HomeMy WebLinkAboutAdden 1 CITY OF RENTOIN CHANGE ORDER OWNER MAR 2 6 ?(,Ili ARCHITECT RECFIVED CITY OF RENTON CONTRACTOR UI I Y LERK'S OFFICE Project Name CART PATH PAVING Project Address 4050 MAPLE VALLEY HWY RENTON,WA 98058 Date 18-Nov-02 Change order No.: 1 Contractor Name: NW ASPHALT, INC &Address City CAG No.: 02-166 RENTON,WA 98057 Contract For: CART PATH PAVING The Contract is hereby amended as follows: 1)ADDITIONAL PAVING I OF CART PATH AREAS Add $3,299.83 2) Add 3) Deduct Subtotal $3,299.83 Washington State Sales Tax at 8.8% $290.39 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER...................................... Add $3,590.22 The change order shall include all Contractor(s)labor, material,overhead,profit,and all direct and/or indirect costs allocated with the Change in Scope of Work. Excluding Bond Premiums. This Change Order is not valid unless signed by the Owner and Contractor The original Contract Sum was ..................................................................................... $42,668.51 Net Change by previously authorized Change Order(s)was ............................................. $0.00 The Contract Sum prior to this Change Order was........................................................... $42,668.51 The Contract Sum will be revised by this Change Order in the amount of .......................... $3,590.22 The new Contract Sum incorporating this Change Order will be ........................................ $46,258.73 The Contract Time will be changed by .......................................................................... 0 days The Substantial Completion Date including this Change Order is ...................................... NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by Construction Change Directive or Field Directive forms. OWNER CONTRACTOR ARCHITECT City of Renton Community Services Dept. 1055 South Grady way Renton,Washington 98055 &� —S— Date Date Date