CAG-00-045, Adden #7-11
'i" ' "/ atp.rtn."t of 7rasportatn Local Agency Agreement Supplement
Agency Supplement Number
City of Renton 6
Federal Aid Project Number Agreement Number
STPUL-STPD-FMSIB-1276(004) LA 5541 CFDA No. 20.205
The Local Agency desires to supplement the agreement entered into and executed on May 7,2003
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name SW 27th St/Strander Blvd Connection Length 0.6 mi
Termini West Valley Highway to Oakesdale Ave SW
Description of Work ❑ No Change
Construction of a railroad bridge at the BNSF tracks to span a road connecting SW 27th St to the Sounder Station.A two-lane road will
provide commuters with vehicular access from Renton to the Sounder Transit Station.
Reason for Supplement
Obligate Surface Transportation Program (STP)funds for construction.
Does this change require additional Right of ay or Easements? ❑ Yes ❑ No
Estimate of Funding
Type of Work (1) (2) (3) (4) (5)
PREVIOUS AGREEMENT/ SUPPLEMENT ESTIMATED TOTAL ESTIMATED ESTIMATED
SUPPLEMENT PROJECT FUNDS AGENCY FUNDS FEDERAL FUNDS
P.E. a. Agency: $19,000 $19,000 $1,350 $17,650
% b. Other_Consultant $958,851 $958,851 $129,445 $829,406
Federal Aid c. Other-Consultant $846,446 $846,446 $846,446
CA.FMSIB $700,000 $700,000 $700,000
c.2.Other-Non-participation $857,591 $857,591 $857,591
d. State_ $10,000 $10,000 $675 $9,325
e. Total PE Cost Est.(a thru e) $2,534,297 $857,591 $3,391,888 $1,689,061 $1,702,827
Right of Way f. Agency
% g. Other_Non-participation $562,221 $562,221 $562,221
Federal Aid h. Other
Participation 1. State
Ratio for Rw j. Total RNV Cost Est.(f thru j) $562,221 $562,221 $562,221
Construction k. Contract $6,703,092 $6,703,092 $904,917 $5,798,175
I. Other_Non-participation $230,301 $230,301 $230,301
m. Other_Non-participation $700,000 $700,000 $700,000
n. Other consultant $1,400,000 $1,400,000 $189,000 $1,211,000
6.`J % n.1.FMSIB $3,300,000 $3,300,000 $3,300,000
Federal Aid o. Agency $100,000 $100,000 $13,500 $86,500
Participation p. State $5,000 $5,000 $675 $4,325
Ratio for CN q. Total Const.Cost Est.(k thru p) $12,438,393 $12,438,393 $5,338,393 $7,100,000
r.Total Project Cost Estimate(e+j+q) $2,534,297 $13,858,205 $16,392,502 $7,589,675 $8,802,827
The local agency further stipulates that pursuant to said Title 29,regulations and policies and procedures,and as a condition to payment of the
Federal funds obligated,it accepts and will comply with the f1pipacable provisions.
AGENCY OFFICIAL Washington S to epartment of ransportation
By By
Denis Law, M , , Director of Highways and Local Programs
8 AUG 0 5 2011
ATTEST: -d � �� ' • �Rq/ - Date Executed
Bonnie I. Walton, City Clerk