HomeMy WebLinkAboutCO 1CITY OF RENTON CAG - - -034 Adden #1-02 + CITY OF RENTON FEB Q 6 2003 '� Public Works Department J CITY C�ERKISOFFICECONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 02 -034 EAST KENNYDALE SANITARY SEWER INFILL & C.O.# 1 WATER MAINREPLACMENT CONTRACTOR: FRANK COLUCCIO CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 038. NEW ITEM: Extra Work Items per Contractors Force Account Orders: LS S -2 #1- Remove Conc. Slab at Sta. 1 +17 Monterey Ct. NE ($830.98) S -2 #2- Telephone Pedestal Crossing at 1700 Monterey Ct. NE ($1,267.54) S -2 #3.1 -Side sewer realignment at MH #6. ($2,726.84) S -2 #3.2- Rechannel MH #6. ($327.64) S -4 #1.1 -Extra work for realignment of Sewer on NE 18th St. ($2,974.54) S -4 #1.2 -Extra work for realignment of Sewer on NE 18th St. ($2,073.13) S -4 #1.3 -Extra work for realignment of Sewer on NE 18th St. ($4,518.97) S -4 #1.4 -Extra work for realignment of Sewer on NE 18th St. ($1,310.52) S -5 #1 -Pwr Pole support @ 3 +25 Camas Ave NE ($2,415.53) S -5 #2 - Revise sewer stub from MH #11 to 1824 Camas Ave NE ($4,977.65) S -5 #3 - Rechannel MH #11 ($531.79) S -5 #4 - Install new CB @ Sta 1 +40 Camas Ave NE ($1,706.04) S -7 #1 -Demo Conc. @ unknown C.O. @ Sta. 1 +38 Dayton Ave NE ($1,560.92) S -7 #2 - Set -up temp. mail boxes for Dayton Ave NE (1,191.84) S -8 #5'J - Repair Riser of CB intersection NE 24th & Monterey Ave NE ($181.85) S -8 #2 - Conflict with Ex. Storm and new San. main on Monterey ($22,581.82) S -8 #3 -Pwr Pole support for side sewer @ 2447 Monterey ($7,855.44) S -8 #4 - Remove Stump between 2435 & 2441 Monterey ($2,586.11) S -8 #5 - Conflict with Sewer and Storm @ Sta 3 +93 Monterey ($8,985.10) S -8 #6 - Set -up temp. mail boxes for Monterey Ave NE ($843.00) 039. NEW ITEM: Install 24" Storm Sewer on Monterey Ave NE (includes 5% for bond): LF Sub Total Sales Tax (8.8 %) $71,447.24 71,447 297 $105.00 $31,185.00 $102,632.24 $9,031.64 Total $111,663.88 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $1,030,126.02 $1,030,126.02 $111,663.88 $1,141,789.90 SIGNATUR Contractor: Project Eng Approved H: Divisions \Uti Ities \W astewtr\aberdeen \CO -6 /J D H Date: /D 2 Z_ Date: /o 7- C7 Date: 6 Z