HomeMy WebLinkAboutAdden 4 CAG-02-148 Adden #4-03
CHANGE ORDER`"
OWNER City of Renton
CITY OF RENTON CONTRACTOR Mr.Irrigation
Project Name Highlands Park Irrigation
Project Address 800 Edmonds Ave. NE
Renton,WA 98056 Date 10-Apr-03
Change order No.: 4
Contractor Name: Mr.Irrigation
&Address 3620 54th Ave. E City CAG No.: CAG-02-148
Fife,WA 98424 Contract For: 316.000000.020.5940.0076.63.000001
The Contract Is hereby amended as follows:
1)Cost to connect old quick couple on infield. $120.00
2)Install 8-inch PVC sleeves with pea gravel,filter fabric,and infield silt for all heads $250.00
In infield.
3) Repair old break in planter area. $75.00
Subtotal Add $445.00
Washington State Sales Tax at 8.8% $39.16
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................... Add $484.16
The change order shall include all Contractor(s) labor, material,overhead, profit,and all direct and/or indirect costs
allocated with the Change in Scope of Work. Excluding Bond Premiums.
This Change Order is not valid unless signed by the Owner and Contractor
The original Contract Sum was ..................................................................................... $58,580.80
Net Change by previously authorized Change Order(s)was ............................................. $10,564.53
The Contract Sum prior to this Change Order was........................................................... $69,145.33
The Contract Sum Will be revised by this Change Order in the amount of.......................... $484.16
The new Contract Sum incorporating this Change Order will be........................................ $69,629.49
The Contract Time Will be changed by .......................................................................... 123 days
The Substantial Completion Date including this Change Order is ...................................... April 20,2003
NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved
by Construction Change Directive or Field Directive forms.
OWNER CONTRACTOR
City of Renton Mr.Irrigation
Community Services Dept. 3620 54th Ave. E
South Grady way Fife,WA 98424
e tones Washingt 055
CIO
D e 4 L%!!! 3 Date
U
2003-079aa
04,111/2003 01: 52 2539260339 PAGE 01
Cam:I
*mole
MR. IRRIGATION 3620 54TH Ave E
Tacoma WA. 98424 i
Change Order
To Bill RasMussen
Thursday.April 10,2003
Irrigation Repair
Highlands park irrigation project
Mr. Irrigation and the City of Renton
1 Cost to connect old quick couple on infield 120-00
2 Install 8-inch PVC sleeves with pea gravel, filter fabric, and
infield silt for all heads in infield :$250.00
3 Repair old break in planter area. 75.00
Sub total :112445-00
blast 39,16
Total ;L$4.16
Mr. Irrigation s C) f cso Date 0