HomeMy WebLinkAboutChange Order - 13DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 Contract Title: Change Order No. 13 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No. : CAG-22-163 Federal Aid No. : STPUL-1615(005) � Ordered by Engineer □Proposed by the Contractor (VECP)□Unilateral Original Contract: Current Contract: Estimated Net Change This Order: New Contract: By"'- �LumpSum 181 Bid Item □Force Account Amount $28,284,174.90 $29,143,776.79 $38,871.68 $29,182,648.47 Working Days 500 538 0 538 Date City of Renton Transportation Reviewed By: �� gineef '6f Record "' Reviewed By: 1/29/2024 Date Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: Date 1/30/2024 B • 11 Ad Digitally signed by Bill Adams I ams Date: 2024.02.05 16:46:58-08'00' 2/5/2024 Reviewed By: City Attorney Change Order No. Contract Title: Contract No. r ject Manager Date Contractor �•av: M�i���Q�:stucha Date City of Renton Public Works Administrator/ Mayor 13 Rainier Ave S Corridor Improvements -Phase 4 CAG-22-163 Date 3/4/2024 I 3:45 PM PST Date Page 1 of 13 CAG-22-163, CO #13-24 Approved by Cheryl Beyer via email 2/6/2024 DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The Contractor is directed to install the revised cathodic protection as detailed in the revised diagram for the cathodic protection and the revised cathodic protection standard plans which are attached to this Change Order. The proposal is revised as follows: 13-A14 -Flaggers, 65 Hours @ $70.20/Hour = $4,563.00 13-A15 -Other Traffic Control Labor, 30 Hours @ $71.60/Hour = $2,148.00 13-A34 -Temporary Pavement, 10 Tons @ $235.00/Ton = $2,350.00 13-Bl0 -Bank Run Gravel Borrow for Trench Backfill Water Main, 80 Ton, $20.15/Ton, $1,612.00 13-B17 -Corrosion Protection, Pipe Joint-Bonding, Test Stations, -1 LS @ $13,680.00/LS = -$13,680.00 13-B32 -Naturally Occurring Pipe Zone Bedding for the Water Main, 55 Ton @ $20.80/Ton = $1,144.00 13-B33 -Corrosion Protection, Pipe Joint Bonding, Test Stations, 1 LS, $38,000.00/LS, $38,000.00 SP 7-11.3(3) paragraphs 1. 2. 3. and 4 are deleted in their entirety. SP 7-11.3(5) paragraphs 1. 2. 3, and 4 are deleted in their entirety. SP 7-11.3(6) paragraphs 1. 2. and 3 are deleted in their entirety. Reason for Change: 13-B17-Corrosion Protection, Pipe Joint-Bonding, Test Stations 13-B33 -Corrosion Protection, Pipe Joint Bonding, Test Stations The Plans required the Contractor to install two Type FF test stations and to install Cathodic Protection per the City of Renton Standard Plan CP. This required the Contractor to excavate to the Seattle Public Utilities pipelines and to the locations of the Cathodic Protection Test Stations. The specifications also required the Contractor to coordinate with SPU for SPU to perform the welds to the SPU pipelines. SPU told the City of Renton Water Department that they would not perform this work. Change Order No. Contract Title: 13 Rainier Ave S Corridor Improvements -Phase 4 Contract No. CAG-22-163 Page 2 of 13 DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 The City of Renton Water Department determined that revisions to the City of Renton Standard Plan CP were needed in order to construct a functional version of the Cathodic Protection as shown in the plans. After receiving the revised plans which accurately represented the desired Cathodic Protection, the Contractor proposed pricing to install the revised Cathodic Protection and to complete the work in coordination with the City of Renton Water Department instead of SPU for the welds to the SPU transmission lines. This pricing was not acceptable to the City of Renton Water Department. Therefore, the City of Renton Water Department revised the Cathodic Protection to a pared down version which did not require excavation down to the SPU transmission lines. Affects DBE Work: □Yes IZI No Materials: None. Plans: Revised Cathodic Protection Plans. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. 13-B33 -Corrosion Protection, Pipe Joint Bonding, Test Stations An independent estimate was prepared for the cost to compensate the Contractor for the work to perform the revised cathodic protection as described in this change order and after the water main was installed. This was calculated to be $42,000.00. Based on this calculation the Contractors quote of $24,251.44+$13,680.00=$37,931.44 was accepted and rounded to $38,000.00. Extension of Time: The Time for Completion is extended _O_ Working Days. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT / APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: Change Order No. Contract Title: Contract No. 13 Rainier Ave S Corridor Improvements -Phase 4 CAG-22-163 Page 3 of 13 DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 □Estimated Change Order Cost □Plans □Field Directive/Request for Information Response/Serial Letter □Change Order Quotation □Project Labor List □Force Account Equipment Rate Request (DOT Form 422-010 EF) □Overhead Adjustment Determination Change Order No. Contract Title: Contract No. 13 Rainier Ave S Corridor Improvements -Phase 4 CAG-22-163 Page 4 of 13 Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: Federal Aid No: Construction Manager: Item No. Rainier Ave S Corridor Improvements -Phase 4 Pivetta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) Perteet Description Quantity Engineers Estimate 13-B33 Labor -Pivetta (Foreman) 13-B33 Labor -Pivetta (Operator) 13-B33 Labor -Pivetta (Laborer) 13-B33 Labor -Pivetta (Traffic Control Supervisor) 13-B33 Labor -Pivetta (Project Engineer) -Gathered Materials 13-B33 Labor -Pivetta (Superintendent) -Gathered Materials 13-B33 Labor Markup 13-B33 Equipment -Pivetta (Excavator) 13-B33 Equipment-Pivetta (Loader) 13-B33 Equipment -Pivetta (Flatbed Trucks) 13-B33 Equipment-Pivetta (Vacuum Trailer) 13-B33 Equipment -Pivetta (Arrow Board) 13-B33 Equipment-Pivetta (Dump Truck) 13-B33 Equipment Markup 13-B33 Materials -Pivetta (FF Test Station) 13-B33 Materials -Pivetta (20 LB Magnesium Anode) 13-B33 Materials -Pivetta (Thermite Shot for Ductile Iron Pipe) 13-B33 Materials -Pivetta (IP Handy Caps) 13-B33 Materials -Pivetta (#12 RHW Blue Stranded Wire) 13-B33 Materials -Pivetta (#8 RHW Blue Stranded Wire) 13-B33 Materials -Pivetta (#12 RHW Black) 13-B33 Materials -Pivetta (#8 RHW Black) 13-B33 Materials -Pivetta (Isolation Sleeves) 13-B33 Materials -Pivetta (Mater Main Bedding) 13-B33 Materials -Pivetta (Shipping) 13-B33 Materials Markup 13-B33 Services -Pivetta (Asphalt Disposal) 13-B33 Services -Norton Corrosion (Testing of System and Documentation) 13-B33 Services Markup 13-B33 Subcontractor 13-B33 13-B33 Item Change 13-A14 Flaggers 13-A15 Other Traffic Control Labor 13-A34 Temporary Pavement 13-BlO Bank Run Gravel Borrow for Trench Backfill Water Main 13-B17 Corrosion Protection, Pipe Joint-Bonding, Anodes, Test Stations 13-B32 Naturally Occurring Pipe Zone Bedding for the Water Main 15-B33 Corrosion Protection, Pipe Joint-Bonding, Anodes, Test Stations Per attached determination Estimated Change Order Cost (Schedule A) Estimated Change Order Cost (Schedule B) Estimated Sales Tax Cost (Schedule B) Estimated Change Order Cost Summary of Contractors Quotes: Item Quote Location 13-B33 SL014R1 $ Total Quoted Added Cost: $ Quoted Cost 37,931.44 37,931.44 Overhead 32 56 64 8 12 4 $14,188.00 25 25 76 10 90 2 $9,335.50 2 5 25 25 120 120 120 120 2 10 1 $7,685.65 9 8 $1,773.97 65 30 10 80 -1 55 1 Change Order No. 13 Unit Hours Hours Hours Hours Hours Hours Cents/Dollar Hours Hours Hours Hours Hours Hours Cents/Dollar EA EA EA EA FT FT FT FT EA CY LS Cents/Dollar Tons Hours Cents/Dollar Estimate By: Jordan Howe Date: 1/18/2024 Unit Price $ 97.00 $ 95.00 $ 64.00 $ 64.00 $ 64.00 $ 97.00 $ 0.31 $ 122.00 $ 89.00 $ 38.00 $ 37.00 $ 7.25 $ 75.00 $ 0.21 $ 300.00 $ 500.00 $ 6.32 $ 9.67 $ 0.87 $ 2.47 $ 0.87 $ 2.47 $ 1,300.00 $ 28.43 $ 500.00 $ 0.21 $ 19.33 $ 200.00 $ 0.21 CAL CU LA TED TOT AL: ESTIMATED TOTAL: Hour $ 70.20 Hour $ 71.60 Ton $ 235.00 Ton $ 20.15 $ $ $ $ LS $ 13,680.00 $ Ton $ 20.80 $ LS $ 38,000.00 $ Schedule A TOTAL Schedule B TOTAL By Agreement Estimated Cost $3,104.00 $5,320.00 $4,096.00 $512.00 $768.00 $388.00 $4,398.28 $3,050.00 $2,225.00 $2,888.00 $370.00 $652.50 $150.00 $1,960.46 $600.00 $2,500.00 $158.00 $241.75 $104.40 $296.40 $104.40 $296.40 $2,600.00 $284.30 $500.00 $1,613.99 $173.97 $1,600.00 $372.53 $0.00 $41,328.38 $42,000.00 4,563.00 2,148.00 2,350.00 1,612.00 (13,680.00) 1,144.00 38,000.00 $9,061.00 $27,076.00 $0.00 $9,061.00 $27,076.00 $2,734.68 $38,871.68 DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 I Revised Cathodic Protectio n -Plans I HAINltH A Vt S & S 2nd St Area of Cathodic Protection Goin t -bonded pipes and anodes- Approx.82 FT) INSULATING SLEEVE PER DETAIL 5/CP1 (1)-#8 AND (1)-#12 AWG COPPER WIRE WITH BLACK TW INSULATION TO EACH TEST STATION (1)-#8 AND (1)-#12 AWG COPPER WIRE WITH BLUE TWIN SULA TION TO EACH TEST STATION SPU Water----+ Pipeli nes Pip e Jo int-Bonding per detai l 7CP1 (typical) ]MMl���.-..-..�-...---'.-.���-P-+---'������ I�-------1 I Magnesium Anode pe r detail 1/CP1 (1)for each pipe section - not to exceed 20 ft apart (2)TYPE F1 TEST STATIONS PER DETAIL 3/CP1 Romac IC501 Insulation Sleeve Sta 19+32.0 , 24.4'Rt I -Insulation Sleeves is to be installed before the 12" Va lves and bonded per detail 5/C P 1 -5 Anodes installed per d etail 1/CP1every 20' be twee n sleeves -Pipes bonded per d etail 7/CP1, (Approx. 5) between sle e ves REVISED BY ABDOUL GAFOUR WATER UTILITY ENGINEER/NG 11/14/23 I Chang e Order #13 -Pag e 6 of 13 I DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 I t1:evIsea 1.,amoaic t'rmecuon -t'Ians I REVISED BY r.:i5a:i:i:i:i:i::i:i:i:i:i a:i:i:i:E::::i:::::c::::ii:::::c::::ia:::i:��----A8DOULGAFOUR MAGNESIUM ANOOE ELEVATION ANODE INSTALLATION @CP1 #12 AND #8 BLUE #14 YELLOW / 1'-6" SQUARE CONCRETE SLAB, 6" TI-HCK Need (2) of Type F1 Test Stations TYPE Fl - FLUSH MOUNTED TEST STATION WATER UTILITY ENGINEERING 11/14/23 LU THERMITE WELD WIRE V CONNECTION, TYPICAL EXISTING SPU WA l£R LINE: CRPL#1 66" STm. --CRPLf2 51.5" STm. CRPLfJ 66" STm. DELETED IN.AL BOARD E9 ANO 1-112 AWG WIRE 'MTH 1W INSULATION T't'PE FF C FLU91 I MOUPHED TE9T 9TATlot� @ ,--------------, 1 anode for each pipe section not to exceed 20 ft per section Need 5 of these ( 1 every 20' for 82') #12 AND #8 BLACK 2 o�0 0 5 6 CONDUCTOR TERMINATIONS STD. PLAN -CP _I PUBLIC WORKS DEPARTMENT CATHOTIC PROTECTION - 1 WATER UTILITY agafour 07/14/2022 e I Change Order #13 -Page 7 of 13 I DocuSign Envelope ID: 81A17543-DBF3-4B40-883D-390828A80001 I Revised Cathodic Protection -Plans I 110 AWG INSULAlED S1R�D£0 COf'!'ER l'IIRE 1HERMl1E 'IIELD 'MRE CONNECTION, TYP E:9 PR01EC1ll) PIPE UNPR01EC1ll) P!PE INSULATING FLEXIBLE COUPLING f2 AWG ..ONT BONO CABLE MECHANICAL JOINT BOND CONNECTION 12 AWG INSULATED Sl!WID£D COf'!'ER 'MRE [D lHERMITE WELD WRE V CONNEC110N, TYP PUSH ON AND FLANGED JO PUBLIC WORKS DEPARTMENT lHERMITE 'IIELD, TYP l'lllH lHERMITE WELD ON> OF MASTIC TAPE COA'IIIG E:9 Need 2 of these for v the isolation sleeves lHERMITE MlD � �:O�o � STN!lWGPC'MlER IETN.. POWDER METAL DISC COPPER SLEEVE • • METAL SURFACE Need 31 of these 21 S1EPS< 1. a.EAN AND ALE PIPE 10 IRQfT METAL 2. STRF INSULAllON FRail NRE SUFFICEHT TO a.EAR WElD Ma.D. INSTALL C0PPER SLEE'JE AS REQUIRED. J. HOLD MOLD ARII.Y 'MlH OPENING AWAY FRC1i1 Cf'ERATCR. lGNITE PO'MlER. 4. REMOVE SLAG FROM c::cHECllON, lEST Y1B.D WllH SHARP HAMMER Bl.OW. S. CXMR EXPOSED METAlS AS REQUIRED NOTES: 1. AU. BON)ING AND TEST LEAD CCJNNEC'IK»'S SHALL BE cot.Fl.£lED USINQ 11£ lHERMITE WEl.l) PROCESS. EXOTHERMIC WELD PROCEDURE@ CP1 Need 6 of these for •ints STD. PLAN -CP WATERUTILITY e agafour 07/14/2022 I Change Order #13 -Page 8 of 13 I