HomeMy WebLinkAboutAdden 1 CAG-' .148 Adden #1-03' CITY OF RENTON �"""'``
CHANGE ORDER
JAN 1. 7 2003 OWNER City of Renton
CITY OF RENTON RECEIVED CONTRACTOR Mr.Irrigation
CITY CLERK'S OFFICE
Project Name Highlands Park Irrigation
Project Address 800 Edmonds Ave. NE
Renton,WA 98056 Date 10-Jan-03
Change order No.: 1
Contractor Name: Mr.Irrigation
8,Address 3620 54th Ave. E City CAG No.: CAG-02-148
Fife,WA 98424 Contract For: 316.000000.020.5940.0076.63.000001
The Contract is hereby amended as follows:
1)Remove and replace all existing impact and rotor heads(except four(4)heads Add $4,700.00
east of the asphalt path included as part of the Base Contract),including
swing joint riser assemblies,revised and/or additional piping,trenching,and
restoration of sod and/or planting beds disturbed by this work.
2)Remove,add and/or adjust rotor heads including swing joint riser assemblies, Add $2,800.00
revised or additional piping,trenching,and restoration of sod and/or plant
beds disturbed by this work.
3)Add one(1)catch basin and piping to correct a minor drainage condition Add $960.00
near third base on ballfield as directed by Park Department staff.
Subtotal $8,460.00
Washington State Sales Tax at 8.8% $744.48
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................... Add $9,204.48
The change order shall include all Contractor(s)labor, material,overhead, profit,and all direct and/or indirect costs
allocated with the Change in Scope of Work. Excluding Bond Premiums.
This Change Order is not valid unless signed by the Owner and Contractor
The original Contract Sum was ..................................................................................... $58,580.80
Net Change by previously authorized Change Order(s)was ............................................. $0.00
The Contract Sum prior to this Change Order was........................................................... $58,580.80
The Contract Sum will be revised by this Change Order in the amount of.......................... $9,204.48
The new Contract Sum incorporating this Change Order will be........................................ $67,785.28
The Contract Time will be changed by .......................................................................... 51 days
The Substantial Completion Date including this Change Order is ...................................... February 7,2003
NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved
by Construction Change Directive or Field Directive forms.
OWNER CONTRACTOR
City of Renton Mr.Irrigation
Community Services Dept. 3620 54th Ave. E
1055 South Grady way Fife,WA 98424
enton,Washington 98055
to Date
2003-006aa
0,1/10/2003 07:11 2539260?-'9
PAGE 01
4
TO l � aSj'''1
rJSS en
I
MR . l RR 1 GAT l ON Request for Proposal
3 62 0 54TH AVE . E
F1 FE WA 98424 IRRIGATION MODIFICATIONS
C Q 5 3)4 0 5 1759 Highlands Park Irrigation Project
Mr. Irrigation and the City of Renton,
Contract dated October 29, 2002
Please state the amounts to accomplish changes to the original s pe of work.
Changed work is described on the drawings named IRRIGATION LAN — COP
BID DOCUMENTS Sheet L-1 C.2 revision dated 12-27-2002). 1 tallation shall
conform to details and specifications contained in the Base Cont t Documents.
COP # 1: Remove and replace all existing impact and rotor head (except (4)
heads east of the asphalt path included as a part of the Base Co ct), including
swing joint riser assemblies, revised and /or additional piping, tre' ching, and
restoration of sod and /or planting beds disturbed by this work, al described
within the boundary Limit pf,Change Order# 1 Line
The Contract Sum (including WSST) will be (increased) (decreas . )
(unchanged) by COP# 1 by the amount of: $
COP # 1 will (increase) (decrease) (not change) the Contract Tim by ----
days.
COP # 2: Remove, add and / or adjust rotor heads including ing joint
riser assemblies, revised or additional piping, trenching, and sibration of
sod and / or plant beds disturbed by this work all described hin the
boundary Limit of Chance Order# 2 Line
The Contract Sum (including WSST) will be (increased) (decreas
(unchanged) by COP #2 by the amount of
COP # 2 will (increase) (decrease) (not change) the Contract Tim by
days.
i
4
01/10/2003 07:11 25392603/9
PAGE 02
2SAVU A'7
r
December 27,2002 Request for Proposal Page2
Renton Highlands Park Irrigation Project
AIR . IRRIGATION
3620 54TN AVE . E i
FI EE WA 96424
C( 253 ) 4051759
i
COP #3: Add (1) one catch basin and piping to correct a minor d nape
condition near 3' base as field directed by Park Department Staff.
The Contract Sum-(including WSST) will be (increased) (decreas ,
(unchanged) by COP # 3 by the amount of $
COP #3 will (increase) (decrease) (not change) the Contract Time
'.Time
days.
The Contractor, Mr. Irrigation agrees to provide the services descri above for
the specified amounts, and times subject to written Change Order , thorization
by the Owner, the City of Renton.