CONSTRUCTION MITIGATION DESCRIPTION
September 11, 2023
1. The proposed construction start date will approximately be in Winter 2023 and
Completion will be in approximately 6 months.
2. Hours of operation will be 7:00 AM to 5:00 PM.
3. Proposed hauling/transportation route will be 156th Avenue SE to NE 4th Street. Then NE 4th
Street to Duvall Avenue then Duvall Avenue to Sunset Blvd. Then Sunset Blvd to the Renton
Transfer Station.
.
4. Water trucks, street sweepers and other requirements deemed necessary will be
implemented for any potential impacts which may occur.
5. There will be no anticipated weekend, late night, or any other specialty hours
proposed at this time for construction or hauling.
6. Flag persons will be employed, and signs will be installed for traffic control when
necessary.
7. Temporary erosion control measures will be used as shown on the Temporary Erosion
Control plan.