Loading...
HomeMy WebLinkAboutAdden 1 CAG-02-072 `..+ ADDENDUM #1 POLICE EVIDENCE VEHICLE STORAGE BUILDING The Addendum forms part of the Contract Documents and modifies the original Documents dated as: AIA Document A101-1997, Standard Form of Agreement Between Owner and Contractor: June 20, 2002 If in conflict with previously issued Contract Documents, this Addendum will supplement and supercede applicable portions of the Contract Documents and shall be reflected in all Proposals. Modifications to Paragraph 5.2.2 REPLACE: 5.2.2. The Owner's final payment to the Contractor shall be made no less than 30 days after the issuance of the Owner's final Certificate for Payment, or as follows: WITH: 5.2.2. The Owner's final payment to the Contractor shall be made no less than 30 days after the issuance of the Owner's final Certificate for Payment, or as follows: except for retainage which will be paid when all claims have been satisfied, paid or dismissing or no claims have been files within the statutory period. END OF ADDENDUM #1 gerue,,,a) "7/24 z_ (0-a_ (02— Charles Grouws, President date Ryan Gro.w., Proj=ct Manager date CHG Building Systems, Inc. CHG Buildin• Syste �s, Inc. 2002-144aa