Loading...
HomeMy WebLinkAboutR-41092010" (MIN) VALVE BOX W/ NOTE: LOCKING LID. EXTENSIONS ADD PRESSURE REDUCING VALVE IF REQUIRED. AS REQUIRED. FINISH GRADE DOUBLE CHECK VALVE ASSEMBLY BACKFLOW PREVENTION DEVICE FROM METER 4FtIff 1" Zurn-Wilkins 350. TE VALVE POINT OF CONNECTION: DOUBLE CHECK VALVE/BACKFLOW PREVENTER FROM EDGE OF ROADWAY, BLDG.� WALL OR FENCE 4" • Lv FROM > CONCRETE CURB SPRAY NOZZLE FINISH GRADE MULCH POP UP SHRUB SPRAY BODY CLASS 315 PVC PREFABRICATED TRIPLE SWING JOINT ASSEMBLY (OR APPROVED ALTERNATE FLEX ASSEMBLY) LATERAL LINE (SCH. 40 PVC) POP—UP SPRAY HEAD SHRUB BED AREAS / AT EDGE OF PAVEMENT NOT TO SCALE 10" ROU VALVE I COVER #6 BAR COPPEF WIRE FF CONTRC IN CONI GRAVEL 8`COPPER CLAD GROUND ROD 10 OHMS OR LESS 4J 1' �CTIll IC OUNDING NNECTION I I SH ADE U G) O U V U ' < i D < O Q) 0 _J � LIGHTNING GROUNDING ROD Q<� J NOT TO SCALE o n323) 4) ~ _J 2 p o c n3 �� T9° < Cl o SURVEY BENCHMARK a CITY OF KENT BENCHMARK NO 7073 PUNCH IN 3" BRASS DISC, o, INCASED, LOCATED AT THE INTERSECTION OF SOUTH 2O0TH .N Q 0 ) STREET AND 100TH AVE SOUTHEAST. ELEVATION: 343.77 FEET of 0 2 SURVEY o Lm 6-.9 ° CENTREPOINTE CONSULTANTS 14209 29TH ST E #105 ° " U — SUMNER, WA 98390 PHONE: (253) 987-7859 PIP COCKS TO BE UPRIGHT AND EASILY ACCESSIBLE (ORIENTATION APPROVED BY ENGINEER) NIPPLES AND UNIONS 3/4" DRA c VALVE-7 114 MASTER VALVE 3/4"MANUAL DRAIN VALVE W/ LONG KEY FOR OPERATION OUTFALL PIPE TO DRAINAGE STRUCTURE OR WATER COURSE CONSULTANT Glenn Takagi Landscape Architect 18550 Firlands Way N. Suite #102 Shoreline, WA 98133 (206) 542-6100 PORTION OF THE NW 4, SEC. 5, TWNSHP. 24 N, RGE 5 E, W.M. JUMBO BOX W/ LOCKING LID. EXTENSIONS 1140 GALV THREADED U-BOLT W/ AS REQUIRED. NUTS & WASHERS (TYP) BRACE PAN VIEW 3"OF<1-1/27WASHED ROCK OVER GEOTEXTILE FABRIC BRASS QUICK COUPLER VALVE 10" (MIN) VALVE BOX W/ LOCKING LID. EXTENSIONS AS REQUIRED. 1'-6"LONG 1"0 SCH 80 PVC VALVE BOX W/ LOCKING LID EXTENSIONS (AS REQ'D) 1 0 SCH 40 PVC MAIN LINE SCH 80 PVC ELL OR TEE W/ REDUCER a (4) SCH 803/4PVC ELLS 0 W/ PVC NIPPLES IN OO BETWEEN l o0 SCH 80 3/4 PVC STREET ELL W/ 6" LENGTH OF PVC 7 PIPE W/ HOLES DRILLED FOR DRAIN LINE 1/2 CU YD OF<1-1/2" WASHED ROCK OVER GEOTEXTILE FABRIC 5 DRAIN VALVE NOT TO SCALE INSTALL AT LOWEST POINT IN SYSTEM ADAPTER NLINE CLEAN, COMPACTED NATIVE z BACKFILL MATERIAL 0 N DETECT -A -TAPE (BLUE) 6"ABOVE PIPE SAND (OR APPROVED >_ BACKFILL MATERIAL) PVC MAIN LINE BUNDLE CONTROLLER O WIRES UNDER MAIN LINE & OPPOSITE SIDE FROM SWING JOINTS (WHEN LATERAL & MAIN SHARE o TRENCH) DO NOT TAPE RUNOI Fn WIRES TO MAIN I INF 2a MAINLINE NOT TO SCALE G FINISH GRADE PVC TRIPLE SWING JOINT & HEAD z BACKFILL AROUND SWING JOINT & HEAD W/ SAND PVC LATERAL LINE OVER EXCAVATE UNSUITABLE MATERIALS LATERAL LINE 2b NOT TO SCALE IRRIGATION SYSTEM NOTES 1. Use only trained personnel familiar with required irrigation system installation procedures for specified equipment. Perform installation under the direction of foreman/ supervisor with five years minimum experience in sprinkling system installations. Work and materials shall be in accordance with the latest rules and requlations, and other applicable state or local laws. Nothing in Contract Documents is to be constructed to permit work not conforming to these codes. 2. Coordinate work with other trades as required. Determine location of underground utilities and perforn work in a manner which will avoid possible damage. 3. Provide protection of all property, persons, work in progress, structures, utilities, walls, walks, curbs and paved surfaces from damages incurred arising from this work. Contractor shall pay for any such damage at no additional cost to the Owner. Unfinished and completed work shall be protected from damage by erosion or trespassing, and proper safeguards shall be protected from damage by erosion or trespassing, and proper safeguards shall be erected to protect the Public. 4. Staking and Layout: Verify installation conditions as satisfactory to receive work. Do not install any site elements until any unsatisfactory conditions are corrected. Immediately notify Landscape Architect in writing of any variance between plans and actual site. Landscape Architect has the right to adjust the location of elements. Beginning of work consitutes acceptance of conditions as satisfactory. Layout of valve boxes is especially critical for access and maintenance needs. 5. Irrigation Plan is drawn for graphic clarity. Adjust pipe, valves, sleeving according to field conditions and plant locations. Pipe Layout is diagramatic. Mainline shown outside beds for graphic clarity. Install Mainline and Valves within Common Property Tracts. Coordinate location of Valve Boxes with Owner's Representative. 6. Contractor shall verify all dimensions, quantities, available water pressure (Water District stated approx. 59-63 static psi available) and volume, locations, sleeving and conditions prior to bidding and start of installation. During layout, consult with Landscape Architect to verify proper placement and make recommendations where revisions are advisable. ARBORIST LANDSCAPE ARCHITECT EARTH DANCE DESIGN GLENN TAKAGI 117 E LOUISA ST 18550 FIRLANDS WAY N SEATTLE WA 98102 SHORELINE, WA 98133 PHONE: (206) 789-3188 PHONE: (206) 542 6100 SURVEYED: SCALEVER­n_ HORIZONTAL' NAD 1983/1991 DESIGNED: AS SHOWN 3 REVS PER 6.6.22 GT 2022/10/18 GT - 2 NEW SHEET PER 6.1.21 COMMENTS GT 2021 06 03 GT DRAWN: ONE INCH DATU M 1 NEW SHEET —ISSUED FOR REVIEW GT 2021 /04/1 6 GT CHECKED: _ AT FULL SGLLE IF NOT ONE INCH NO. REVISION BY DATE APPR APPROVED: — SCALE ACCORDINGLY CIVIL ENGINEER SURVEYOR MAINLAND ENGINEERING OWNER CONSULTANTS CORPORATION CENTREPOINTE CONSULTANT JASWANT DHALIWAL UNIT 206, 8363 128TH STREET 14209 29TH ST E #105 2215 MORRIS AVE S. SURREY, B.0 V3W 4G1 SUMNER, WA 98390 RENTON, WA 98055 PHONE: (604) 543 8044 PHONE:(253) 987-7859 JUMBO VALVE BOX W/ SPARE LOCKING LID EXTENSION (AS REQ'D) WATERTIGHT WIRE SPLICES (TYP) 0 I N PVC ADAPTER ATERAL CUT NOTCHES IN BOX )FOR PIPE AS REQ'D 0 J f AT EACH END UNION (2 PLACES) CONTROL WIRES (BUNDLED AUTOMATIC CONTROL UNDER MAINLINE) VALVE PEA GRAVEL OVER GEOTEXTILE FABRIC 3 AU TOM ATI C CONTROL VALVE NOT TO SCALE NOTE: "U" SHAPED CUT-OUT IN VALVE BOX THAT ALLOWS 2"CLEARANCE FROM TOP OF PIPE TO TOP OF "U" 7. Sleeving shall be Sch. 40 PVC unless otherwise indicated. Extend sleeve 6" past the edge of concrete flatwork/walls. Set sleeves at 24" below grade. Coordinate installation and sequencing with General Contractor. 8. Install 14-1 direct burial wire continuous; run one hot wire to each valve and one common wire through each valve, provide one spare wire to each valve. Leave a 'loop' of wire at all mainline turns. 9. System is designed for winterization with compressed air. Do not use automatic drain valves. Install manual drain valves on Mainline in low points to facilitate drainage and repairs. 10. Prior to backfilling, the Mainline shall be subjected to a hydrostatic pressure test of 150 psi. To be valid, all tests must be performed under the direction and supervision of authorized personnel and reviewed by Landscape Architect. Coordinate testing operations/procedure with Landscape Architect. 11. System shall provide full coverage on all areas less shrub interference. It is assumed that the Contractor will exercise professional judgement in location, height, and slope of sprinkler heads. System not to be operated during periods of high wind. 12. The system shall be warranted for all labor and materials for a period of one year from the date of substantial completion of the system as documented by a signed and dated copy of acceptance from the Landscape Architect. The warranty shall include; filling and repairing settlement of soil in trenches and repairing any damage to plantings caused by such. Bid shall also include one winterization and one Spring activation/adjustment. 13. 'Record Drawings': Prepare a complete, legible and accurate set of 'As Built' drawings as installation proceeds. Note any utilities, drainage encountered on plan. Detail and dimension changes made during construction. Field dimension locations of valve boxes, manual valves, quick coupler valves, control wires not in mainline ditch and sleeves. 'As built' drawings shall be submitted to Landscape Architect/Owner for review prior to final inspection and final payment. Contractor shall be responsible for reducing approved drawing to an 11" x 17" format, color code the station/lines and laminate in heavy plastic. Submittals to also include all instruction manuals and equipment 'catalogue cuts/product descriptions', Quick Coupler Valve Key, Backflow Preventer Testing -Certification, complete instructions for system operation, maintenance and winterizing of installed equipment. 14. After system is installed and approved, instruct Owner's designated personnel in complete operation and maintenance procedures. N 00 N 0 0 i T , LJ 07 N C) C) i Q J LO O O O Q J R-410920 O IN COMPLIANCE WITH CITY OF RENTON STANDARDS Cn � O DEVELOPMENT ENGINEERING �' CURRENT PLANNING 0 } z CALL_ 48 HOURS Michael Sippo 03/30/2023 MHerrera 04/04/2023 W BEFORE YOUR a D G CALL 811 CQ G DATE: CITY OF 2020/ 10/ 18 U MADUENO SHORT PLAT LU FlELDBOOK: PAGE: RENTON19805 108TH AVE SE, RENTON, WA 98055 DRAWING N0: O Planning/Building/Public Works Dept. 2 IRRIGATION NOTES & DETAILS s"EEr: 23 OF42