HomeMy WebLinkAboutR-382036O
N
00
cy)
I
O
I
r)
LU
\ I
\ I
4. \\ ed a
d
I
- - - - - - - - - -
LIVE STORAGE VOLUME (CF)
DEAD STORAGE VOLUME (CF)
RELEASE RALE (CFAs)
ax
-4II
I
/ 8" INLET FROM CBjL
------------------------ ------
n
AS -BUILT
REQUIRED
Y IE: 41.0
AS -BUILT
2 -YEAR
4,411
4,513
1,515
-
400
100
0.01
0.01
0.02
10 -YEAR
Q
7,033
24�ACC SOLID UD
-
y
I
0.04
004
AccEss Mwra
HO
100 -YEAR
n
8,601
$601
-
400
IW
0.06
DOE
94'
suMP
-
_ DET—R—MON VAULT
\4
T
_
yl
p
d
D'B1iMONVAULQI'd
°
\
\
3381'
\ d'
Q
d
\
8' ROOF DRAW Il.ffi (AB)
If: 41.0 __-_-__ 11R EL=3Bl-
3610 (AB)
VAULT SBCIIONA-A
SCALE I•=5'
SCALE: 1" = 10'
10 n 0
SE 1/4, SW 1/4, SEC, 05, T. 23 N., R.05E., W.M.
KING COUNTY, WASHINGTON
6" ELBOW
RES ICTOR,
EL=41-35 41.16 (AB)
ORIFICE DIA.=0.91"
SEE DETAIL
PIPE SUPPORTS.
N0. AS REO'D
3" X 0.9 G4
BOLT OR
IMBEDDED 23' (MIN.) -
IN CEL WALL O 3'
(MAX) SPACING.
MIN. i' SUPPORT
ORIFICE /1 =
056' DIA
EL=37_25
RESTRICTOR PLATE TO
BE SHARP EDGED
SHOP DRILLED
e�
t
-----U.F. EL 10.9 -�---
401
POLYPROPYLENE SAFELY
STEPS AND UDDER
X
CLEANOLR/SHEAR
DATE
T2 a SD
to
�---4--
ei rLOWRBSCTRICTOR
SCALE I•_2'
HANDLELIFT HANDLE SHALL BE
O w/LOCK PIN ATTACHED PER
ADIOSTABLE MANUFACTURER'S
LOCK HOOK O RECOMMENDATIONS
w/LOCK SCREW
ALTERNATES ARE ACCEPTABLE
PROVIDED MATERNL SPECIFKAPONS
ARE MET AND FLANGE BOLT
PATTERN MATCHES
I
e2 CLEANOUTISHEARGATE
NOT TO SCALE
PLATE K OM TO PRO
w/ORIFICE AS SPECIFIED
n---
A
t-
0 0
LVEL
- - - - - - - - - -
LIVE STORAGE VOLUME (CF)
DEAD STORAGE VOLUME (CF)
RELEASE RALE (CFAs)
ax
-4II
I
/ 8" INLET FROM CBjL
------------------------ ------
---------�
AS -BUILT
REQUIRED
Y IE: 41.0
AS -BUILT
2 -YEAR
4,411
4,513
1,515
-
400
100
0.01
0.01
0.02
10 -YEAR
6,912
7,033
24�ACC SOLID UD
-
y
I
0.04
004
AccEss Mwra
HO
100 -YEAR
n
8,601
$601
-
400
IW
0.06
DOE
94'
suMP
-
_ DET—R—MON VAULT
T
_
yl
3381'
24"a SOLID LID
ACCESS MALI
w
VAULT DEMENSIONS
SCALE: 1'= 10'
8' ROOF DRAW Il.ffi (AB)
If: 41.0 __-_-__ 11R EL=3Bl-
3610 (AB)
VAULT SBCIIONA-A
SCALE I•=5'
SCALE: 1" = 10'
10 n 0
SE 1/4, SW 1/4, SEC, 05, T. 23 N., R.05E., W.M.
KING COUNTY, WASHINGTON
6" ELBOW
RES ICTOR,
EL=41-35 41.16 (AB)
ORIFICE DIA.=0.91"
SEE DETAIL
PIPE SUPPORTS.
N0. AS REO'D
3" X 0.9 G4
BOLT OR
IMBEDDED 23' (MIN.) -
IN CEL WALL O 3'
(MAX) SPACING.
MIN. i' SUPPORT
ORIFICE /1 =
056' DIA
EL=37_25
RESTRICTOR PLATE TO
BE SHARP EDGED
SHOP DRILLED
e�
t
-----U.F. EL 10.9 -�---
401
POLYPROPYLENE SAFELY
STEPS AND UDDER
X
CLEANOLR/SHEAR
DATE
T2 a SD
to
�---4--
ei rLOWRBSCTRICTOR
SCALE I•_2'
HANDLELIFT HANDLE SHALL BE
O w/LOCK PIN ATTACHED PER
ADIOSTABLE MANUFACTURER'S
LOCK HOOK O RECOMMENDATIONS
w/LOCK SCREW
ALTERNATES ARE ACCEPTABLE
PROVIDED MATERNL SPECIFKAPONS
ARE MET AND FLANGE BOLT
PATTERN MATCHES
I
e2 CLEANOUTISHEARGATE
NOT TO SCALE
PLATE K OM TO PRO
w/ORIFICE AS SPECIFIED
n---
A
t-
0 0
LVEL
\ Px 1P
I I I I prs.dbeattininmgaa
I I I PLAN VIGW orxrurllao
GdImJ
9'x 1p'xnu wY 1 I MT!
mo���oaln I t --J
be atm sem L ---j
tremae. y.ua ew maaadamau _
r wamea �wux�wx Waw pats — ,
n.�e.
IWoimq
Di l6k W.S.
tenors
or ams we e
anC onm Y
NTE �-- 4r Nuri
naw
Godo -,a
flow
A
aYxboloula qp
MMmbml
tpp-yrawan inflow lbw
2410 SOLID LID "OTC31
DD 2/4" FRAME At 1, All metal pans most be comcISIon reslsont. Steal parts must be galvanized and
at LEVEMNG BRICKS asphalt coated(Treatment l or better).
ICKS TOP OF PT APB (SEE 2. Provide water stop at all cast -In -pace wrabudlw pints
TOP OF PT SLAB (SEE ARCHITECT PUNS Fp4 Preceaal vaulls shall have approved rubber gasket system.
ARCHITECT PLANS FOR ELEVATON 3. Vaults <10 wide must use renvable lids.
ELIYATOMC) A. Prefabricated vault sections may require structural modifauos
°�r III FLOW RESIRICiPR >ooO _ EL -44.3 to support 5'x10' opening ower mein vaul. Altematisey, abees
r002-006)
1 ° an be provided Hoa side vestibule as shorn.
FLOW RESTMCTOR (SEE DETAIL 1/C42) o o �)
0 ---- B100YR. EL�d:B•- ------ E. All vault areas must be wlmin SIT of an access point.
(SEEDEraI.I/c42)oo e. Fa vaults under roadways. thewoo able pawl must be bated coalde the travel lance.
DRAIN PER—o°o ---------10YR. Ell M ---------- b` Ntematively, multiple standard bcklrg manhole awe may be prwded. Spacing of marl
IN PER ARCHITECT PUNS 41.85(16) wvemshallbel2feet,HIECT PUNSww0HOL0 STEPS OR o - 2YR. ELS, handhdrts need only be provided at the wlN plpeaM inlet pipe,
HOLD STEPS OR UDDER (SEE KCRS OwG ooER (SEE KCRS DWG 2-006) oo IE: 410 8- INLET FROM CB/f3 TYPIALDE!FrV7IONVAUL7' o
0 o0 Nor ro scuE
IE DDT -3 - _ DEAN STORAGE X25 R-38236
u o IE OUT
AB JJ.TB TAB) o$ SS
( ) 6` PERFOPATED —N. 5R
6" PERFORATED WALL OFP1N
Z o
Y WALL GRAIN 's 4 I CERTIFY THAT THE LOCATIONS AND ELEVATIONS SHOWN ON TILE
4' g
AS -BUILT PUNS FOR IPGASA
I LO SIGNED BY BRIAN AS BUILT
$ALAB ARE BASED ON FIELD LD SURBVEY LOCATIONS AND ELEVATIONS
VAULT SBCIIONB-B COMPLETED BY 7 AND C OWDED TO JEW F, BPC IN JULY AND
AUCCAST OF 2013 AND PRONGED TO TECO FOR FINAL PIAN
SCALE 1'=5' PREPARATION
DEPENTIONSUH"TCHART
- - - - - - - - - -
LIVE STORAGE VOLUME (CF)
DEAD STORAGE VOLUME (CF)
RELEASE RALE (CFAs)
ax
-4II
I
-
------------------------ ------
---------�
AS -BUILT
\ Px 1P
I I I I prs.dbeattininmgaa
I I I PLAN VIGW orxrurllao
GdImJ
9'x 1p'xnu wY 1 I MT!
mo���oaln I t --J
be atm sem L ---j
tremae. y.ua ew maaadamau _
r wamea �wux�wx Waw pats — ,
n.�e.
IWoimq
Di l6k W.S.
tenors
or ams we e
anC onm Y
NTE �-- 4r Nuri
naw
Godo -,a
flow
A
aYxboloula qp
MMmbml
tpp-yrawan inflow lbw
2410 SOLID LID "OTC31
DD 2/4" FRAME At 1, All metal pans most be comcISIon reslsont. Steal parts must be galvanized and
at LEVEMNG BRICKS asphalt coated(Treatment l or better).
ICKS TOP OF PT APB (SEE 2. Provide water stop at all cast -In -pace wrabudlw pints
TOP OF PT SLAB (SEE ARCHITECT PUNS Fp4 Preceaal vaulls shall have approved rubber gasket system.
ARCHITECT PLANS FOR ELEVATON 3. Vaults <10 wide must use renvable lids.
ELIYATOMC) A. Prefabricated vault sections may require structural modifauos
°�r III FLOW RESIRICiPR >ooO _ EL -44.3 to support 5'x10' opening ower mein vaul. Altematisey, abees
r002-006)
1 ° an be provided Hoa side vestibule as shorn.
FLOW RESTMCTOR (SEE DETAIL 1/C42) o o �)
0 ---- B100YR. EL�d:B•- ------ E. All vault areas must be wlmin SIT of an access point.
(SEEDEraI.I/c42)oo e. Fa vaults under roadways. thewoo able pawl must be bated coalde the travel lance.
DRAIN PER—o°o ---------10YR. Ell M ---------- b` Ntematively, multiple standard bcklrg manhole awe may be prwded. Spacing of marl
IN PER ARCHITECT PUNS 41.85(16) wvemshallbel2feet,HIECT PUNSww0HOL0 STEPS OR o - 2YR. ELS, handhdrts need only be provided at the wlN plpeaM inlet pipe,
HOLD STEPS OR UDDER (SEE KCRS OwG ooER (SEE KCRS DWG 2-006) oo IE: 410 8- INLET FROM CB/f3 TYPIALDE!FrV7IONVAUL7' o
0 o0 Nor ro scuE
IE DDT -3 - _ DEAN STORAGE X25 R-38236
u o IE OUT
AB JJ.TB TAB) o$ SS
( ) 6` PERFOPATED —N. 5R
6" PERFORATED WALL OFP1N
Z o
Y WALL GRAIN 's 4 I CERTIFY THAT THE LOCATIONS AND ELEVATIONS SHOWN ON TILE
4' g
AS -BUILT PUNS FOR IPGASA
I LO SIGNED BY BRIAN AS BUILT
$ALAB ARE BASED ON FIELD LD SURBVEY LOCATIONS AND ELEVATIONS
VAULT SBCIIONB-B COMPLETED BY 7 AND C OWDED TO JEW F, BPC IN JULY AND
AUCCAST OF 2013 AND PRONGED TO TECO FOR FINAL PIAN
SCALE 1'=5' PREPARATION
DEPENTIONSUH"TCHART
STORM
LIVE STORAGE VOLUME (CF)
DEAD STORAGE VOLUME (CF)
RELEASE RALE (CFAs)
EVENT
REWIRED
DESIGNED
AS -BUILT
REWIRED
DESIGNED
AS -BUILT
REQUIRED
DESIGNED
AS -BUILT
2 -YEAR
4,411
4,513
1,515
-
400
100
0.01
0.01
0.02
10 -YEAR
6,912
7,033
7,=
-
400
IOD
0.04
004
D04
100 -YEAR
8,529
8,601
$601
-
400
IW
0.06
DOE
Q06
nabill
rw811�befeleyoudig.
U17LUTCONFLICTNOTE.
CAUTION.•
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER
SHOWN ON THESE PUNS OR NOT BY POTHOLING THE URUnES AND
SURVEYING ME HORIZONTAL AND VERTICAL LOGIRON PRIOR TO
CONSTRUCTION THIS AND THEN SHALL INCLUDE CALLING UTILITY LOCATE
O 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT
LOCATIONS OF NEW UTILITY CRCSSINGS TO PHYSICALLY VERJY WHETHER
OR NOT CONNCTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON
THESE PLANS ARE BASED UPON THE UNVERIPEO PUBLIC INFORMATION
AND ARE SUBJECT TO VARIATION. IF CONRICTS SHOULD OCCUR, THE
CONTRACTOR SHALL CONSULT WIN INSIGHT ENGINEERING COMPANY TO
RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION