 110TH AVE. N.E. KIRKLAND, WA. 98033 TEL. (425) 214-2280 FAX. (425) 889-6887 October 24, 2023 City of Renton Planning Department Re: Renton Highlands 6-lot short Plat Construction Mitigation Description: Project Design Team/Contact Sazei Design Group ~ Hamid Korasani 425-214-2280 hamidkorasani@yahoo.com To Whom It May Concern: This project consists of the following tax parcel number: 1123059068. The site addresses for the existing parcel is 5815 NE 8TH ST Renton WA. The property within this application contains 84,070 Sq Ft. The project will consist of construction of a 6-lot short plat with the average lot size of 9,000 sf. The proposed improvements include the six new lots to accommodate the construction of six new homes and parking, half street frontage improvement on Pasco Place NE consisting of curbs, gutters and sidewalks, Side walk improvements along NE 8th street, and a shared driveway with hammerhead turn around to access lots 5&6. Construction will start June 1st of 2024 and last until April of 2025. Construction hours will be Monday through Friday from 8:00am until 5:00 pm. The hauling rout will be to exit the site onto NE 8th street, travel west on NE 8th to 148th Ave SE, travel north on 148th Ave SE to Renton Issaquah Rd SE, and travel east on Renton Issaquah Rd SE to I90. See attached map. The measures to be implemented to minimize dust will be to spray water as needed at work areas during construction. The measures to be implemented to minimize erosion & mud are to flag or fence clearing limits, install catch basin protection if/as needed, grade and install construction entrance, and install silt fence. The measures to mitigate noise and transportation/traffic will be to commence construction during business hours Monday through Friday from 8:00 am until 5:00 pm. No special hours are proposed for construction or hauling. See attached preliminary traffic control plan. SITEHAUL ROUTE