Loading...
HomeMy WebLinkAboutAdden 1 • -93-072, Adden. #1-97 0 Washington State AGENCY AAL AGENCY AGREEMENT Department of Transportation SUPPLEMENT NO. 1 Agency Federal Aid Project Number Cit�v_ f Renton m-0900 (007) Date Agreement Number August 26, 1997 LA-2186 The Local Agency of Renton, Wa--hi nai-r)n desires to supplement the agreement entered into and executed on as identified above. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: PROJECT DESCRIPTION Name SR-900 HOV and NB Houser WaV Interchange Length 0.53 miles Termini SR-169 and I-405 Description of Work Construct new HOV lanes from SR-169 to a new Houser Way interchange. The northbound grade separated interchange connection will also be a part of this project. Additional tasks will include modification of channelization, traffic signals and sign- Reason for Supplement ing along Sunset Boulevard North and at the signalized intersections. Request remaining PE funds and move to construction to purchase signal equipment along Sunset Boulevard. 1 _ ESTIMATE OF FUNDING TYPE OF WORK (1) (2) (3) I (4) (5) PREVIOUS AGREEMENT/l SUPPLEMENT I ESTIMATED TOTAL I AGENCY FUNDS FEDERAL FUNDS i SUPPLEMENT - I ' 41,20 (11,336)__. ___ 29864__. ___ 5,973 i 23-,891 I P.E. a, Agency Work - b. Other 120,0.00 (81,294)_ _38,705__. _-- 7,741 - _ 30,964 - — _ c. State Services 2 .000 7,nn0 ann -.7_r6DIl__. _ I d. Total PE Cost Estimate(a+b+c) 163,200 (92,630) 70,569 14,114 56,455 I i Right-of-Way e. Agency Work --------- ---- ------•---- --- --- - - - -- - - - i f. Other ---•- -•--•-- -------------- -----•-------- --- -------- - - i g. State Services -• -- — -- h. Total R/W Cost Estimate(e+f+g) Construction i i. Contract j. Other Equip. Purchase 84,999 84_,999__. _-17_L000- -- - . --67,999 . k. Other Service Contract 3,000- - _. •-_ .3_,000---- ---- - -600-- --. ._--2,41Q0 . - - I 1. Other - -- ----- 87-- X99 87 - 999 1 7 m.Total Contract Costs(i+j+k+I) I X ,600 I 70 X99 Construction Engineering n. Agency __3,_7.05-_-_. --___3_,-7.05__. _•-__-741 __-. -_ ..2,96t�- . . o. Other ..---- -------------- -------------- --- -------- --- - - p. State Forces 926 926 185 741 q. Total Const. Engineering (n+o+p) _.__ 4,6 31 4,6 31 9 2 6 I* 3,70 5__ _ r. Total Const. Cost Estimate(m+q) 92,630 I 92,630 18,526 74,104 s OF THE PROJECT'd+Ah r) 1 163,200 I 0 163,� 32,640 130,S$ " Federal participation in Construction Engineering(q)is limited to 15%of the Total Contract Costs. (line m, column 5) The local agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. AGENCY OFFICI WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By ---- -- - - ------- -...-- Local Agency Official J -- - By: - — -- — -- - Assistant Secretary for T ruFUo ATTEST: 1aA7 _ Date Executed DOT For-140-0„ yn Ma ersen, (,qty Clerk R"sed 8195