HomeMy WebLinkAboutAdden 5 AGDr
Washhujton State
CA -00-045 , Adden #5-10
Department of T1�tion Local Agency reement Supplement
Agency Supplement Number
City of Renton 4
Federal Aid Project Number Agreement Number CFDA No. 20.205
STPUL-STPD-FMSIB-1276 004 LA 5541 (Catalog of Federal Domestic Assistance
The Local Agency desires to supplement the agreement entered into and executed on June 12,2009 CMM
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows: F EB 14 2011
Project Description
Name SW 27th St/Strander Blvd Connection Length 0,,6,4Q ffi IVED
Termini West Valley Highway to Oakesdale Ave SW
Description of Work ® No Change
Reason for Supplement
Obligate Federal Highway Administration(FHWA)discretionary funds to increase preliminary engineering funding.
Does this change require additional Right of Way or Easements? ❑Yes ® No
Estimate of Funding
Type of Work (2) (3) (4) (5)
yp Previous Supplement Estimated Total Estimated Agency Estimated
A reement/Su I. Pro'ect Funds Funds Federal Funds
PE a.Agency
_
% b.Other Consultant
c.Other L
Federal Aid d.State
Participation
Ratio for PE e.Total PE Cost Estimate a+b+c+d. 2,353,695.00 58102.00 2,411,797.00 831,470.00 1,580,327.00
Right of Way f.Agency
Federal Aid h. Other
Participation
Ratio for RW i.State
'.Total R/W Cost Estimate f +h+i
Construction k.Contract
I. Other Non-participation
m.Other
n.Other
% o.Agency
Federal Aid
Participation •State
Ratio for CN q.Total CN Cost Estimate k+l+m+n+o
r.Total Project Cost Estimate
The Local Agency further stipulates that pursuant to said�,rt1e.23,regulations and policies and procedures,and as a condition
to payment of the Fe I funds obligated,.it aWepts dn* iU'comply with the applicable provis}}oons.
Agency Official Washington State plartment of Transportation
BY ��Go /�` i j' s: s By G�4�- J Z ,
�./i... F
Title Denis Law, Ma ,CC r �7 SOT s'j0 Director of Highways and Local Programs
ATTEST � .d l�J ,: :., JAN 0 5 2011
� �'�-� Date Executed
Bonnie I . Walt.on ,-:<.Pity>} k;.
DOT Form 140-041 EF
Revised 1/2007 ,
Attachment
Agency:Ci of Renton Supplement Number: 4
Federal Aid Project Number: Agreement Number
STPUL-STPD-FMSIB-1276 004 LA 5541
Project Name: Strander Boulevard/SW 27th St
Estimate of Funding
Type of Work (1) (2) (3) (4) (5)
Previous Estimated Total Estimated Agency Estimated Federal
Agreement/Suppl. Supplement Project Funds Funds Funds
PE a.Agency 19,000.00 19,000.00 1,350.00 17,650.00
b.Other Consultant 958,851.00 958,851.00 129,445.00 829,406.00
c.Other Consultant 665,844.00 58,102.00 723,946.00 0.00 723,946.00
c.1.FMSIB 700,000.00 700,000.00 700,000.00
d.State 10,000.00 10,000.00 675.00 9,325.00
e.Total PE Cost Estimate(a+b+c+c.1+d) 2,353,695.00 58,102.00 2,411,797.00 831,470.00 1,580,327.00
H:\Division.s\TRANSPOR.TAT\PLAN N I NG\J u liana\Strander\W SDOT\Obligation_Attachment.xls