Loading...
HomeMy WebLinkAboutAdden 1CHANGE ORDER CITY OF RENTON OWNER City of Renton CONTRACTOR Mr. Irrigation Project Name Liberty Park Skate Park revisions Project Address 1101 N. Bronson Way Renton, WA 98055 Date 3 -Jun -03 Change order No.: 1 Contractor Name: T.F. Sahli Construction & Address P.O. Box 3322 Seahurst, WA 98062 The Contract is hereby amended as follows: Installation of five (5) benches, provided by the City of Renton Subtotal Washington State Sales Tax at 8.8% City CAG No.: CAG -03 -002 Contract For: 316 .000000.020.5940.0076.63.020049 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER ........................... Add Add $300.00 $300.00 $26.40 $326.40 The change order shall include all Contractor(s) labor, material, overhead, profit, and all direct and /or indirect costs allocated with the Change in Scope of Work. Excluding Bond Premiums. This Change Order is not valid unless signed by the Owner and Contractor The original Contract Sum was ...................................................... ............................... $59,825.00 Net Change by previously authorized Change Order(s) was .............. ............................... $0.00 The Contract Sum prior to this Change Order was ............................ ............................... $59,825.00 The Contract Sum will be revised by this Change Order in the amount of .......................... $326.40 The new Contract Sum incorporating this Change Order will be ......... ............................... $60,151.40 The Contract Time will be changed by ........................................... ............................... 0 days The Substantial Completion Date including this Change Order is ....... ............................... NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by Construction Change Directive or Field Directive forms. RYIX7 ?:a City of Renton Community Services Dept. 1055 South Grady way Renton, Washington 98055 2003 -119aa CONTRACTOR /` _ � ' T. F. Sahli Construction �a/� -�" P.O. Box 3322 Seahurst, WA 98062 A/ //O 9� Date r OMEMORANDU00 Q�4 a�- r{L CITY OF RENTON COMMUNITY SERVICES 0 Committed to Enriching Lives 0 TO: Tom Sahli FROM: Bill Rasmussen SUBJECT: Request for Price to Install 5 benches at the Liberty Park, Skate Park Date 5 -15 -03 I am requesting the cost to install 5 permanent benches on the existing concrete area that your company has poured. We have discussed the location for installation. The benches have been purchased by the City of Renton and will be transported to the site from our shop at your request. Attached is the bench cut to be installed. Cost to install Tax Total Cost Date l�, 2pp�n 3 Signature /)a�,L 1 1 C2