HomeMy WebLinkAboutMap_Sewer_Info_Combined_240215_v11,128 94
City of Renton Print map Template
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
3/11/2022
Legend
64032
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
64
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Labels
Addresses
Parcels
City and County Boundary
<all other values>
Renton
Lift Station
Wastewater Clean Out
Wastewater Manhole
Wastewater Service Connection
Wasterwater Tap
Wastewater Fitting
Wastewater Lateral Line
Casings
Wastewater Pressurized Main
Renton
Private
Wastewater Gravity Main
Renton
Private
KC Metro Manhole
KC Pressurized Main
KC Gravity Main
Adjacent District Structure
Manhole
Cleanout
I0
37)
0IN
CD "ioz
00
z
ry
L'i
0F__
I7_ z
LiJry
LL
0
O c 0
E-4
E.4
GO
rn
444 11
E
PORTION OF THE NW 1/4, SW 1/4 OF SECTION 11, TOWNSHIP 23 N, RANGE 5 EAST, WAY.
0-
F/NF 7th RACE
NE 7th PLACE STA. 23+17.11 (NILE AVE NE)
IS A. 17+41.67 (NE 7th PLACE) WWPE1
LLA ;--3522SSSSAM
SMH 240SS
PLAN
pr
RIM=519.07
IE Qj
IE=511 3 (IN)
PER AV BU IL
A
0
11 ;PY NILE AVE NF NP 7th PLACE
21+71.09 (NILE AVE NE) SAO
It
A 30+00 (NE 7th PLACE)
0CONTRACTORTOVERIFYSTA31+54 58 5.6'RT. ssoINVERTELEVATIONPRIORTO
CONSTRUCTION, NOTIFY "SHALLOW
IM-518.38OFANYDISCREPANCIES09+27w 8(OUT)S\vis c Li 116"
AS-BUILT #S-3522 IE--et21tff: 8
EX. C.O.
RIM=518.85
IE=511.73, 8"
STA. 21+66.0 TILT.
SSMH 1, 48 xxc 32+ow
RIM=&44-6- 5lat.5Z O w - - - - - - - - - -
2TE=54446, 8(OUT)si%.
IE=51 1.86, 8 (IN) 5;t%.Itt — -- — -- B'SS os=0.6
AF26LF, 8" SS O5 =0,549
STA. 30+95.21, 4.7'RT. STA. 21+45.87 7TT SSMH 2, 54 SHALLOW5tiuuffl. wi U RIM=&16,B2
E=54+46, 8"(OUT) E=&;4., 8"(OUT)ETIi--5-1iE=5q2.4 , 8" (IN)
IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS
2
JAI
MEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN.
0
U
60" ALLOWABLE MAX. VITRIFIED CILAY, PLAIN AND REINFORCED CONCRETE, DI PIPE AND C1
Y
FOR CAST IRON PIPE PIPE SEWER MAINS ARE TO BE CORE DRILLED
OR DUCTILE IRON PIPE.
1:3:5 MIX by
z
In
if,,MMKG
PROPERTY LINE
Col _2% MIN SLOPE
2"x 4" STUD SERVICE MARKER PAINT UPPER
6" SIDE OUTLET TEE
U
HORIZONTAL
SEWER MAIN
w
61, MIN. CONCRETE
I0
37)
0 IN
CD "i oz
00
z
ry
L'i
0F__
I7_ z
LiJry
LL
0
O c 0
E-4
E.4
GO
rn
444 11
E
PORTION OF THE NW 1/4, SW 1/4 OF SECTION 11, TOWNSHIP 23 N, RANGE 5 EAST, WAY.
0-
F/NF 7th RACE
NE 7th PLACE STA. 23+17.11 (NILE AVE NE)
IS A. 17+41.67 (NE 7th PLACE) WWPE1
LLA ;--3522SSSSAM
SMH 240SS
PLAN
pr
RIM=519.07
IE Qj
IE=511 3 (IN)
PER AV BU IL
A
0
11 ;PY NILE AVE NF NP 7th PLACE
21+71.09 (NILE AVE NE) SAO
It
A 30+00 (NE 7th PLACE)
0CONTRACTORTOVERIFYSTA31+54 58 5.6'RT. ssoINVERTELEVATIONPRIORTO
CONSTRUCTION, NOTIFY "SHALLOW
IM-518.38OFANYDISCREPANCIES09+27w 8(OUT)S\vis c Li 116"
AS-BUILT #S-3522 IE--et21tff: 8
EX. C.O.
RIM=518.85
IE=511.73, 8"
STA. 21+66.0 TILT.
SSMH 1, 48 xxc 32+ow
RIM=&44-6- 5lat.5Z O w - - - - - - - - - -
2TE=54446, 8(OUT)si%.
IE=51 1.86, 8 (IN) 5;t%.Itt — -- — -- B'SS os=0.6
AF26LF, 8" SS O5 =0,549
STA. 30+95.21, 4.7'RT. STA. 21+45.87 7TT SSMH 2, 54 SHALLOW5tiuuffl. wi U RIM=&16,B2
E=54+46, 8"(OUT) E=&;4., 8"(OUT)ETIi--5-1iE=5q2.4 , 8" (IN)
MAIN TO PROPERTY LINE)
z
1 I
01
vi
6+-,
hf -, ;
till
rdJOe4lb?.9.
p +
2id
OA 5 q"551p
IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS
2
JAI
MEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN.
0
U
60" ALLOWABLE MAX. VITRIFIED CILAY, PLAIN AND REINFORCED CONCRETE, DI PIPE AND C1
Y
FOR CAST IRON PIPE PIPE SEWER MAINS ARE TO BE CORE DRILLED
OR DUCTILE IRON PIPE.
1:3:5 MIX by
z
CONCRETEBLOCKING if,,MMKG
PROPERTY LINE
Col _2% MIN SLOPE
2"x 4" STUD SERVICE MARKER PAINT UPPER
6" SIDE OUTLET TEE
HORIZONTAL
SEWER MAIN
w
61, MIN. CONCRETE
N WHITE AND STENCIL ON FRONT SIDEPWOORRIDNNGVIEWI
ANGIE
TYPICAL ELEVATIONOFTEEATMAINOVER25
WITH 3" HIGH BLACK LETTERS.
x
ELEVATION
SEWER UNN TO PROPERTY
NOTE: ADOPTED
AND #6 "RE MAPPED AROUND THE STUD AND
UNLESS OTHERWISE SHOWN ON PLAN. SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY
LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER
6" BUILDING SEWER PIPE EXTENDED TO THE TOP OF THE STUD.
ii=: 12/96
FUTURE
in 6 Z DWG. NAME. BR39 SP PAGE: 8078
j BUILDING SEWER
TEE WITH 6" SIDE OUTLET 3"x6'X6" WYE WITH A SURFACE
CLEANOUT WITH CAST IRON RING
AND C6" SIDE SEWER AND Pull DING SEWER OVER (SEE DETAIL DING. 403.1)
UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST
MAIN TO PROPERTY LINE)
z
1 I
01
vi
6+-,
hf -, ;
till
rdJO e4lb?.9.
p +
2id
OA 5 q"551p
IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS
2
JAI
MEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN.
0
U
60" ALLOWABLE MAX. VITRIFIED CILAY, PLAIN AND REINFORCED CONCRETE, DI PIPE AND C1
Y
FOR CAST IRON PIPE PIPE SEWER MAINS ARE TO BE CORE DRILLED
OR DUCTILE IRON PIPE.
1:3:5 MIX by
z
CONCRETEBLOCKING if,,MMKG
Col _2% MIN SLOPE
6" SIDE OUTLET TEE
HORIZONTAL
SEWER MAIN
z0 61, MIN. CONCRETE SEWER MAIN
BLOCKING ANGIE
TYPICAL ELEVATIONOFTEEATMAINOVER25SIDESEWER
STANDARD ME SEWER INSTAMATION
x
ELEVATION
SEWER UNN TO PROPERTY
NOTE: ADOPTED
UNLESS OTHERWISE SHOWN ON PLAN. SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY
LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
ii=: 12/96
in 6 Z DWG. NAME. BR39 SP PAGE: 8078
MAIN TO PROPERTY LINE)
z
1 I
01
vi
6+-,
hf -, ;
till
rdJOe4lb?.9.
p +
2id
OA 5q"551p
b - L4
In
2
JAI
C;
0
U
7 I9
I
Y
j 4 DO 31 i1 -OD-;
Nk 7th PLACE 5=252 I;;'--
TA T. s 4
L
RIM= 1 STA. 36+36. }5.ORT.
IE= 8-"(QPT) 5/y 14 §SMH#51 48"1
IE= 8" (]N) -oy . ? ? RIM = 527.26E_ 8(OUT)57.0. Z7
o
NOTE: ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF RENTON
TRENCH RESTORATION AND STREET OVERLAY DETAIL.
PER SECTION 7 REQUIREMENT FOR PATCHING, OVERLAY, AND TRENCH WIDTHS,
1. TRENCHES (ROAD CROSSINGS) d. IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET (S)
NOTE: INSTALL SIDE SEWERS PER DETAIL
LEFT, PVC PIPE, MINIMUM 2% SLOPE (NP.)
CONTRACTOR TO VERIFY - `\
INVERT ELEVATION PRIOR TO
CONSTRUCTION, NOTIFY ENGINEER
OF ANY DISCREPANCIES.
oi 53p c
l
vvoi , 1/. it.
PER AS-BUILT
21
S=3587,03
NOTE
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE
APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND
HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO COMMENCING CONSTRUCTION, NO
REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES
NOT SHOWN IN THEIR PROPER LOCATION.
CALL BEFORE YOU DIG, 1-800-424-5555
STA. 0+14.41 (PASCO PLACE NE)
i vie
tj
t OPEN
A4
7+h PI A
STA. 37+86 5V-1 (E" 7th PLACE)
STA. 1+69.45!(PAMO PLACE
Paw
na,
G,
Q'Ir tl
101.
77
0+24It- S i3
Q S.4' T. `& USSmmb40 oRINI3
E=5*230 8"(OUT)5L-'?4
E-52*49, 8" (114)sza.oz
NPLACNET'
A. 3+3332 (PASCO 1PLACE NE)
In
In 0W
o
z CDW , 2 w2LO 00
Of
wz
0
2
b - L4
In
2
Z 0
U
p I
VMS
u
z
GRAPHIC SCALE
0 20 40 80
L. ..... I .......... I . .... . ..... ..........
I Inch = 40 feet
5 - 3s IF? 0 s
oi
U) j004% 7jf7
P
cn
W
1 1 0 zUU
3 Fz0
UU z
RECOMMENDED FOR APPROVAL 0 lu)
Date DATE 03/25/2011
te!
JOB NO.
e,
DWG NO.
By, Datei
SHEET
Byl DateI 7 OF 9
E
rn <1
p I
VMS
SANITARY SEWER AVAILABILITY CERTIFICATE
6th Floor Customer Service
1055 S Grady Way, Renton, WA 98057 Phone: (425) 430-7200 Fax: (425) 430-7300
Page 1 of 3
SECTION A: TO BE COMPLETED BY THE APPLICANT
DATE: APPLICANT NAME:
PHONE NO: EMAIL:
PROPERTY ADDRESS:
KING COUNTY TAX ACCOUNT NO:
Proposed Use (check one):
☐Proposed Single Family Home
☐Proposed Accessory Dwelling Unit (ADU)
☐Existing Single Family Home on Septic
☐Proposed ______ Lot Short Plat
☐Other (specify) _________________________________
________________________________________________
It is recommended that a proposed site plan/plot plan is included in order to provide a comprehensive response.
SECTION B: CITY SEWER INFORMATION – TO BE COMPLETED BY THE CITY OF RENTON
1.a. ☐ Sanitary Sewer Service will be provided by side sewer connection to an existing inch sewer main
located within
City Records show a side sewer stub to the property ☐ YES ☐ NO
Side Sewer Stub Notes:
OR
b.☐ The proposed project requires improvements to the City’s sanitary sewer system, including, but not
limited to:
☐Extension of approximately linear feet of inch sewer main located in
to service the site; and/or
☐Construction of sanitary sewer mains within the project site; and/or
☐Other:
Note: Any extension of sewer main requires application and issuance of a Civil Construction Permit. All sewer
main extensions shall be designed by a professional engineer licensed in the State of Washington.
2.☐ Reference Data:
3.☐ As a condition of connection, as the subject property is not within the current corporate boundaries of
Renton, the owner must execute a Covenant to Annex to the City.
4.☐ The Renton portion of the Wastewater Utility Rates for customers outside the city limits is 1.5 times the
standard rate for customers inside the city limits. (City Code section 8-5-15C)
5.☐ Applicant shall abandon the existing septic system in accordance with Section 1119 of the current Uniform
Plumbing Code and Section 4-6-040.I.6 of the City Code.
6.☐ The sewer system improvement is in conformance with a County approved sewer comprehensive plan.
OR ☐The sewer system improvement will require an amendment to the Renton Long-Range Wastewater
Management Plan.
7.☐ The sewer system improvement is within the City of Renton or will be within an existing franchise from King
County allowing the installation of facilities in the County Right(s)-of-Way.
OR
☐The sewer system improvement will require that Renton obtain a franchise from King County to install the
facilities in the County Right(s)-of-Way.
8.☐ Additional Information (if applicable):
20222022
Page 2 of 3
SECTION C: PERMIT AND FEE INFORMATION
Fee per
DU4 # DUs Total Fee
1.a. ☐ Payment of all applicable system development, latecomers, and special assessment fees1:
•System Development Charge2 (SDC Fee):$3,500.00 x
•System Development Charge2 (SDC Fee) – ADU3:$1,750.00 x
•Latecomers, special assessment fees:
x
x
x
b.☐ Payment of all applicable permit fees1:
•Residential or Commercial Building Sewer Permits:
o Side Sewer Permit / Building to Property Line:$393.75 x
o Sewer Stub Permit/ Sewer Main to Property Line:$393.75 x
•Right-of-Way Fee (if applicable):
•Right-of-Way Bond (Refundable):
•King County Right-of-Way Permit Fee (if applicable):
Total Fees:
c.☐ Review and approval of a Civil Construction Permit for improvements to the City’s sanitary sewer system,
including payment of all applicable Civil Construction Permit fees. Civil Construction Permit Fees are based on the total cost of construction as outlined in the City’s Current Fee Schedule.
2.☐ Customers making a first-time connection to sanitary sewers in King County, including Renton’s Sewer
Service Area, are subject to a sewage treatment capacity charge. The purpose of this King County charge
is to pay for building sewage treatment capacity to serve newly connected customers.
Effective Jan. 1, 2021, for single family homes the capacity charges will be based on size, meaning small
homes will pay less for the capacity charge and large homes will pay more. The RCE5 assigned to single
family homes is based on size. The RCE charge is on a per month basis, billed by King County every three months, for 15 years. King County will give the customer the option to pay the entire fee to King County,
at a discounted amount on their first invoice.
The capacity charge fee structure is outlined as follows:
House Size/Type RCE
Monthly
Amount
Amount Billed
Quarterly by
King County
15-Year Total Amount
to King County
Less than 1,500 SF 0.81 $ 57.02 $ 171.06 $ 10,263.60
1,500-2,999 SF 1.00 $ 70.39 $ 211.17 $ 12,670.20
Greater than 3,000 SF 1.16 $ 81.65 $ 244.95 $ 14,697.00
This fee is in addition to the monthly charge for treatment that Renton is required to collect and pass to
King County. Fees are subject to change without notice. See www.kingcounty.gov/capacitycharge for more
information.
1.All fees are quoted based on the fees in effect as of the date of this certification. Fees are subject to change without notice. All fees are assessed basedon the fee schedule that is current at the time of permit issuance.
2.SDC Fees are based on the size of the domestic water meter servicing the building. The fees quoted are for up to a 1-inch domestic water meter. Fees
for larger meters are available upon request or can found in the City’s Current Fee Schedule. See rentonwa.gov for the current fee schedule.
3.Per Resolution 4422, SCD Fees for Accessory Dwelling Units are assessed at 50% of the Single-Family Rate through 2022.4.DU is defined as a Dwelling Unit, and includes Single Family Homes, Accessory Dwelling Units and/or Duplexes.5.RCE is defined by King County as a Residential Customer Equivalent and is assigned to single family homes based on the size of the home.
ADU 0.59 $ 41.53 $ 124.59 $ 7,475.40
Page 3 of 3
SECTION D: CONDITIONS OF CERTIFICATION
1.It is the responsibility of the owner/developer to verify, by an engineering study, whether it is possible to
connect by gravity line to the existing City sewer system (a private lift station may be installed, but is not
desirable). The City may require, at its option, the verification to be in the form of a letter signed by a
professional civil engineer.
2.The City does not guarantee that a stub exists for all properties nor does it guarantee the condition or location
of the stub.
It is the responsibility of the owner/contractor to have an approved connection from the building sewer to the
City's sewer main. If there is a PVC stub, it is in good condition, and the owner/contractor can locate it, then it
is available for use. If the existing stub is concrete or clay, the stub shall be lined or replaced with PVC. A
Closed Circuit Television (CCTV) inspection shall be performed on the existing stub to determine if it can be lined. The determination of the condition of the existing sanitary sewer stubs shall be the sole
responsibility of the City and the City's decision shall be final.
If the stub is broken or the City determines that the stub's condition is not acceptable, it shall be the owner/
contractor's responsibility to repair the stub, replace the stub at the existing tee, or to install a new
stub and tee directly into the main. The method of repair/replacement to be determined by the
City.
I hereby certify that the above sanitary sewer information is true. This certification shall be valid for the calendar-year
that it was created.
CITY OF RENTON - WASTEWATER UTILITY CERTIFICATION