Loading...
HomeMy WebLinkAboutCO 05CAG -91-095 Adden. 1t5-92 CHANGE OWNER ❑ (name, address) ARCIIITFCT O p ORDER CONTRACTOR ❑ F FIELD ❑ A1A 1X K,'V tfEA'T G701 OTHER 0 PROJECT: RENTON SENIOR HOUSING CHANGE ORDER NUMBER: Five (5) (name, address) DATE-. March 17, 1992 TO CONTRACTOR: KIRTLEY-COLE ASSOCIATES ARCHITECT'S PROJECT NO; 9007 (name, address) 1002 -10th Street CONTRACT DATE: October 31, 1991 Snohomish, Washington 982.90 CONTRACT FOR: General Construction CA67# 9/ The Contract Is changed as follows: ADD Sales Tax to the Contract as described in Kirtley-Cole Modification Proposal 010, attached hereto.. ADD to Contract Sum ..................................................$5,595.02 Not valid untll slgfwd by the Owner, Archlttrat and Cclntraator. The original (Contract sum) WWUW"X AKAM'XX) wm .. , , ' • • ' ' ' ' ' ' ' . ' ' ' ' ' • , .. 4, 620 , 765.00 ,4ct cltangc by previously anthofued Change orders ..................... • .... • .... f 464,177.26 71' The ((:ontoctsum) p3ULxA0K:%XKKib3iig prior tothhClunAcOrtkrway....... ..t 5,048.942.26 The (C.ontrao sum)(glf9ifGCi>tdiftllltl(fAltltwKIQ wt11 be (lnctcav-d)lMWill) (NXZW 1lK) by this Change Order in dw amarum of i 5,595.02 The new (Contract SUm)I0LjMCj=j%%XWXJLXM) indutfingthii Charw Order will he ..i 5,054,537.28 The Contract 'Cime wllf he3M0"c2dK0x*x?=I() lunclul*ml) by The dair of suboantial (:a)mpletkan aA of t1w (tate of I1rty c itanW Order dxrefore Lti November 26, 1992. NOTE lhtr summary dm+ two rr(w durom NM the COMm(1 sum, owran Time or (it(armilmd Alaximum 1'rk-r wikkir have beth[ Auftwtrrd h)' c',munutkm Cha w 1'Nrmlivc. THE QRS ORGANIZATION, INC. KIRTLEY-COLE ASSOC., INC. CITY OF RENTON# P&R AR01ITF.t l' CONTRA(:itMR OUINFR Ali 7_ S �¢y,Way, 0200 1002 – 10tljStreet 200 _Mill Avenue South Atklrct+ Addrewr Addrem S 0 290 Renton WA 980055 H1` Py DATE .. 3� ---- DATE WA noalta n' QM . C.t1ANGE INrM N I", FIrITNMN AiAO 4019117 . [111 C11"11-1191117 AWRICAN INSTITt.rl'E OF 0011TEM— 17y1 Nlu Y(Ntit Avt NW, WASHMTON, DG. AK MG WkRNWO: UnN-snud pholocap&g vlohn.a U.&. eMr+phl 100 WW16 SU*d b WO proaan&ert. B HVIVI - 1 MODIFICATION PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING -JOB #313 ASSOCIATES, INC Date: March 10, 1992 jenera contractors p.o. box 1179 1a02. 10tthh To: THE ORB ORGANIZATION snohomish wash. 98290 (206) 569.3175 Initiated by: Modification Proposal: Estimated costs for Washington State Sales Tau an additional (6) apartment units added (Alternate Bid 2, In lieu of Alternate Bid 4): Materials/Equipment ($68.232.00 X 8.2%) $5,595.02 Subtotal .. .. $5,595.02 Total .. ... $5,595.02 Reason for Modificallon: as a,!r PROPOS kL REQUEST #6 Cost: Add.tional: 55,595. 2 ;redi;t $-0- I. -at: $5,595.02 Change In Calendar Days: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner Modification Proposal Incorporated Into Change Order Number: Attachments: No action will be taken regarding this item until we receive written authoriution directing us to do so, All contract work will proceed on its normal schedule. PROPOSAL NO. TEM 1101 HVIVI - 1 U) 2 O 9 n m