Loading...
HomeMy WebLinkAboutAdden 3I r llki� CITY OF RENTON Department of Planning /Building /Public Works CONTRACT CHANGE ORDER AGREEMENT CAG -02 -002 Adden #3 -03 C.O.# 9 Page 1 of 1 CONTRACT: SR 900 - South 2nd Street Traffic Signal Safety CAG -02 -002 Federal Aid Project No.AC -STPH- 0900(015) CEO FFe AFC CONTRACTOR: Totem Electric of Tacoma, Inc. 8 43 SUMMARY OF PROPOSED CHANGE: rranspO7ati°° Syste The contractor had to remove a portion of a abandoned building foundation in order to place signal Pole No. 4 located at the SE corner of S. 2nd and Williams Avenue South. The contractor had to rent additional equipment to do this work. Add the new bid item to the schedule of nrires Item No. Approx I Quantity Units Description Unit Price Amount A8 1 LS Force Account, remove concrete $ 1,811.76 $ 1,811.76 foundation, SE corner S. 2nd and Burnett Avenue South Subtotal $ 1,811.76 This item is to include any and all costs incurred for additional work approved. No additional payment will be made for this work. The attached details shall be a part of this Change Order. All work, materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE $208,910.00 $252,182.00 $1,811.76 $253,993.76 SIGNATURES: Contractor: Project Manager: Approved By: Approved By: Sandra Meyer (Transportation Systems Division Director) Date: Date: � Date: '7 y Date: A ! ?�