HomeMy WebLinkAboutAdden 02 CAG-16-063, Adden #2-18 Ilk WIWashington State Department of Transportation Supplemental Agreement Organization and Address Number 2 Parametrix,Inc. Original Agreement Number 1019 39th Ave SE,Suite 100,Puyallup,WA 98374 CAD-16-063 Phone: 253-604-6739 Project Number Execution Date Completion Date 118-8-1-102(037) 6/21/2016 December 31,2018 Project Title New Maximum Amount Payable Duvall Avenue NE $579,167(this supplement increased by$155,457) Description of Work Engineering services for design improvements on Duvall Avenue NE to restore the paved surface,and fill in missing non-motorized facilities such as sidewalks and bicycle lanes,illumination,and channelization. As outline in attached Exhibit A-1,this Supplemental Agreement Number 2 will provide additional engineering services to address utility conflicts in the design. The Local Agency of City of Renton desires to supplement the agreement entered in to with Parametrix,Inc and executed on 6/21/2016 and identified as Agreement No. CAD-16-063 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read: The Scope of Work described in Section II of the Agreement is amended to add the Scope of Services described in the attached Exhibit A-1. II Section IV,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Completion date remains December 31,2018, III Section V, PAYMENT,shall be amended as follows: Additional services added by this Supplemental Agreement Number 2 increase the maximum amount payable by$155,457 making a new maximum amount payable$579,167.See attached Exhibits"A"thru A-2. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:Parametrix,Inc. By:DenisMayor ' /4c------- ii• , , .... .„,NN, -14 ant lure + . 17 gna . ? �` J?"au++nrgq4,' O ''i //://, ., Z 's ATTEST: ` 1 c�Y / _` L DOT Form 140-063 J , son . Set , itt C .erk.m. Revised 0W2005 '. 00'', �.� g� i"/,,,A-RATED,S�.'•`.%\�. Exhibit "A" Summary of Payments Basic Supplement#2** Total Agreement* Direct Salary Cost $119,209 $38,116 $157,325 Overhead $224,112 $71,662 $295,774 (Including Payroll Additives) Direct Non-Salary Costs $41,050 $33,100 $74,150 Fixed Fee $39,339 $12,579 $51,918 Total $423,710 $155,457 $579,167 * Basic Agreement figures include Supplemental Agreement No. 1. ** See Exhibits A-1 and A-2. DOT Form 140-063 Revised 09/2005 Parametrix ENGINEERING PLANNING.ENVIRONMENTAL SCIENCES Exhibit A-1 SCOPE OF WORK Supplement No. 2 City of Renton Duvall Avenue NE Improvements: NE 10th Street to Sunset Boulevard PROJECT OVERVIEW The City of Renton Transportation Systems Division(AGENCY),as part of its Capital Improvement Program,has identified improvements on Duvall Avenue NE, NE 10th Street to Sunset Boulevard to restore the paved surface, and fill in missing non-motorized facilities,such as sidewalks and bicycle lanes,illumination,and channelization. The AGENCY has hired Parametrix(CONSULTANT)to provide design services.Since the time of the agreement, signed June 21,2016(AGREEMENT),several key scope items have changed.This SUPPLEMENT No.2 includes these changes to the scope.The original scope text is included herein,and revisions to the scope are written in underlined italics. SCOPE OF SERVICES The CONSULTANT will assist the AGENCY by providing the following services: • Project Management for the full design phase. • Public Outreach including: Targeted Stakeholder Meeting(s). • Concepts Development and/or Alternatives Workshop with AGENCY staff. • Stormwater Analysis. • Preliminary and Final PS&E Design. • Engineering support during the bidding phase. Assumption(s) • The project schedule assumes that this design and bidding phase of the project will be completed by June 30,2018;however,the overall completion date of this AGREEMENT is December 31, 2018,to account for future supplements to the AGREEMENT which may include construction assistance. • Time is a material consideration in the performance of all work by the CONSULTANT under this SUPPLEMENT.The CONSULTANT shall complete its work and services within its control to meet the agreed upon schedule.The CONSULTANT shall provide to the AGENCY monthly updates to the project schedule that identify tasks and deliverables that require time extensions due to reasonable and/or unforeseen circumstances.The AGENCY shall not unreasonably withhold written acceptance of the time extensions. This assumption is modified as follows: Dates have been updated in this scope, based on discussions with the AGENCY'S project manager. City of Renton 214-1779-045 Duvall Avenue NE Improvements. 1 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • Right-of-Way and construction easement acquisition is not included in the Scope. This assumption is modified as follows:Right-of-Way and construction easement acquisition will be limited to providing assistance to the AGENCY for dedication of a portion of four properties to the AGENCY and providing assistance to the AGENCY for utility and slope easements. The Scope of these right-of-way services is included in Task 4. • A Management Reserve Fund of$20,000 is included for items not included in the Scope.The Management Reserve Fund will not be used without written authorization by the AGENCY. This assumptions is modified as follows:and additional$30,000 has been added to the Management Reserve Fund,for a total of$50,000. • All deliverable formats indicated below shall be in software versions as listed under Exhibit C of the AGREEMENT. • Roadway improvements are assumed as follows: Duvall Avenue NE from just south of NE 10th Street to NE 12th Street: • New curb,gutter,sidewalks,and landscape strip along the westerly side. If determined feasible, sidewalk shall be made of pervious concrete. • Storm drainage improvements. • Stormwater treatment and detention. If right-of-way is needed for SW facilities,this will be part of a future amendment. • Complete pavement restoration. • Channelization and signage improvements, including new bicycle lanes. • Illumination along the westerly side. > Duvall Avenue NE between NE 12th Street to just south of Sunset Boulevard: • Overlay of existing roadway. • Rechannelization of the existing roadway to accommodate bicycle lanes. • Existing curb,gutter,and sidewalk will remain in place. This assumption is modified to add the following: > Duvall Avenue NE from just south of NE 10th Street to NE 12th Street: • New median island. • New fiber optic system and connection to NE 10th Street HAWK Signal. • New water line. • Duvall Avenue NE between NE 12th Street to just south of Sunset Boulevard: • Overlay of existing roadway with crown shift to the west stripe of the two way left turn lane. In areas where crown shift cuts more than 2 inches into the roadway,full depth pavement restoration will be added. • Widen Duvall Avenue NE 5 feet to the west with new curb, gutter,sidewalk, and walls. • Storm drainage improvements. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 2 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • Illumination along the westerly side. • Relocate and modify HAWK signal at NE 12th Street. • New fiber optic system and connections to the Sunset Boulevard and NE 12th Street HAWK signals. • New water line and hydrant relocations. > Duvall Avenue NE between NE 9th Street to just south of NE 10th Street(Schedule B): • New curb, gutter,sidewalk, and walls along the westerly side between NE 10th Street and the recently completed Chelan Creek development. This also includes new illumination and storm drainage along the westerly side. • Channelization and signage improvements,including new bicycle lanes and left turn lane between NE 9th Street and NE 10th Street. > Duvall Avenue NE, directly north of NE 4th Street(approximately 200 feet total length)(Schedule C): • New curb, gutter,and sidewalk along the westerly side to complete missing gap. • Associated storm drainage conveyance modifications. • Channelization and signage for the end of the bike lane. PHASE 1 —PRELIMINARY AND FINAL DESIGN WORK Task 1 — Project Management(Notice to Proceed [NTP]through December 31. 2018) Work will include providing the tools for tracking the project schedule, budget,and status of deliverables, coordination with Subconsultants and management of internal staff,as follows: • Preparation and update of a design schedule in Microsoft Project format. • Coordination with the AGENCY through emails,conference calls,and meetings. • Conduct a project walk-through upon Notice to Proceed to establish project definition. • Preparation of AGENCY-provided Monthly Progress Reports spreadsheets to be included in invoicing. • Preparation of a QA/QC Plan. • Preparation of a preliminary layout and cost estimate that schematically lay out the project definition as determined during the walk-through. • Conformance to the TIB design grant conditions,as shown in Exhibit K. Assumption(s) • The project schedule assumes that this design and bidding phase of the project will be completed by June 2018.Therefore,the hours estimated in the budget are for project management costs from NTP through June 2018. Project management costs beyond those dates,including during the construction phase,will be included in a future supplement. City of Renton 214-1779-045 Duvall Avenue NE Improvements. 3 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • A total of six meetings between the CONSULTANT and AGENCY will take place during the project at the AGENCY'S office. This assumption is modified as follows:A total of ten meetings between the CONSULTANT and AGENCY will take place during the project at the AGENCY'S office. • Conference calls between AGENCY and CONSULTANT project managers on a weekly basis will average approximately 1/2 hour in duration.The CONSULTANT project manager will document the weekly conference calls with an email including an updated copy of the issues log,if applicable. Deliverable(s) • Project Schedule,with weekly updates,in Microsoft Project and PDF format.(Submitted 5/18/2016,with monthly updates) • Up to four requests for schedule extensions.(Submitted throughout project duration) • Miscellaneous correspondence to document project management issues,in email format.(Notice to Proceed through June 30, 2018) • Monthly Progress Report and invoice(one hard copy to be mailed to the AGENCY each month).(First Progress Report will arrive in mid-July,with monthly invoices ending in mid-September,2017.) • Project meeting agendas and minutes, in Microsoft Word format.Agenda will be submitted 2 days before the meeting and minutes will be submitted 2 days after the meeting. • QA/QC Plan, in PDF format. (Delivered to the AGENCY within 2 weeks after Notice to Proceed) • Preliminary plan(roll plot)and cost estimate,delivered to the AGENCY within 2 weeks after the initial project walk-through. Task 2—Surveying and Base Mapping (NTP through December 2017) Work will include conducting a field survey and preparation of an electronic base map of the project area as defined below,to be used in engineering design. Approach The CONSULTANT shall establish horizontal and vertical control along Duvall Avenue NE from the southerly terminus of NE 10th Street to approximately 150 feet south of Sunset Boulevard,and along NE 12th Street from Duvall Avenue NE to the westerly edge of Chelan Avenue NE. From this control,surveyors will map existing improvements and ground conditions in order to prepare a topographic base map. Mapping will include(but not be limited to): • Monuments which control right-of-way alignments of Duvall Avenue NE and abutting streets. • Control points for construction staking. • Traffic channelization, including islands,left turn pockets,striping,curb and gutter,sidewalks, wheel chair ramps,landscaping,and driveway approaches. • Underground utility locations,including measure down of all stormwater structures.The CONSULTANT will arrange for APS to mark utility locations prior to the field survey. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 4 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • Mapping will also include ground conditions and improvements within the current right-of-way on both sides of Duvall Avenue NE. • The base map will show parcel lines and right-of-way limits of Duvall Avenue NE,within the mapping limits. Limits of the mapping including utilities: • Duvall Avenue NE, including between the existing right-of-way on each side,beginning at a point approximately 100 feet south of the southerly margin of NE 10th Street and terminating approximately at the southerly curb returns of Sunset Boulevard. • NE 10th Street,including between the existing right-of-way on each side,beginning at a point approximately SO feet east and west of the easterly/westerly margins of Duvall Avenue NE. • NE 12th Street,including between the existing right-of-way on each side, beginning at a point approximately 50 feet east of the easterly margin of Duvall Avenue NE to the intersection of NE 12th Street and Chelan Avenue NE. The limits of the mapping are modified as follows: • Duvall Avenue NE,existing right-of-way on each side from 350 feet south of NE 9th Street to NE 10th Street. • Duvall Avenue NE, west half of the right-of-way from the north right-of-way margin of NE 4th Street to approximately 200 feet north of NE 4th Street. Assumption(s) • Base maps will be prepared following the City of Renton Drafting Standards for Road, Bridge,and Municipal Construction,2004 Edition. • One day of traffic control will be required to obtain measure-downs in storm and sanitary sewer structures within the Duvall Avenue NE travelled way.Traffic control will be provided by the CONSULTANT. • The AGENCY will attempt to provide the right of entry to field survey the southerly side of NE 12th Street west of Duvall Avenue NE,which is privately owned. Deliverable(s) • Electronic Base Map in AutoCAD 2015 format.(Delivered to the AGENCY within two months post NIP) Task 3—Geotechnical Analysis—To be conducted by HWA Geosciences (NTP to 3 months post-NTP) Work anticipated is to update the Geotechnical and Pavement Engineering Investigation prepared by HWA Geosciences to include recommendations for pervious concrete sidewalk, if feasible. Assumption(s) Additional field work within the existing shoulders may be necessary to determine the feasibility of pervious concrete sidewalk. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 5 January 2018 NE lath Street to Sunset Boulevard SCOPE OF WORK(continued) Deliverable(s) • Revised memorandum including pervious concrete sidewalk recommendations, in PDF format.(Delivered to the AGENCY within three months post-NTP) Task 4— Public Outreach(2 months post-NIP through June 30. 201 S) Work will include soliciting input from adjacent property owners and informing adjacent property owners of proposed solutions and present recommendations to AGENCY through one-on-one meetings to help shape potential design solutions for the project. 4.1 One-On-One Meetings The CONSULTANT shall schedule and facilitate up to three one-on-one meetings with stakeholders as determined by the AGENCY.A minimum of 3 working days'notice shall be given to the AGENCY's project manager to coordinate participation of other AGENCY staff in the one-on-one meetings. Assumption(s) • Up to five one-on-one meetings will be required.One CONSULTANT staff member and at least one AGENCY staff member will attend each meeting.Graphics from other efforts on the project will be utilized for one-on-one meetings. No graphics will be prepared specifically for one-on-one meetings beyond one figure showing a close up of the project design for specific property owners. Deliverable(s) • One-On-One Meetings:Additional meeting notes from one-on-one meetings—PDF format. (Delivered to the AGENCY within 2 days after meeting date) Deliverables are modified as follows: • One figure on aerial will be provided to the AGENCY for each parcel as a visual tool to aid the AGENCY in discussions with the property owner. 4.1 Acquisition Support(New Subtask) The CONSULTANT shall assist the AGENCY in obtaining dedication of riqht-of-way and easements for the Project. Assumption(s) Assumptions are modified as follows: • Right-of-Way will be acquired from the following two parcels: • Parcel at the southwest corner of Duvall Avenue NE and NE 12th Street—Acquisition area to include the existing south half of the improved roadway on the west leg of NE 12th Street. D Parcel on the east side of Duvall Avenue NE at NE 12th Street—Acquisition area to include the existing improved roadway on the east leg of NE 12th Street plus additional area as determined by the preliminary design to be needed for proposed,and potentially future, curb returns and sidewalks in the NE and SE corners of the intersection. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 6 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • Easements will be acquired from the following parcels: • Two parcels along the west side of Duvall Avenue NE between NE 12th Street and Sunset Boulevard— Easement areas to consist of a strip easement along the west right-of-way margin for slopes, walls, and utilities(illumination and hydrants). • One parcel along the west side of Duvall Avenue NE between NE 10th Street and NE 12th Street— Easement area to consist of a strip easement along the west right-of-way margin for slope and wall. • Upon agreement with the property owners to dedicate a portion of their parcels to the AGENCY, the CONSULTANT will order Title Reports for five parcels and prepare five legal descriptions and exhibits for a total of five right-of-way dedications and easements.Locations and widths of utility and slope easements will be shown on the plans for use by the AGENCY in easement acquisition. • The AGENCY will be responsible for preparing agreements,negotiating, and recording documents. Deliverable(s) Deliverables are modified as follows: • Title Reports(5)in PDF and hard copy format. • Legal Descriptions and accompanying exhibits(5)in PDF format. Task 5— Design Report(NTP through 4 months post-NTP) To verify and document design criteria for use on the project. 5.1 Design Report The CONSULTANT shall prepare a report to summarize the predesign efforts. Key issues to be addressed in the Design Report: • Project limits and cost estimate. • Widths of planter strips and sidewalks on Duvall Avenue NE. • Coordination with other planned projects and/or utility upgrades. • Stormwater requirements. • Public outreach plan. The Design Report shall address the following specific design criteria to be used as the basis for completing formal design for the project: • Roadway Classifications. • Pavement Design. • Pervious Concrete locations(if applicable). • Posted Speed. • Design Speed. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 7 January 2018 NE lath Street to Sunset Boulevard SCOPE OF WORK(continued) • Design Vehicle. • Curb Return Radii. • Lane Widths. • Planter Widths. • Sidewalk Widths. • Clear Zone. • Illumination Light Levels and Uniformity. Assumption(s) Design report will be three to seven pages in length, not including graphics and appendices. Assumptions are modified as follows: • Design report will be updated to include modified project limits,pavement design, new median planter, and storm water requirements. Deliverable(s) • Draft Design Report—PDF format.(Delivered to the AGENCY within 3 months post-NTP) • Final Design Report—PDF format. (Delivered to the AGENCY within 2 weeks after receipt of AGENCY review comments) Task 6- Stormwater Analysis(1 month post-NTP through 18 months post-NTP) Work will include preparation of a Technical Information Report(TIR)that reflects the stormwater management approach for project improvements on Duvall Avenue NE generally between NE 10th Street and NE 12th Street and associated access restoration on adjacent properties. • Coordinate with AGENCY to obtain copies of stormwater TIRs for: • AGENCY-owned stormwater management facilities within Duvall Avenue NE right-of-way. • AGENCY-owned stormwater management facilities within the NE 10th Street and NE 12th Street right-of- way. > Private stormwater management facilities within the adjacent properties:Review the basis of design of the facility(ies)for contributing area,level of treatment,and level of flow control.Confirm if the facility(ies)was designed for any new impervious surface within the project area. • Coordinate with the AGENCY to obtain copies of storm system maps or record drawings to review drainage patterns for off-site areas adjacent to the project limits.This information will be used to determine where an equivalent area can be designated for stormwater management. • Perform a Level 1 Downstream Analysis.The Downstream Analysis will extend 1 mile downstream of the project location as required by the AGENCY's amendments to the King County Surface Water Design Manual(SWDM).The Downstream Analysis will include visual observations of locations that are readily accessible.Coordinate with the AGENCY to identify any documented downstream drainage problems or system concerns.The Downstream Analysis will be summarized in a technical memorandum and include City of Renton 214-1779-045 Duvall Avenue NE Improvements: 8 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) a vicinity map,sketches,and photos.The technical memorandum will be submitted to the AGENCY for informational purposes and to identify any issues that need to be resolved before the stormwater analysis can proceed.The technical memorandum will also be included as an appendix in the Draft and Final TIR. • Meet with the AGENCY up to one time to discuss the approach,on or around July 1,2016. Proceed with final design and analysis of the option selected by the AGENCY. • Prepare the Draft TIR,based on Section 2.3.1.1 of the AGENCY's amendments to the King County SWDM. • Meet with the AGENCY to discuss comments on the Draft TIR,on or around August 12,2016. Prepare the Final TIR.Modified as follows:Post 30 percent Review stormwater meeting to finalize AGENCY'S storm water decisions. Assumption(s) • The project improvements will fall within four threshold discharge areas(TDA5),each having more than 2,000 square feet of new or redeveloped impervious surface and will require Full Drainage Review. • Stormwater mitigation within AGENCY right-of-way could be applied to an equivalent area rather than the actual new or redeveloped impervious areas. • Basic water quality treatment will be required. • Stormwater mitigation for the targeted areas will be provided. • The project is located in Aquifer Protection Zone 2. • Because of the roadway profile grades and the Zone 2 Aquifer Protection Zone, pervious pavement will not be used for any new or redeveloped roadway,but shall be used for sidewalk construction. • There may be more than 0.1 cubic feet per second increase in the runoff rate for the 100-year flow frequency between existing and proposed conditions. • The flow control duration standard for forested conditions will be required. • Any existing AGENCY-owned stormwater management facility will not be modified for any new or redeveloped impervious surfaces. • Existing storm system components will be added to the base map as part of the survey services. • New stormwater management facilities may be constructed within public right-of-way. Assumptions are modified as follows: • Stormwater analysis will be updated to include modified storm system design based on City direction(post 30 percent submittal). Deliverable(s) • Downstream Analysis technical memorandum,in PDF format.(Delivered to the AGENCY within 3 months post-NTP) • One unbound copy of the draft TIR including an electronic copy(MS Word)of the report text and in PDF format.(Delivered to the AGENCY within 3 months post-NTP) City of Renton 2144779-045 Duvall Avenue NE Improvements: 9 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) • Two bound and one unbound copies of the final TIR.Submittal of the final TIR will include an electronic copy(MS Word and PDF format)of the final report,graphs,tables,and electronic versions of other information contained in the Final TIR.Submittal of the final TIR will also include an electronic copy of all computer modeling files used in the analysis including input and output files.(Delivered to the AGENCY within 2 weeks after receipt of AGENCY comments and/or review meeting with AGENCY) • The Draft and Final TIR will include the Downstream Analysis technical memorandum as an appendix. Task 7— Preliminary Design (2 months post-NTP to 12 months post-NTP) The Consultant will prepare preliminary design plans to sort out design issues and gain AGENCY consensus on the preliminary plan set before proceeding into preparation of bid plans and specifications. 7.1 Preliminary Design Workshop The CONSULTANT shall prepare a preliminary layout and facilitate a workshop-type meeting with AGENCY staff to review on or around 3 months post-NTP.The CONSULTANT will work collaboratively with AGENCY staff to identify any modifications necessary to gain consensus on the preferred layout. Assumption(s) One preferred alternative will be presented going into the workshop.It will be based on the channelization recommendations by the AGENCY and Design Report process with minor refinements directed by the AGENCY's project manager based on input received from the one-on-one meetings with property owners.The alternative may be either hand drawn or CAD drawn and will show at a minimum,the following elements of the design: • Curb returns/radii. • Channelization,including lane configuration,turn storage lengths,median islands,and curbing. • Type and location of signal controller,poles, heads,displays,phasing,junction boxes,and light standards. • Type and location of retaining walls—including hand/guard rails. • Utility relocation needs. Deliverable(s) • Preliminary layout for workshop.(Delivered to the AGENCY 2 months post-NTP.) • Meeting attendance—up to three staff. • Meeting notes and/or revised layout sketches, in Microsoft Word and PDF format.Agenda will be submitted to the AGENCY 2 days before meeting and meeting notes will be submitted to the AGENCY 2 days after meeting. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 10 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) Assumption(s) As much as reasonably possible,WSDOT standard bid items and bid cost tabulations will be used as the basis of the preliminary opinion of cost. However,because the design will not be fully developed at this time,some items may need to be estimated as'square foot'costs or lump sums.The preliminary opinion of cost will have both a design estimating contingency to account for the uncertainties at this stage of design,and a construction contingency to account for unforeseen issues during construction. Deliverable(s) • Preliminary Plans—PDF(CD)and five sets of 11-inch by 17-inch hard copy.(Delivered to the AGENCY within 6 months post-NTP) • Specification Outline—PDF(CD)and photo-ready hard copy.(Delivered to the AGENCY within 6 months post-NTP) • Preliminary Opinion of Cost—PDF(CD)and hard copy.(Delivered to the AGENCY within 6 months post- NTP) Task 8—Environmental Assistance (Notice to Proceed through June 30. 2018) To provide information to the AGENCY's Environmental Consultant(under a separate contract)for completion of a SEPA checklist. Approach Under a separate contract,the Environmental Consultant shall prepare a SEPA environmental checklist for the AGENCY's use in obtaining SEPA approvals.The CONSULTANT shall assist this effort by providing information for the checklist.The CONSULTANT shall coordinate with the Environmental Consultant to determine the method and timing of the delivery of project information. Assumption(s) • A determination on non-significance is anticipated for this project. • The Environmental Consultant shall notify the CONSULTANT of what information is needed for the Environmental Consultant to complete the SEPA checklist.Ten hours of Project Engineer and 4 hours for Project Manager are included in the scope. • Ten hours for graphics for the Environmental Consultant is included in the Scope. • The AGENCY will be responsible for obtaining all environmental documentation and permits if required by the project. Deliverable(s) • Graphic and project information support for the Environmental Consultant.(Delivered to the Environmental Consultant within 4 weeks of request). City of Renton 214-1779-045 Duvall Avenue NE Improvements: 12 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) Task 9—Bid Documents(12 months post-NTP through 24 months post-NTP) Goal(s) To provide a complete package of bid-ready documents.Modified: The bid package also includes Schedule B and C project areas, which are described in the modified scope changes above. Assumption(s) • Up to 33 plan sheets(Modified:53 plan sheets)will be included in the 90 percent, 100 percent,and Mylar submittals: > Cover and Sheet Index(one sheet). > Legend and Abbreviations(one sheet). > Typical Sections(two sheets).Modified:(three sheets) > Right-of-Way,Alignment,and Site Preparation Plans(four sheets). > Plan and Profile Sheets(five sheets).Modified:(six sheets) > Storm Drainage Plans and Details(three sheets).Modified:(seven sheets),includes new water service plan and details. > Wall Plan(two sheets). > Wall Profiles(two sheets). > Roadway and Wall Details(three sheets). > Channelization,Signing,and Illumination(three sheets).Modified:(four sheets), channelization and signing only. > Modified:Electrical,including illumination,signal, and ITS(six sheets). > Modified:Traffic Signal Details(two sheets). > Intersection Grading Details(1 sheet).Modified:(two sheets) > Modified:Grading Tables(one sheet). > Franchise Utility Conflict Plans(two sheets). > Planting Schedule,Plans,and Details(four sheets).Modified:(five sheets) > Modified:Irrigation Plans and Details(2 sheets). • Only one type of wall will be evaluated. • All work will be constructed within existing right-of-way.Modified:Some work will be constructed outside of existing right-of-way. • Sign specifications will be shown on Signing Plans. No sign schedule will be required. • The Franchise Utility Conflict Plans will be prepared for the AGENCY to forward to all franchise utility companies within the project area.The AGENCY shall be responsible for coordination with these companies for relocation efforts,if necessary. One utility coordination meeting is included.The meeting shall be at City Hall and arranged by the AGENCY. City of Renton 214.1779-045 Duvall Avenue NE Improvements: 13 January 2018 NE 10th Street to Sunset Boulevard SCOPE OF WORK(continued) Deliverable(s) • 90 Percent Review Plans—PDF(CD)and five sets of half-size plans for AGENCY review.(Delivered to the AGENCY within 12 months post-NTP) • 90 Percent Review Project Bid Documents—PDF(CD)and five paper copies for AGENCY review. (Delivered to the AGENCY within 12 months post-NTP) • 90 Percent Review Opinion of Cost—PDF(CD)and five paper copies for AGENCY review.(Delivered to the AGENCY within 12 months post-NTP) • Maximum Extent Feasible Documentation(if needed) • Responses to City Review comments from previous submittals • Submittal list to assist the AGENCY with project submittals during construction.(Delivered to the AGENCY within 12 months post-NTP) • 100 Percent Plans—One set of full-size paper plans and AutoCAD files for AGENCY's project manager check print review.(Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments) • 100 Percent Bid Documents—One set of photo-ready specifications for AGENCY's project manager check print review.(Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments) • Contract Documents—Upload to online Builders Exchange of Washington(BXWA)(plans/specifications in PDF format).(Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments) Task 9— Bidding Assistance (9 months post-NTP through July 31, 2018) Goal(s) To provide assistance to the AGENCY during the biding phase of the project. Assumption(s) • Up to four RFI responses(via email)and two Addenda will be prepared during the bidding phase. • The bidding phase will last 3 weeks between Construction Advertisement and Bid Opening. Deliverable(s) • Four email responses to Contractor request for information.(Delivered to the AGENCY within 10 months post-NTP) • Two addenda in PDF format.(Delivered to the AGENCY within 10 months post-NTP) • Bid tabs,debarment,analyze for unbalanced bids. City of Renton 214-1779-045 Duvall Avenue NE Improvements: 14 January 2018 NE 10th Street to Sunset Boulevard al il o co Project Manager Cn 1 II 1111 II 111111 11111111 I 11 III II 111 111 I IIII 11111 II I l':' Shc ' : II 1111 II 11111111 11111111 II II III II III 111 I 1111 11111 II 1 1E g ee Kende ead Grace iI . 6', De"g e tterY RonOe CM Imago Bennett PG, ng ucas c.P Landscape Darren 3 CI 70 89 8` H ;"*ENDOpc�$11'1 m D a u �m -/ -4, 9 A n • a ' m C V 0 y m m _ `m' 2 CD me N 3 i m cCi Dnp m 0 N le- 3 c 7 m D M m Z CPJ 9 m cr 0 ? N a o O CA Cit E .„ •'.� :§1 N �^ -E-gN;N:"Eili j CT ml a Project rw Mager N SranCndy u v c'Consutant Crack :'-'110A/0C Chuck ti ''Sr Engineer 5 n tt d,l 8 ead[Design Marc w jEngineer Kendall Lead Grace a o o Designer Amuncsen Lead Mallory m Ueelgner Wilde ^Stor water Jack u v m Engineer Wright Ronnie u W CM Manager Penner( N ^ Survey Jared $ a Supervisor Kremiti �1 Scot w $4ISurveyor 1II Spees Adam ->Sur erynr II BeaupreZ n Word Amanda ur w Processing Lucas Mi `Landscape Darren n m Design Sandeno 1Project Lauren m5Coerdinalor Jones H-7 mlStructurat o SC Engineer Joe Merth u Project Michelle m n SC Accountant Liangi b S0 A m c 0 0 A b ,r a C Aa N N