Loading...
HomeMy WebLinkAboutAddendum - 1AMENDMENT NO. 1 TO AGREEMENT FOR RENTON GATEWAY PLANTING DESIGN THIS AMENDMENT, dated for reference purposes only as February 23, 2024, is by and between the City of Renton (the “City”), a Washington municipal corporation, and AHBL, Inc (“Consultant”), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-23-206, dated December 22, 2022, to provide necessary services for the Gateway Planting Design (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the compensation in order to coordinate with Western Neon for artwork design and incorporation into the roundabouts. NOW THEREFORE, It is mutually agreed upon that CAG-23-206 is amended as follows: 1.Scope of Work: Section 1, Scope of Work, is amended by adding Tasks 47, 48, 49 and amending Task 90 as specified in Exhibit A-1, which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $7,360 from $46,950.00 to $54,710, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-1 which is attached and incorporated herein. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. ** SIGNATURE PAGE TO FOLLOW ** CAG-23-206, Adden #1-24 PAGE 2 OF 2 CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Brianne Bannwarth Interim CED Administrator Kristin Kildall Landscape Architect, AHBL _____________________________ Date _____________________________ Date Approved as to Legal Form By: __________________________ Patrice Kent Senior Assistant City Attorney Contract Template Updated 06/17/2021 (h/contract/2022/2273/Amend1) Craig Skipton Director of Landscape Architecture 2024-03-0603-12-2024 Civil Engineers Structural Engineers Landscape Architects Community Planners Land Surveyors Neighbors SEA T TL E 1200 6th Avenue Suite 1620 Seattle, WA 98101-3123 206.267.2425 TEL www.ahbl.com January 19, 2024 Samuel Stolmeier Construction Engineer City of Renton 1055 South Grady Way, 6th Floor Renton, WA 98057 Project: Renton Gateway Planting Design, AHBL No. 2220631.40, Tasks 47-49 Subject: Proposal for Landscape Architecture Lighting and Art Coordination Services Dear Sam: We are excited to continue working with your team at City of Renton and further develop the Renton Gateway roundabouts. Our understanding of the project is based on our conversations regarding art coordination. Overarching project assumptions and understanding of scope: •The scope of work for this project will begin after the completion of the Washington State Department of Transportation (WSDOT) I-405/Renton to Bellevue Widening and Express Toll Lanes Project at the Exit 7, 44th Street Interchange, and no coordination with WSDOT will be required to complete this art installation and lighting project. •Because this project occurs in the public right-of-way, it will be designed to meet City of Renton Public Works standards. •Project team to include City of Renton Planning and Public Works departments. •We understand that areas of scope are limited to: o Areas indicated on attached Exhibit A1.WHICH IS THE SAME AS EXHIBIT A1 TO EXHIBIT A OF THE ORIGINAL AGREEMENT o In those areas, AHBL will coordinate art design and installation with Subconsultant Western Neon. •We will address from Preliminary Design through the Construction phase: o Art coordination by Western Neon. •No permit submittals are required for this project. •We will provide an art plan via Western Neon. •We will use as-built sleeving provided by WSDOT. •Art element shop drawings, fabrication, transportation, and installation are not included in this contract. Our detailed scope of work is listed below. EXHIBIT A-1 (CAG 23-206 Amend 1) Page 1 of 6 Samuel Stolmeier January 19, 2024 2220631.40, Tasks 47-49 Page 2 of 4 Art Coordination – Task 47 1.Coordinate with Western Neon on concepts for two primary and one secondary art element. 2.Coordinate with project team members regarding art element preferences for the project. 3.Revise construction documents with planting design revisions, art element and base locations, and coordinate with Public Works. 4.Attend online project meetings/conference calls: a.Project team meetings – four meetings. Art Element Concept Design (by Subconsultant) – Task 48 5.Western Neon will provide art design services as a subconsultant to AHBL. The fee below includes a 15% markup. The Western Neon proposal is also attached. a.Initial concepts for two primary and one secondary art element with four rounds of revisions. b.Conduct code research. c.Provide an estimate for fabrication, transportation, and installation. Art Design Bidding/Construction Phase Services – Task 49 6.Assist the owner and the architect with answering bidders’ questions for clarification and assist in the preparation of bid addenda. This task allows 2 hours. 7.Respond to contractor-initiated questions (RFIs) during construction as they relate to the design. 8.We will review art element shop drawings and report findings to the project team. 9.This task allows for a total of two site visits for art coordination: a.One site inspection (including site observations with report) during construction to ensure the intent of the design is being met, including art element placement and lighting placement. b.One site visit post construction (one punchlist visit and one follow-up/back-punch visit). 10.Prepare final letter of substantial project conformance/completion. This scope of work will be billed on a time and expense basis, with an estimate provided below. Reimbursable Expenses – Task 90 (ADDITIONAL EXPENSES NOTED BELOW) 11.Reimbursable expenses such as mileage and reprographics. This scope of work will be billed on a time and expense basis, with an estimate provided below. EXHIBIT A-1 (CAG 23-206 Amend 1) Page 2 of 6 Samuel Stolmeier January 19, 2024 2220631.40, Tasks 47-49 Page 3 of 4 Billing Summary Items Description Task No. Amount Items 1-4 Art Coordination T-47 $3,400 Item 5 Art Element Concept Design (by Subconsultant) T-48 2,410 Items 6-10 Art Design Bidding/Construction Ph. Svcs. (T&E est.) T-49 1,500 Item 11 Reimbursable Expenses (T&E est.) T-90 50 Total $7,360 You may not want us to provide some of the services listed above. We can discuss these services and the number of hours with you and make adjustments, as necessary. Some of the tasks listed are influenced by factors outside of our control. Based on our experience, we have estimated the number of hours required to complete these tasks. During the course of the project, if it is determined that more hours are required to complete any of these tasks due to circumstances outside of our control, we will notify you immediately. We will not perform additional work until we have your written authorization. The task numbers on the invoice will correlate with this proposal. Exclusions This proposal does not include fees associated with agency reviews, submittals, or permits, nor does it include any work associated with the following services: a) Professional services of subconsultants, e.g., arborist, geotechnical and traffic engineers, or wetlands, wildlife, and other specialists, if required by the review agency. b) Preparation, submittal, or securing of permits including, but not limited to: 1) Forest Practices Applications or permits from the Department of Natural Resources for logging operations. 2) National Pollutant Discharge Elimination Systems Baseline General Permits or the associated Notice of Intent from the Department of Ecology for stormwater discharge to surface waters. 3) Hydraulic Permit Applications from the Washington State Department of Fish and Wildlife for work in stream buffers or floodplain areas. c) Preparation, submittal, or securing of extensions or renewals for expiring or expired applications or permits. Monitoring of applications or permit expiration dates is the responsibility of others. d) Environmental impact statement. e) Costs associated with the excavation of soils logs for the evaluation of onsite soils. f) Offsite improvements. g) Design of retaining wall features in excess of 3 feet or miscellaneous site features, unless otherwise noted. h) Wetland mitigation design and monitoring. EXHIBIT A-1 (CAG 23-206 Amend 1) Page 3 of 6 Samuel Stolmeier January 19, 2024 2220631.40, Tasks 47-49 Page 4 of 4 i)Costs associated with reconsiderations of agency decisions. j)Costs associated with preparing and filing variances, etc. k)Costs associated with the publication of legal notices in the newspaper. l)Costs associated with the preparation and installation of public notice signs. m)Costs associated with title reports or other legal documents. n)Costs associated with substantial redesign after preparation of design development drawings. o)Preparation of maintenance manuals, reports, or certification testing of installed improvements. p)Additional inspections that are a result of contractor non-compliance to the plans or specifications. q)Development of an opinion of probable construction costs, except where noted above. r)Preparation of documents using metric units of measure. s)Dividing the design work into more than one phase of work. Although we do assist the owner during the construction process, this proposal is for design services only and in no way implies we are construction managers. If you find this proposal acceptable, please prepare your standard contract. Our receipt of the signed contract or your written authorization will be our notification to proceed. If you have any questions, please call me at (206) 267-2425. Sincerely, Kristin Kildall Senior Landscape Architect KK/lsk Enclosures c: Craig Skipton - AHBL Accounting Q:\2022\2220631\Proposals_Contracts\Finals\20240119 Pro (T47-49) 2220631.40.docx EXHIBIT A-1 (CAG 23-206 Amend 1) Page 4 of 6 1200 6th AvenueSuite 1620Seattle, WA 98101206.267.2425 TEL206.267.2429 FAXRENTON GATEWAY PLANTING DESIGNSCOPE OF WORK AREASEXHIBIT A1Scope of work areasEXHIBIT A-1 (CAG 23-206 Amend 1)Page 5 of 6 PROPOSAL Date 11/29/2023 Invoice # 32714 Bill To AHBL Inc C/O Kristin Kidall 2215 N 30th St, Suite 200 Tacoma, WA 98403 Job Location City of Renton 10555 S Grady Way Renton, WA 98057 P.O. No.Terms Net Due Due Date 11/29/2023 Rep DWN Total Balance Due Subtotal Sales Tax (10.25%) DateSignature Warranty - Products manufactured by Western Neon are covered under a 2-year limited warranty initiated on receipt of final payment. Disclaimer - Requirements prior to the start of production: approved design, signed contract, 50% deposit as well as any necessary permits, building owner or officiating committee approvals, and engineer’s stamp if needed. All deposits are non-refundable. Credit Card payments exceeding $2,500 are subject to a 3% processing fee. Shipping - Buyer assumes all physical, conditional, and financial responsibility of any project, product or package that leaves Western Neon’s premises. Should any damages occur in shipment, it is the Buyer’s sole responsibility to file claim with carrier. WESTERN NEON 206.682.7738 | WESTERNNEON.COM 2902 4TH AVE S. SEATTLE, WA 98134 Thank you for partnering with Western Neon. We work our best working with you and look forward to delivering the highest quality products, service, and value we can across your experience with us. DescriptionQuantity Price Each Amount Design Fee - Provides initial concepts, 4 rounds of revisions, code research and project estimate 20 95.00 1,900.00T $2,094.75 $2,094.75 $1,900.00 $194.75 EXHIBIT A-1 (CAG 23-206 Amend 1) Page 6 of 6