HomeMy WebLinkAboutAdden 1 CAG-' .148 Adden #1-03' CITY OF RENTON �"""'`` CHANGE ORDER JAN 1. 7 2003 OWNER City of Renton CITY OF RENTON RECEIVED CONTRACTOR Mr.Irrigation CITY CLERK'S OFFICE Project Name Highlands Park Irrigation Project Address 800 Edmonds Ave. NE Renton,WA 98056 Date 10-Jan-03 Change order No.: 1 Contractor Name: Mr.Irrigation 8,Address 3620 54th Ave. E City CAG No.: CAG-02-148 Fife,WA 98424 Contract For: 316.000000.020.5940.0076.63.000001 The Contract is hereby amended as follows: 1)Remove and replace all existing impact and rotor heads(except four(4)heads Add $4,700.00 east of the asphalt path included as part of the Base Contract),including swing joint riser assemblies,revised and/or additional piping,trenching,and restoration of sod and/or planting beds disturbed by this work. 2)Remove,add and/or adjust rotor heads including swing joint riser assemblies, Add $2,800.00 revised or additional piping,trenching,and restoration of sod and/or plant beds disturbed by this work. 3)Add one(1)catch basin and piping to correct a minor drainage condition Add $960.00 near third base on ballfield as directed by Park Department staff. Subtotal $8,460.00 Washington State Sales Tax at 8.8% $744.48 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................... Add $9,204.48 The change order shall include all Contractor(s)labor, material,overhead, profit,and all direct and/or indirect costs allocated with the Change in Scope of Work. Excluding Bond Premiums. This Change Order is not valid unless signed by the Owner and Contractor The original Contract Sum was ..................................................................................... $58,580.80 Net Change by previously authorized Change Order(s)was ............................................. $0.00 The Contract Sum prior to this Change Order was........................................................... $58,580.80 The Contract Sum will be revised by this Change Order in the amount of.......................... $9,204.48 The new Contract Sum incorporating this Change Order will be........................................ $67,785.28 The Contract Time will be changed by .......................................................................... 51 days The Substantial Completion Date including this Change Order is ...................................... February 7,2003 NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by Construction Change Directive or Field Directive forms. OWNER CONTRACTOR City of Renton Mr.Irrigation Community Services Dept. 3620 54th Ave. E 1055 South Grady way Fife,WA 98424 enton,Washington 98055 to Date 2003-006aa 0,1/10/2003 07:11 2539260?-'9 PAGE 01 4 TO l � aSj'''1 rJSS en I MR . l RR 1 GAT l ON Request for Proposal 3 62 0 54TH AVE . E F1 FE WA 98424 IRRIGATION MODIFICATIONS C Q 5 3)4 0 5 1759 Highlands Park Irrigation Project Mr. Irrigation and the City of Renton, Contract dated October 29, 2002 Please state the amounts to accomplish changes to the original s pe of work. Changed work is described on the drawings named IRRIGATION LAN — COP BID DOCUMENTS Sheet L-1 C.2 revision dated 12-27-2002). 1 tallation shall conform to details and specifications contained in the Base Cont t Documents. COP # 1: Remove and replace all existing impact and rotor head (except (4) heads east of the asphalt path included as a part of the Base Co ct), including swing joint riser assemblies, revised and /or additional piping, tre' ching, and restoration of sod and /or planting beds disturbed by this work, al described within the boundary Limit pf,Change Order# 1 Line The Contract Sum (including WSST) will be (increased) (decreas . ) (unchanged) by COP# 1 by the amount of: $ COP # 1 will (increase) (decrease) (not change) the Contract Tim by ---- days. COP # 2: Remove, add and / or adjust rotor heads including ing joint riser assemblies, revised or additional piping, trenching, and sibration of sod and / or plant beds disturbed by this work all described hin the boundary Limit of Chance Order# 2 Line The Contract Sum (including WSST) will be (increased) (decreas (unchanged) by COP #2 by the amount of COP # 2 will (increase) (decrease) (not change) the Contract Tim by days. i 4 01/10/2003 07:11 25392603/9 PAGE 02 2SAVU A'7 r December 27,2002 Request for Proposal Page2 Renton Highlands Park Irrigation Project AIR . IRRIGATION 3620 54TN AVE . E i FI EE WA 96424 C( 253 ) 4051759 i COP #3: Add (1) one catch basin and piping to correct a minor d nape condition near 3' base as field directed by Park Department Staff. The Contract Sum-(including WSST) will be (increased) (decreas , (unchanged) by COP # 3 by the amount of $ COP #3 will (increase) (decrease) (not change) the Contract Time '.Time days. The Contractor, Mr. Irrigation agrees to provide the services descri above for the specified amounts, and times subject to written Change Order , thorization by the Owner, the City of Renton. Signed Mr. Irrigation by:. CC7/I ec e e 460 Dated _ 7 .7 i i ; a