Loading...
HomeMy WebLinkAboutR-4001580 0 v 0 a 0 n r. v / TSA TSA TSA TSA GEASPA GT .S. TSA TSA P /E TSA UGH CABLE NORTH OF HERE TO PHASE 3�PHASE Tv REMAIN AS-3� F F SIGN:"B" CONIC.SIGN:"B" E � / 2 F T F %� 1 T46 —� �--p P-L�P P� �pp/PP�P P PSP P�P P--- A o p p o —P�� P M� T43 �eTas F P Pte_ 29+00 TAXIWAY B 30+00 31+00 v ASPHALT W- --- 1 / ? 4 A GRASS P - N 04'49'34" W SIGN TO TO F- /Q0REST CTED 2akoo �_ o p p o LTJ p p F—F—F ------------ P-7�1-p---- ao* P---oP4/ P PZ- P—P-----//P—P�—P P—F (Px / / ASPHALT LLj N 2 45205 GRASS ASPHALT GRASS W A T J� (n / I TSA TSA TSA TSA TSA TSA 27+ E EDGE LIGHT TSP -- -- -- -- -- -- — -- — Lo + - + TO BE DEMOLISHED IN NI PHASE 3 / /� CONCRETE CONCRE E a �sA R-40010 Z � � J ASPHALT CONCRETE TSA TSA TSA I I a Z ASPHALT CONCRETE T - Ln TOFA TOFA ASPHALT CONCRETE CONCRETE ASPHALT GENERAL NOTES: 1. SEE SHEETS G1.4 TO G1.9 FOR SAFETY AND PHASING PLANS. 2. SEE SHEETS C4.1 TO C4.4 FOR LOCATION OF FIRE WATER LINE. 3. SEE SHEETS C6.1 TO C6.4 FOR EDGE UGHTING PLANS AND SCHEDULES. KEYED NOTES: PROVIDE NEW L-861T(L) TAXIWAY EDGE UGHT AND ISOLATION XFMR ON NEW L-867 BASECAN. SEE DWG E4.0 DETAILS 1 AND 7. PROVIDE 2" PVC DIRECT BURIED CONDUITS FROM NEW BASECAN, AND SPLICE TO EXISTING CONDUITS (2003 2" PVC) TO RESTORE CIRCUIT PATHWAY. SEE DWG E4.0 DETAIL 3. PROVIDE TEMPORARY L-824 5KV CABLE (#6 OR #8 AWG) SPANNING THE PHASE CONSTRUCTION AREA TO MAINTAIN THE EAST TAXIWAY CIRCUIT OPERABLE THROUGHOUT CONSTRUCTION. SEE DETAIL 9 ON DWG E4.0. PROVIDE BASE CAN EXTENSION AND 4" CONCRETE SURROUND TO MATCH NEW GRADE. CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 NOTE: I - —I�"L IF "L" DOES NOT MEASURE 1" ADJUST SCALES ACCORDINGLY. R-400158 SCALE z 0 FEET IN A A 20 0 20 40 GENERAL NOTES: 1. SEE SHEETS G1.4 TO G1.9 FOR SAFETY AND PHASING PLANS. 2. SEE SHEETS C4.1 TO C4.4 FOR LOCATION OF FIRE WATER LINE. 3. SEE SHEETS C6.1 TO C6.4 FOR EDGE UGHTING PLANS AND SCHEDULES. KEYED NOTES: PROVIDE NEW L-861T(L) TAXIWAY EDGE UGHT AND ISOLATION XFMR ON NEW L-867 BASECAN. SEE DWG E4.0 DETAILS 1 AND 7. PROVIDE 2" PVC DIRECT BURIED CONDUITS FROM NEW BASECAN, AND SPLICE TO EXISTING CONDUITS (2003 2" PVC) TO RESTORE CIRCUIT PATHWAY. SEE DWG E4.0 DETAIL 3. PROVIDE TEMPORARY L-824 5KV CABLE (#6 OR #8 AWG) SPANNING THE PHASE CONSTRUCTION AREA TO MAINTAIN THE EAST TAXIWAY CIRCUIT OPERABLE THROUGHOUT CONSTRUCTION. SEE DETAIL 9 ON DWG E4.0. PROVIDE BASE CAN EXTENSION AND 4" CONCRETE SURROUND TO MATCH NEW GRADE. CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 NOTE: I - —I�"L IF "L" DOES NOT MEASURE 1" ADJUST SCALES ACCORDINGLY. R-400158 z 0 to A A Z R9f N ZQ¢__ �Q Vm wa Z ZCFLL 4 gF� y �$ � H y LE Z 0 �F a 1 � m v a Q = Z LLJ g U a Z W Z O z } U En ce M N 0 x3 0 F m N SCALE AS NOTED DEs DCR SHEET NO, E3.4 9 CH. MEA OF SlEm DATE JANUARY, 2013 Fro` 23-2010-007