HomeMy WebLinkAboutCO 10095
CAG -
Jr -Q-111 @H " Le L� Added^(i10-92 "
CHANGE O1 OER MAY I.1 Owner
ORB Form 300Architect
(This fore is to be executed in triplicate and each party is to retain an original) KIRTLEY • COLE ASSOCjr'�TESContractor
Project Name: RENTON SENIOR HOUSING Date: May 8, 1992
Project Address: 3151 NE 16th. Street Change Order No.: Ten (10)
Contractor Name KIRTLEY-COLE ASSOCIATES OR® Project No: 9047
.k Address: 1002 - 10th Street
Snohomish, Washington 98290 Contract For. General Construction
Contract Date: October 31, 1991 Z
Q
The Contract is hereby amended as follows:
1) Per ORB P,oposal Request No. 13, dated April 6, 1992 (attached) and
In
Kirtley-Cole Modification Proposal No. 20, dated April 22, 1992 (attached) Add_ ............ S1594-95
Provide changes to Automatic Entry Door No. 27
2. Per ORB Proposal Request. No. 17, dated April 1, 1992 (attached) and � fn
Kirtley-Gale Modification Proposal No. 21, dated April 22, 1992 (attached) Rt
Dclete Therma-Cal Vent Top insulation at 5.1 /2 / 12 roofs and install specified Subtract.....,.(S i453.7b) p
Therma-Cal Nailbase insulation. r
0
3) Per Kirtley-Cole Modification Proposal No. 22, dated April 22. 1492, (attached) m
Delete Medicine Cabinet at Handicap Units. Subtract """'(5- 4'42.) D
4) Per Klrtley-Cole Modification Proposal No. 23, dated April 22, 1992, (attached) bb:w:i�ill............(5-8200.00)
delete waterproof membrane and sand from shower stall installations. 9t
TOTAL CONSTRUCTION CObT IMPACT OF THIS CHANGE ORDER: ............................. (5.9029.23) 0
The Change Order shall include all Contractorts) labor, material, overhead, profit, and ail direct and/or indirect costs associated with X0,1 c
the Change in Scope of Work.
This Chane Order is net valid unless si ed b the Owner. Architect and Contractor.
............ 54,620,, fa5:00
The original Contrct Sum was ................................. • ............. 5 590,721.48
Net Change by previously authorized Change Order(s) was ...................................... .
211,4$6
.48
The Contract. Sum prior to this Change Order was ................ . .. ..........................
(5. 9,029.2]1
The Contract Sum will be decreased by this Change Order in the amount of ........................ 1 (5 2'02, 29.23 j
5715
The new Contract Sum incorporating this Change Order will be .... • .. • • • • • • • • . • • • • • • 0 days j
The Contract Time will be unchanged by ....................... I ....................Decembee 30, 1492
The Substantial Completion Date including this Change Order is .... • ..... • • • • • • • • • • • • • • • ' ....... Z
O
NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by d
ORB Form 301 - Construction Change Directive.
THE ORO ORGANIZATION, INC.
b07 SW Grady Way, Suite 210
Renton, Vashington 98055
AIA
Date
KIRTLEY-COIF ASSOCIATES
1042 - 10th Stmt
Snohomish, %lashingtot},98290
o,don Cole
Date
CITY OF RENTON, P & R DEPT.
200 Mill Avenua South
Renton, Washington 99055
%"Va"f'16- '--'X.
�'incen Lc'e
ass:
Page l of i
1
ems —
z
O
n
091
z
N
z
m E
S UBS1DtARY OF THE STANLEY WORXS
STANLEY PARKING SYSTEMS
DIVISION OF STANLEY HAG*DOOR
,
I TIRTLEY COLE ASSOCIATES, INC-
ion
TvC.1402 10th St.
Snohomish, STA 98240
Attn: Greg Brimhall
L RA: Renton Senior Center - Propo,al Request 12
We propose to furnish and install the following equipment, to comply with
the proposed change:
I ea: panelebreakawayde 2000, package atdel the2slide, SX
exterior vestibula location.
p
1 ea: Stanley Auraglide 3000, model 5-3041AC LE Package with Adams -Rite
8600 panic device, electronic locking of the sliding function, and
interior slide, SX -SO breakawAY configuration. This unit is to be
inacalled at the inner vestibule location.
0 Both packages have standard, motion and presence detecting equipment
for door activation and safety. Package sizes are 8101" x 7'8".
Calor: Clear anodized aluminum.
Standard, one year Warranty included.
Exclusions remain the same As in the original bid.
Total price this proposal......s...112 0.0• .. '
..................38334.00
Change from original contract is + 51250.00.
Delivery, six to eight weeks. Thank You,
FectoryAutl+�ed Son d samce PARKING
MAGIC -BOOR y + SYSTEMS
sa
2M
m§
4
M"
ycg
C�
i7
p n
co
rig
0 c�
C*
Z
a
d
n
M
MODIFICATION PROPOSAL
KIRTLEY
CODE • Project: REN!'ON SENIOR HOUSING - ]08 1315
ASSOCIATES, INC
` Date: April 22, 1992
�a1
contractors
p.o. box 1179 To: THE ORB ORGANIZATION
t002 - loth
Snohomish
wash. 98290 Initiated by: Architect
(?06) 568-3175
Modification Proposal: At 5-1/2 ! 12 pitched roofs over the community areas, delete the specified vented insulation
(-Therma-Cal Vent Top') and install same insulation as specified for 114' 1 12 roof area. Delete sheet metal ridge
vent at community area roof. replace with asphalt si ingle ridge cap: .
-L,250.00
Enslow Roofing
-194.00
Everett Sheetmetal, Inc.
-4.76
WSST a 8.2% of materials ($-119.00)
Subtotal .....
S-1,453.76
Total ................ ...
S-1,453.76 l
r0h,nngein
ication: as per PROPOSAI. REQUEST NI? (dated 411192)
Additional: 50.00
Credits: $1,453.76 Net: S-!,453.76
ar Days: -0- Y
i b
}
Approved Reject i
Recommendation: for C.O.
Architect
General Contractor
Owner
Modification Proposal incorporated Into Change Order Nwnber'
Attachments: Enslow Roofing - proposal dated 412192 1 Everett Sheetmetal. Inc. - proposal dated 4/15192
No action will be ulnen regarding this sem until we receive written authorisation directing us to do so.
All contract work will proceed on its rwrmal schcduk. PROPOSAL NO. *urFnr rV-ONECll
- 1
Enslow Roofing
. POST OFFICE Sox ASSTS • TACOMA. WASHCNCTO2N49 8µ4S5-4794
ret, 42051846-4687 - su (2061 242-5919 N
Owl. fostommwr
APRIL 2 1992
KMTLEY COLE INC.
ATTN: GARY
PO BOX 1179
SITOROMISIL WA 99290
RE RFNWN SENIOR HOUSING
SECTION 072D0
PROPOSAL REQUEST W
DEAR GARY:
AT 5 V21 l2 PITCHED ROOF OVER THE COM MUN1TY AREA DFJXM TTM SPEC-
jp 1 TED VENTED INSULATION (nURMA-CAL VENT TOP) AND INSTALL THE SAME
INSULATION AS APPROVED FOR THE 114"112 ROOF AREA. SUBTRACT S 1,400.00
FROM THE CONTRACT.
DR= SHEET METAL RIDGE VENT AT COMMUNITY AREA ROOF. REPLACE
WITH ASPHALT SHINGLE RIDGE CAP. ADD $150.00 TO THE CONTRACT -
DEDUCT $1,400.00 INSULATION - LelISM
ADD $150.00 RIDGE CAP - (4 15. w - M)
..........
NET DEDUCT $1,250.00
IF ANY QUESTIONS PLEASE CALL -
KEN F ENSLOW
09
APR -7 1992
910Tr CV . rn1 r Aimn i C
APFt�13-92 WED
pd EVERETT SHT'--L 2S2-S4S'...M P.01�, I
Everett Sheetrnetal, Inc.
3310 CEDAR STREET P.O. BOX 2557 EVEREM WASH`S �� i
FAx
Fax No.
TO:
FROM
Number of Pagea including cover_,
tf you have any questions Please call (206) 252-1434
our FAx number is (106) 252'-9655
ov eL'Mlor Iraw� ►r1
°°
'MODIFICATION PROPOSAL
KIRTLEY
COLE 0Project: RENTQN SENIOR HOUSING -JOB #315
ASSOCIATES, INC
gCnCral Date: April 22. 1992
contractors
p.o. box I t79 To: THE ORB ORGANIZATION
10032 - 10th
mohomish
wuh. 99290 Initiated by:
t'206) 568-3175
Modirication Proposal: Delete H.G. medicine cabinets:
(6) #170-22-25 Medicine Cabinets 0 135.001e3.
WSS17 0 8.2% of materials (S-810.00)
Installation - 3 hours C 28.001hr.
Subtotal ................ . .... .
Total
Reason for Modirtcltion:
Cost: Additional: 50.00 Credits: $960.42 Net:
Change in Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
hlodirication Proposal Incorporrted Into Change Order Number:
Attnthmmis:
No action will be tsken Ai( ontnct work W�iltho item r1proc� d on us nornui� cdukeon dimKing us w do so -
Ail
PROPOSAL NO. S
items
-810.00
.66.42
-84,00
$-960.42
$-960.42
$-960.42
z
n
n
m
q -R
in�
cm
M0
-40
OC
I
Cz
O�
m
O vi
0
z
Q
A
n
m
z
0
-4 0
0
> z
co
-n
m M
Fri
o Fn
cn
M 0
IV)
z
0
0
m