HomeMy WebLinkAboutR-4001580
0
v
0
a
0
n
r.
v
/ TSA TSA TSA TSA GEASPA GT .S. TSA TSA
P /E TSA UGH CABLE NORTH OF HERE TO
PHASE 3�PHASE Tv REMAIN AS-3� F
F
SIGN:"B" CONIC.SIGN:"B" E �
/ 2 F
T F %� 1 T46 —� �--p P-L�P P� �pp/PP�P P PSP P�P P---
A o p p o
—P�� P
M� T43 �eTas F P Pte_ 29+00 TAXIWAY B 30+00 31+00
v ASPHALT
W- --- 1 / ? 4 A GRASS P - N 04'49'34" W
SIGN TO
TO
F- /Q0REST CTED 2akoo �_ o p p o
LTJ p p F—F—F
------------ P-7�1-p---- ao*
P---oP4/ P PZ- P—P-----//P—P�—P P—F
(Px / / ASPHALT
LLj N 2 45205 GRASS
ASPHALT GRASS
W A T
J�
(n /
I TSA TSA TSA TSA TSA TSA
27+ E EDGE LIGHT TSP
-- -- -- -- -- -- — -- —
Lo
+
-
+ TO BE DEMOLISHED IN
NI PHASE 3 / /� CONCRETE
CONCRE E
a �sA
R-40010
Z � �
J
ASPHALT CONCRETE
TSA TSA TSA
I
I a
Z
ASPHALT CONCRETE T -
Ln
TOFA TOFA ASPHALT
CONCRETE CONCRETE ASPHALT
GENERAL NOTES:
1. SEE SHEETS G1.4 TO G1.9 FOR SAFETY AND
PHASING PLANS.
2. SEE SHEETS C4.1 TO C4.4 FOR LOCATION OF
FIRE WATER LINE.
3. SEE SHEETS C6.1 TO C6.4 FOR EDGE UGHTING
PLANS AND SCHEDULES.
KEYED NOTES:
PROVIDE NEW L-861T(L) TAXIWAY EDGE UGHT
AND ISOLATION XFMR ON NEW L-867 BASECAN.
SEE DWG E4.0 DETAILS 1 AND 7. PROVIDE 2"
PVC DIRECT BURIED CONDUITS FROM NEW
BASECAN, AND SPLICE TO EXISTING CONDUITS
(2003 2" PVC) TO RESTORE CIRCUIT PATHWAY.
SEE DWG E4.0 DETAIL 3.
PROVIDE TEMPORARY L-824 5KV CABLE (#6 OR
#8 AWG) SPANNING THE PHASE CONSTRUCTION
AREA TO MAINTAIN THE EAST TAXIWAY CIRCUIT
OPERABLE THROUGHOUT CONSTRUCTION. SEE
DETAIL 9 ON DWG E4.0.
PROVIDE BASE CAN EXTENSION AND 4"
CONCRETE SURROUND TO MATCH NEW GRADE.
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
NOTE: I - —I�"L
IF "L" DOES NOT MEASURE 1"
ADJUST SCALES ACCORDINGLY.
R-400158
SCALE
z
0
FEET
IN
A
A
20
0
20
40
GENERAL NOTES:
1. SEE SHEETS G1.4 TO G1.9 FOR SAFETY AND
PHASING PLANS.
2. SEE SHEETS C4.1 TO C4.4 FOR LOCATION OF
FIRE WATER LINE.
3. SEE SHEETS C6.1 TO C6.4 FOR EDGE UGHTING
PLANS AND SCHEDULES.
KEYED NOTES:
PROVIDE NEW L-861T(L) TAXIWAY EDGE UGHT
AND ISOLATION XFMR ON NEW L-867 BASECAN.
SEE DWG E4.0 DETAILS 1 AND 7. PROVIDE 2"
PVC DIRECT BURIED CONDUITS FROM NEW
BASECAN, AND SPLICE TO EXISTING CONDUITS
(2003 2" PVC) TO RESTORE CIRCUIT PATHWAY.
SEE DWG E4.0 DETAIL 3.
PROVIDE TEMPORARY L-824 5KV CABLE (#6 OR
#8 AWG) SPANNING THE PHASE CONSTRUCTION
AREA TO MAINTAIN THE EAST TAXIWAY CIRCUIT
OPERABLE THROUGHOUT CONSTRUCTION. SEE
DETAIL 9 ON DWG E4.0.
PROVIDE BASE CAN EXTENSION AND 4"
CONCRETE SURROUND TO MATCH NEW GRADE.
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
NOTE: I - —I�"L
IF "L" DOES NOT MEASURE 1"
ADJUST SCALES ACCORDINGLY.
R-400158
z
0
to
A
A
Z
R9f
N
ZQ¢__
�Q
Vm wa
Z ZCFLL
4 gF�
y �$
�
H y
LE
Z
0
�F
a 1
� m
v
a Q
=
Z
LLJ
g
U
a
Z
W
Z
O
z }
U
En
ce
M
N
0
x3
0 F
m
N
SCALE AS
NOTED
DEs DCR
SHEET NO,
E3.4
9
CH.
MEA
OF SlEm
DATE
JANUARY, 2013
Fro` 23-2010-007