Loading...
HomeMy WebLinkAboutAdden 5 AGDr Washhujton State CA -00-045 , Adden #5-10 Department of T1�tion Local Agency reement Supplement Agency Supplement Number City of Renton 4 Federal Aid Project Number Agreement Number CFDA No. 20.205 STPUL-STPD-FMSIB-1276 004 LA 5541 (Catalog of Federal Domestic Assistance The Local Agency desires to supplement the agreement entered into and executed on June 12,2009 CMM All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: F EB 14 2011 Project Description Name SW 27th St/Strander Blvd Connection Length 0,,6,4Q ffi IVED Termini West Valley Highway to Oakesdale Ave SW Description of Work ® No Change Reason for Supplement Obligate Federal Highway Administration(FHWA)discretionary funds to increase preliminary engineering funding. Does this change require additional Right of Way or Easements? ❑Yes ® No Estimate of Funding Type of Work (2) (3) (4) (5) yp Previous Supplement Estimated Total Estimated Agency Estimated A reement/Su I. Pro'ect Funds Funds Federal Funds PE a.Agency _ % b.Other Consultant c.Other L Federal Aid d.State Participation Ratio for PE e.Total PE Cost Estimate a+b+c+d. 2,353,695.00 58102.00 2,411,797.00 831,470.00 1,580,327.00 Right of Way f.Agency Federal Aid h. Other Participation Ratio for RW i.State '.Total R/W Cost Estimate f +h+i Construction k.Contract I. Other Non-participation m.Other n.Other % o.Agency Federal Aid Participation •State Ratio for CN q.Total CN Cost Estimate k+l+m+n+o r.Total Project Cost Estimate The Local Agency further stipulates that pursuant to said�,rt1e.23,regulations and policies and procedures,and as a condition to payment of the Fe I funds obligated,.it aWepts dn* iU'comply with the applicable provis}}oons. Agency Official Washington State plartment of Transportation BY ��Go /�` i j' s: s By G�4�- J Z , �./i... F Title Denis Law, Ma ,CC r �7 SOT s'j0 Director of Highways and Local Programs ATTEST � .d l�J ,: :., JAN 0 5 2011 � �'�-� Date Executed Bonnie I . Walt.on ,-:<.Pity>} k;. DOT Form 140-041 EF Revised 1/2007 , Attachment Agency:Ci of Renton Supplement Number: 4 Federal Aid Project Number: Agreement Number STPUL-STPD-FMSIB-1276 004 LA 5541 Project Name: Strander Boulevard/SW 27th St Estimate of Funding Type of Work (1) (2) (3) (4) (5) Previous Estimated Total Estimated Agency Estimated Federal Agreement/Suppl. Supplement Project Funds Funds Funds PE a.Agency 19,000.00 19,000.00 1,350.00 17,650.00 b.Other Consultant 958,851.00 958,851.00 129,445.00 829,406.00 c.Other Consultant 665,844.00 58,102.00 723,946.00 0.00 723,946.00 c.1.FMSIB 700,000.00 700,000.00 700,000.00 d.State 10,000.00 10,000.00 675.00 9,325.00 e.Total PE Cost Estimate(a+b+c+c.1+d) 2,353,695.00 58,102.00 2,411,797.00 831,470.00 1,580,327.00 H:\Division.s\TRANSPOR.TAT\PLAN N I NG\J u liana\Strander\W SDOT\Obligation_Attachment.xls