HomeMy WebLinkAboutAdden 1 '*We CITY OF RENTON SW10 CAG-02-119 Adden #1-02 CHANGE ORDER DEC 2 0 2002 OWNER City of Renton CITY OF RENTON RECEIVED CONTRACTOR Clement Bros,Inc. CITY CLERKS OFFICE Project Name Coulon Play Area Improvements Project Address 1201 Lake WA Blvd. N. Renton,WA 98055 Date 16-Dec-02 Change order No.: 1 Contractor Name: Clements Brothers, Inc. &Address P.O. Box 7964 City CAG No.: CAG-02-119 Bonney Lake,WA 98390 Contract For: 316.000000.020.5940.0076.64.020038 The Contract is hereby amended as follows: 1)Reroute electrical for lighting Add $2,676.50 2)Irrigation modifications Add $983.44 3)Concrete pad&entry Add $2,621.76 4)Transplant/relocate existing plants and water Add $181.28 5) Retaining wall at bench pad Add $623.15 6) Remove and haul pine trees Add $3,409.53 7)Additional catch basins Add $1,699.50 8)Dump sand on beach/stockpile area; haul away remaining waste dirt Add $9,432.16 9)Cut down curbs at play area;install new concrete pads Add $2,492.60 Subtotal $24,119.92 Washington State Sales Tax at 8.8% $2,122.55 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................... Add $26,242.47 The change order shall include all Contractor(s) labor, material,overhead, profit, and all direct and/or indirect costs allocated with the Change in Scope of Work. Excluding Bond Premiums. This Change Order is not valid unless signed by the Owner and Contractor The original Contract Sum was ..................................................................................... $102,860.61 Net Change by previously authorized Change Order(s)was ............................................. $0.00 The Contract Sum prior to this Change Order was........................................................... $102,860.61 The Contract Sum will be revised by this Change Order in the amount of .......................... $26,242.47 The new Contract Sum incorporating this Change Order will be........................................ $129,103.08 The Contract Time will be changed by ............................. ....... .................. .. .. .......... 3 ays The Substantial Completion Date including this Change Order is ...................................... NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by Construction Change Directive or Field Directive forms. OWNER CONTRACTOR City of Renton Clements Brothers,Inc. Community Services Dept. P.O. Box 7964 1055 South Grady way Bonney Lake,WA 98390 Renton,Washington 98055 Date Date �a/0 2002-320aa