HomeMy WebLinkAboutAdden 3CHANGE
ORDER 07/23/0
Acctg PM
PROJECT: Renton Pavilion
233 Burnett Avenue South
Renton, WA 98055
TO (Contractor) :
EDIFICE CONSTRUCTION CO., INC.
1417 -31ST AVENUE SOUTH
SEATTLE, WA 98144
The Contract is changed as follows:
Distribution to: 4-03 -005 Adden //3 -03
Owner X Field
Architect X File
Contractor X Accounting
CHANGE ORDER NO.: 3
DATE: 7/23/03
EDIFICE PROJECT NO.: 3107
CONTRACT DATE: 4/22/03
CONTRACT FOR: Renton Pavilion
1. Change Proposal #7 (Sprinkler Density and Dry System at overhangs)
TOTAL THIS CHANGE ORDER
Not valid until signed by the Owner, Architect and Contractor.
$29,502.93
29,502.93
X
X
X
The original Contract Sum was $ 2,242,077.91
Net change by previously authorized Change Orders $ 16,272.76
The Contract Sum prior to this Change Order was $ 2,258,350.67
The Contract Sum will be increased
by this Change Order in the amount of $ 29,502.93
The new Contract Sum including this Change Order will be $ 2,287,853.60
The Contract Time will be increased by 0 days.
The Date of Substantial Completion as of the date of this Change Order therefore is 10/1/03.
NOTE: The compensation allowed by this Change Order reflects only the direct cost of the changed work described above.
It does not include any amounts for changes in the sequence of the work, delays, acceleration or impact costs. Edifice
Construction Co., Inc. reserves the right to request compensation for any and all of these and related items of cost prior to any
final payment of this contract.
ARCHITECT:
Mithun Architects
1201 Alaskan Way, Suite 200
Seattle. WA 98101
LI-M
Date \77 / 2�
CONTRACTOR:
Edifice Construction Co., Inc.
1417 -31 st Avenue South
Seattle WA 98144
Date /d3
c:Vprojech2003projectW107 - renton pavilionlcontract\co-ovmar #3 7- 23 -03.doc
OWNER:
City of Renton
1055 South Grady Way
Renton A 98055
By
Date 'I- 30- x.003
Bonnie I. Walton, City Clerk
d
m
u�
(O
N
N
0
0
N
N
to
F
90J
0
0
00-0090
0
O
0
0
0
O
0
O
0
O
0
000
0
0
0
O
0
Q
0
0
0
0
0
0
00
0
0
0
0
O
O
N
N
N
1°
l'7
'T
If)
p
M
N
00
ap
O
t0
N
00
O
co
f-
co)
0
0
.40,000
0
00
0
0
0
0
0
0
go
0
0
0
O
1�
N
f0
O
A
aD
N
to
(D
N
r
v
00
0
Co
N
Co
O
H
M
N
a0
Of
N
N
M
A
Of
00
00
T.
nV
tG
(O
0
^
a0
N
M
O
ul
W
N
N
N
N
N
Cl)
ce
r
N
N
—
N
w..
N
H
N
W
N
W
N
f/►
N
W
O)
N
O
O
�
w
W
H
O
�
U-
0
o
m
0
a
c
M
o
U
w
z
Z
c
0
$
►-
J
0)
O
O
O
O
0
Z
x
C
off
(�
m
O
O
Of
O
(+)
O
o
W
y
T
(V
N
a
F
J
ui
U
Z
N CD
O
O
U
J
c
w
Q
0
w
> a
t
o
w
m
N
i
h
J
2
J
W
Q
°
(xp
W
O
O
H
po
m
01
-J
O
-
e
(°
9
0
a
0
g
w
w
o�v��
m
w�
�-0
m
y
m
�
o
aov>
C
c
15
JgZFO
-1
g0
U
Z
v
co
U)
OR
�J
10�
m
�'
z
iA
c
�Q�O0
C72(nw
2
2
U)
:3
U)
m
m
I
1
10
O
06
m
O
m
UO
v
v
O
o
co
c 0
O ti•
m
N
N
>
a ^o
0
°
c
C
m°
X
0
0
0
0
p
J
a
Cl)
« a
yr
U)
y
%
w
a cc
a
c
o
O
co
m a
a
o;
o 0
w(°rn000
o)0o
O
Oi
O
Z
m 3
L..
to 1O CL
A 0f E
a
O
•-
7
N
N
O
M
>. m
W 01
V
O
O
0
O
O
(°
O
O N
.2
(D
N
'a
0i
V
N
0i
N N
e!
j N
� ,
~
C m
r O
; ° O7
_
N rn
O «
C C
N N c
L
10 O t
Y ;
° v 3
O
0 N
C
m
W
Z
LU
N
N
LL 4)
D
y m
C _
W
F
C >
Of N
n 0 0
U
Z! E
a 3 .0 0
W
o
D
a C
o
L
vi m E i
07/0912003 11:36 2538567075 OLSEN FIRE PROT -WA PAGE 03/03
July 9, 2003
Edifice Construction
141731st Ave S
Seattle WA 98144
Fax: 425 204 6829
Telephone:
Attention: Boyd McPherson
Reference: Renton Pavilion 0
OFP Job # Swo2980 Change Order Request # 2
Gentlemen: The following is our additional cost for:
Dry system required for canopies over 4' per Corey Thomas, Renton Fire
Field Labor
66
hours Q
$
62.65
Design
24
hours @
$
55.00
Project Manager
0
hours (La
$
55.00
Fabrication
0
hours @
$
36.00
Shop Delivery
hours @
$
36.00
Material
_
$ 2,440.00
Service Truck
66
hours @
$
10.89
Lift /Rental Equipment
0
$
-
Cutting /Coring
0
$
-
"no taxes included
$ 4,134.90
$ 1,320.00
S -
$ 2,440.00
$ 718.74
Subtotal S 8,613.64
Overhead 15% $ 1,292.05
Subtotal S 9,
Profit 0% $ -
GRAND TOTAL $ 9,906
Upon acceptance, please sign in the space provided below. If there is any questions, please call.
Expect The Best
(Accepted By)
KyleBarrow (Date)
Olsen Fire Protection Northwest, Inc.
0710912003 11:36 2538567075
July 9, 2003
Edifice Construction
1417 31 st Ave S
Seattle
Fax: 425 204 8829
Telephone:
Attention: Boyd McPherson .
Reference: Renton Pavilion
WA 98144.
OLSEN FIRE PROT -WA
4
0
OFP Job # Swo2980 Change Order Request*
1
Gentlemen: The following Is our additional cost for.
Density Revisions required per Corey Thomas, Renton Fire Department - this change
addled 30 more heads and 10 more lines, also an Increase in pipe
size and the need for
special ordinary hazard rated dry sidewalls for sun canopy
Field Labor 58 . hours @ $ 62.65
S 3,633.70
Design 24 hours @ $ 55.00
$ 1,320.00
Project Managerhours @ $ 55.00
$ -
Fabrication _ hours @ $ 36.00
Shop Delivery _ hours @ S 36.00
Material _ $2,635-50
$ 2,635.50
Service Truck 58 hours $ 10.89
$ 631.62
Lift/Rental Equipment 1 $ 200.00
$ 200.00
Cutting /Coring 0 $ -
$ -
Subtotal
S 8,420.82
Overhead 15°/6
S 1,263.12
Subtotal
S 9,683.94
Profit 0 °/6
$ -
*no taxes included GRAND TOTAL
5 9,684
Upon acceptance, please sign in the space provided below. If there is any questions, please call.
Expect The Best
Kyle Barrow
Olsen Fire Protection Northwest, Inc.
(Accepted By)
(Date)
PAGE 02/03
07/09/2003 11:36 2538567075 OLSEN FIRE PROT -WA PACE 01/03
OLSEN FIRE PROTECTION, INC.
4302 B STREET NW, SUITE- E • AUBURN WA 98001 • PHONE: 253 856 -1515 • FAX: 253 856 -7075
WACLOL SIOMMM
FACSIMILE TRANSMITTAL SHEET
To: Boyd
FROM: Kyle Barrow
COMPANY: Edifice Construction
DATE: Wednesday, July 09, 2003
FAx NUMBER: (425 ) 2048829
j TOTAL NUMBER OF PAGES INCLUDING COVER: 3
PHONE NUMBER:
SENDER'S REFERENCE NUMBER:
SUBJECT: Density C/O & Dry System C/O
REFERENCE: Renton Pavilion
DURGENT ❑FOR REVIEW OPLEASE COMMENT L PLEASE REPLY 71PER YOUR REQI;EST
NOTESICOMMENTS.
Boyd:
Here are the two change orders on the Renton Pavilion.
The density revision change order was based on a bid density of Light Hazard (.10) to a revised density re-
quested by Corey Thomas, Renton Fire, of Ordinary Hazard II (.20). This density lowers the allowable
square footage per sprinkler head. For this reason, we had to add 10 more lines and 30 more heads in addi-
tion to the increased density, in addition to increase pipe size.
The dry system change order is a result of Corey Thomas's request to cover the overhangs over 4'.
Here are some pro and cons of a dry vs. antifreeze system for your information.
Dry-
Pros— Little maintenance once system is installed, requires winterization and annual testing
Cons— Possibility of false trip
Antifreeze -
Pros— No false trips
Cons— State and water dept. require a Reduced Principle Double Check Valve Assembly, this
installation would require two separate systems, cost more to install and preventative
maintenance, annual test requires concentration test.
- ROM for these antifreeze systems are $11,000.
Expect The Best!
Olsen Fire Protection Northwest, Inc.
Kyle Barrow
tele 253 856 -1515 ext. 102
fax 253 856 -7075
cell 253 335 -3610
email kyleb(@olsenfp.com
OLSEN FIRE PROTFCTION, INC. "ESTABLISHED 1981"
NOW SERVING THE GREATER PUGET SOUND AREA
EXPrCT THE BEST