Loading...
HomeMy WebLinkAboutR-410910`P01. c9� J � ' 9'517� 2 ADS CULVERT ITV Ff 443.96 m 9'Lt- Z 6'. �Pl `nIQ. Z' 6- O �PlA Yro).. 0-. Z Z O cQ 31321O1v�0 (P.`o �l �� �� �'. �� s d01 `A� �p�v d01 S•cA. �.sS�. �S S' l3A V��10 O S' 31 V0l�, !��ls 05 17 N"A l57I 2 1517 d01 2'ZSt 909: O C__ 4.2.2 OUTFALL SYSTF-IVS 468.00 2. Solid wall HDPE tightlines must be designed to address the material limitations, particularly thermal expansion and contraction and pressure design, as specified by the manufacturer. The coefficient of thermal expansion and contraction for solid wall HDPE is on the order of 0.001 inch per foot per Fahrenheit degree. Sliding sleeve connections shall be used to address this thermal expansion and contraction. These sleeve connections consist of a section of the appropriate length of the next larger size diameter of pipe into which the outfall pipe is fitted. These sleeve connections must be located as close to the discharge end of the outfall system as is practical. 3. Solid wall HDPE tightlines shall be designed and sized using the applicable design criteria and methods of analysis specified for pipe systems in Section 4.2.1. 4. Due to the ability of solid wall HDPE tightlines to transmit flows of very high energy, special consideration for energy dissipation must be made. A schematic representation of a "gabion mattress energy dissipater" has been provided as Figtire 4.2.2.D . Flows of very high energy will require a specifically engineered energy dissipater structure, as described above in General Criterion #3. Caution, the in -stream sample gabion mattress energtl dissipater ma , not be acceptable within the ordinary high water mark offish -bearing waters or wheregabions will be subject to abrasion front upstream channel sediments. A four-sided gabion basket located outside the ordinary high water mark should be considered for these applications. TABLE 4.2.2.A ROCK PROTECTION AT OICTFALLS Discharge Velocity at Design Flow (fps) REQUIRED PROTECTION Greater Less than Minimum Dimensionsil1 Type Thickness Width Length Height than or equal to C 5 Rock 1 foot Diameter 8 feet Crown lining12) + 6 feet or + 1 foot 4 x diameter, whichever is reater _ 10 Riprap"' 2feet Diameter 12 feet Crown + 6 feet or + 1 foot or 4 x diameter, 3 x diameter. whichever is n,hichever is greater greater 10 20 Gabion As required As required As required Cro. r outfall ?0 N/A Engineered energy dissipater required (1) These sizes assume that erosion is dominated by outfall energy. In many cases sizing ..ill be governed by conditions I - the receiving waters. (2r Rock lining shall be quarry spalls with gradation as follows: Passing 8-Inch square sieve: 100% Passing 3-inch square sieve: 40 to 60% maximum Passing 314-inch square sleve: 0 to 10% maximum (3) Riprap shall be reasonably well graded with gradation as follows: Maximum stone size: 24 inches (nominal diameter) Median stone size: 16 inches Minimum stone size: 4 inches I•lote: Riprap sizing governed by side slopes on outlet channel is assumed to be approximately 1 f. _-017 City of Renton Surface Rater Desiar'_ Ianual 466.00 464.00 GS:Y►AtoP7 460.00 458.00 456.00 454.00 452.00 1 _'/12 20 t 6 450.00 4-31 448.00 LEGAL DESCRIPTION THE NORTH 2 z ACRES OF THE SOUTH EAST QUARTER OF THE SOUTHEAST QUARTER OF NORTHWEST QUARTER IN SECTION 5, TOWNSHIP 22 NORTH, RANGE 5 EAST 5 EAST, W.M IN KING COUNTY WASHINGTON. acy90M1a=1111iMi a19aas•1:a 11111110 _116YiM*:{y11jaIa=0[eP.kwe] =ri4_VM0il a[oI0117I_\V/III111a&Yi11II71�_,611= AND ALSO EXCEPT THAT PORTION THERE OF CONVEYED TO THE STATE OF WASHINGTON FOR STATE ROUTE 515 BY DEED RECORDED UNDER RECORDING NO 8906291184: SITUATED IN THE CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON PAI PORTION OF THE NORTHWEST 4, SECTION 5, TOWNSHIP 24 NORTH, RANGE 5 EAST. W.M. SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES c9 i-00 O ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY rs S i9c9 0 ! O �. STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR 0 0 < 0 O EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE 10.. 0� O r�c�0 `9� `9c0SURFACE WATER STANDARD PLAN NOTES. �• . 1) BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD VO. i9 cA 0' 6'S OOc9� c9� AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2) THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO S Z2'95� L5'950- CONSTRUCTION. w 3) ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATESTEDITION 6, 0 Q OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE(RMC), AND THE c9. O. IS STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BYWSDOT AND THE AMERICAN PUBLIC -- WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, 00 OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO O. Lc I I ADDITIONAL COST TO THE CITY. 4) APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, S� n O VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE S S SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE Cj APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BYWRITTEN APPROVAL FROM THE CITY. c, 0 �� �S `!�� 5) A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. • !' -a `�zc 00 Z 6) THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM 0� Ss� �� S LO 0 � AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE 0 - z0 SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S CONTRACTORTO INDEPENDENTLY VERIFY THE ACCURACY OF ALL 6' �� 0 UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE - - - - - - - - - - - - - AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS- BUILT DRAWINGS ALL = = SD = _ _ _ _ _ - - - - - - - - -I-C- - - - - - - - - - - 12:� UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY 301 c9S� c9' `� 6' O NOTIFY THE ENGINEER OFRECORD IF A CONFLICT EXISTS. �p `J 5t 6 ZS-b 2' S17 do19'S5� � S� �� � �� VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS O OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 2 n WN33 QOOM ,9 ,n�30N3d OOM ,9 O 0S �6' �� 1c cQ cP `�� 8) ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14) D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN -1 Lc �5� SX �� PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. ANY DAMAGE TO EXISTING 9) OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED PAVEMENT DRIVEWAYS TO BE / CB#12 BOULEVARD TO BE REINSTATED CB#11 EXISTING STORM MAIN TO BE CB#10 BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY STORM SEWER PLAN -106TH AVE REMOVED TRENCH RESTORATION STANDARDS. "=20' REINSTATED TO ORIGINAL OR WITH TOPSOIL & SOD IMMEDIATELY 10) ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. PLAN SCALE. 1 BETTER CONDITION. AFTER THE STORM WORKS WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS ANY DISTURBANCE TO NEIGHBORING SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11) ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY ANY EXISTING CONNECTION OF EXISTING PSE APPROVAL IS REQUIRED PRIOR TO STORM INSTALLATION LOT FRONTAGES TO BE REINSTATED DITCH OR CULVERT TO BE RECONNECTED (TYPICAL) CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. TO ORIGINAL OR BETTER CONDITION. TO THE PROPOSED STORM SYSTEM WITH 12) ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE TYPE CB -II (TYPICAL) TYPICAL CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE I SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 20. w 13) STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. Y Z Y 14) ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT- = CO o J Q DOO] LOCKING LIDS PER THE CITY STANDARD PLAN 10, 204. 20, 204. 30, AND 204. 50. STRUCTURES SHALL HAVE: 0 U_ I o RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. I • ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/ o \I o GUTTER LINE. ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE x w x w CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF -WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE z ED z ED CITY LOGO. A m m A 15) BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING O O SETBACKS LINES OF THE RENTON SWDM. o o 16) LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO FINAL GRADE ~ ~ UNTIL AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED o GRADES, UNLESS OTHERWISE SHOWN. 17) ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF -WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. I THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES DISCHARGE PIPE ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR PLAN EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE 10'-6" _ PROPOSED GROUND SURFACE WATER STANDARD PLAN NOTES. r 8'-6" 18) ROCK LINING SHALL BE QUARRY SPALLS WITH GRADATION AS FOLLOWS: PASSING 8-INCH SQUARE SIEVE: 100% ^' - PASSING 3-INCH SQUARE SIEVE: 40 TO 60% MAXIMUM EXISTING STORM MAIN PASSING 3/4-INCH SQUARE SIEVE: 0 TO 10% MAXIMUM TO BE REMOVED 19) FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALLSEPARATELY o FILTER FABRIC LINER CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY UNDER ROCK THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON- SITE BMPS. DISCHARGE PIPE 20) THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED " 2'-6" ROCK STORM" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE SECTION A CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00. -A 21) ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON SCALE. 1 "= 1 ' STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR TO FILL /GRADE THE EXISTING DITCH @ 2:1 SLOPE AS PER 22) ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE SECTION 4 OF THE 2017 RSWDM INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/ OR PAVEMENT. 23) ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04. 3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24) FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYERAND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00. 25) ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26) ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT- OF -WAY THAT MAYINTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. EXISTING BOTTOM 27) PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA ( APA) SHALL COMPLY WITH SPECIAL REQUIREMENT OF DITCH # 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS ( RMC 4-3-050). 85LF 12" PVC 28) PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE 85LF 12" PVC AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON- SLIP OR NON- SKID LID PER ADA REQUIREMENTS. 29) CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE 82LF 12" PJC 4 APPLICANT. EL=449.09 S=0.006 30) MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31) CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF20 S=0.008 PROPOSED CB#10 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. PROPOSED CB#11 CITY OF RENTON (TYPE-II-48" DIA) COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. _ o CITY OF RENTON (TYPE-II-48" DIA) - ­,­1 � �� COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE SURVEY BENCHMARK CITY OF RENTON BM 1852, BRASS DISC IN CONIC SI NE 4TH ST AND 148TH AVE SE. PUBLISHED 138.614 METERS NAVD 88 = 454.769 FEET CITY OF RENTON BM 2110 - 1/8" BRASS PIN IN 3" CONC MON IN CASE AT THE SI OF SE 176TH ST AND 116TH AVE SE PUB ELEV = 448.162 NAVD88 SURVEY CENTREPOINTE CONSULTANTS 14209 29TH ST E #105 SUMNER, WA 98390 PHONE: (253) 987-7859 PROTECTION AT OUTFALLS I.L. 11 rvc J=44y./5 TABLE I.E. 12" PVC N=449.75 N N O 0 U) PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS ( E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. in ).00 PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. SING kt zP��ot w4Sy�y� 0 STORM SEWER PROFILE -106TH AVE �4151 /,tom I, n p�ONA `� �`� V / SCALE. 1 "=2'V, 1 "=20'H aa2s�a-15 IN COMPLIANCE WITH CITY OF RENTON STANDARDS O CALL 4 8 HOURS FDEVELOPMENT ENGINEERING' SURFACE WATER UTILITY Z Sippo 03/30/2023 J Farah 03/30/2023 W BEFORE YOUR DIG CALL 811 Q • DATE: 2023/03/14 C TY OF MADUENO SHORT PLAT FIELDBOOK: RENTON 19805 108TH AVE SE, RENTON, WA 98055 PAGE DRAWING N0: Planning/Building/Public Works Dept. STORM SEWER - 106 AVE SE - STATION 10 O 13+00.00 TO STATION 14+57.00 `"E1O-OF_42 El - INFORMATION SHOWN ON THIS DRAWING REGARDING EXISTING UTILITIES IS COMPILED FROM TOPOGRAPHY SURVEY BY CENTREPOINTE CONSULTANTS. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE AND CONFIRM THE LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES, AND ADVISE THE ENGINEER OF ANY POTENTIAL CONFLICTS. CONSULTANT MAINLAND ENGINEERING CONSULTANTS CORPORATION UNIT 206 8363 128TH STREET SURREY, B.C. V3W 4G1 TEL: (604) 543 8044 FAX: (604) 543 8104 EMAIL: CIVIL@MAINLANDENG.COM 5. REISSUED FOR REVIEW SGC 2023/03/14 AB SURVEYED: SURVEYED SCALE: AS SHOWN HORIZONTAL: ALL N AVID 1988 DATUM 4. REISSUED FOR REVIEW SGC 2022 12 02 AB DESIGNED: EM 3. REISSUED FOR REVIEW SGC 2021 /04/14 AB 2. REISSUED FOR REVIEW MK 2020/06/19 AB DRAWN: MK ONE IN 1. ISSUED FOR REVIEW MK 2019/11 /19 AB CHECKED: RM AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY N 0. REVISION B Y DATE A P P R APPROVED: AB