Loading...
HomeMy WebLinkAboutCO 10095 CAG - Jr -Q-111 @H " Le L� Added^(i10-92 " CHANGE O1 OER MAY I.1 Owner ORB Form 300Architect (This fore is to be executed in triplicate and each party is to retain an original) KIRTLEY • COLE ASSOCjr'�TESContractor Project Name: RENTON SENIOR HOUSING Date: May 8, 1992 Project Address: 3151 NE 16th. Street Change Order No.: Ten (10) Contractor Name KIRTLEY-COLE ASSOCIATES OR® Project No: 9047 .k Address: 1002 - 10th Street Snohomish, Washington 98290 Contract For. General Construction Contract Date: October 31, 1991 Z Q The Contract is hereby amended as follows: 1) Per ORB P,oposal Request No. 13, dated April 6, 1992 (attached) and In Kirtley-Cole Modification Proposal No. 20, dated April 22, 1992 (attached) Add_ ............ S1594-95 Provide changes to Automatic Entry Door No. 27 2. Per ORB Proposal Request. No. 17, dated April 1, 1992 (attached) and � fn Kirtley-Gale Modification Proposal No. 21, dated April 22, 1992 (attached) Rt Dclete Therma-Cal Vent Top insulation at 5.1 /2 / 12 roofs and install specified Subtract.....,.(S i453.7b) p Therma-Cal Nailbase insulation. r 0 3) Per Kirtley-Cole Modification Proposal No. 22, dated April 22. 1492, (attached) m Delete Medicine Cabinet at Handicap Units. Subtract """'(5- 4'42.) D 4) Per Klrtley-Cole Modification Proposal No. 23, dated April 22, 1992, (attached) bb:w:i�ill............(5-8200.00) delete waterproof membrane and sand from shower stall installations. 9t TOTAL CONSTRUCTION CObT IMPACT OF THIS CHANGE ORDER: ............................. (5.9029.23) 0 The Change Order shall include all Contractorts) labor, material, overhead, profit, and ail direct and/or indirect costs associated with X0,1 c the Change in Scope of Work. This Chane Order is net valid unless si ed b the Owner. Architect and Contractor. ............ 54,620,, fa5:00 The original Contrct Sum was ................................. • ............. 5 590,721.48 Net Change by previously authorized Change Order(s) was ...................................... . 211,4$6 .48 The Contract. Sum prior to this Change Order was ................ . .. .......................... (5. 9,029.2]1 The Contract Sum will be decreased by this Change Order in the amount of ........................ 1 (5 2'02, 29.23 j 5715 The new Contract Sum incorporating this Change Order will be .... • .. • • • • • • • • . • • • • • • 0 days j The Contract Time will be unchanged by ....................... I ....................Decembee 30, 1492 The Substantial Completion Date including this Change Order is .... • ..... • • • • • • • • • • • • • • • ' ....... Z O NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by d ORB Form 301 - Construction Change Directive. THE ORO ORGANIZATION, INC. b07 SW Grady Way, Suite 210 Renton, Vashington 98055 AIA Date KIRTLEY-COIF ASSOCIATES 1042 - 10th Stmt Snohomish, %lashingtot},98290 o,don Cole Date CITY OF RENTON, P & R DEPT. 200 Mill Avenua South Renton, Washington 99055 %"Va"f'16- '--'X. �'incen Lc'e ass: Page l of i 1 ems — z O n 091 z N z m E S UBS1DtARY OF THE STANLEY WORXS STANLEY PARKING SYSTEMS DIVISION OF STANLEY HAG*DOOR , I TIRTLEY COLE ASSOCIATES, INC- ion TvC.1402 10th St. Snohomish, STA 98240 Attn: Greg Brimhall L RA: Renton Senior Center - Propo,al Request 12 We propose to furnish and install the following equipment, to comply with the proposed change: I ea: panelebreakawayde 2000, package atdel the2slide, SX exterior vestibula location. p 1 ea: Stanley Auraglide 3000, model 5-3041AC LE Package with Adams -Rite 8600 panic device, electronic locking of the sliding function, and interior slide, SX -SO breakawAY configuration. This unit is to be inacalled at the inner vestibule location. 0 Both packages have standard, motion and presence detecting equipment for door activation and safety. Package sizes are 8101" x 7'8". Calor: Clear anodized aluminum. Standard, one year Warranty included. Exclusions remain the same As in the original bid. Total price this proposal......s...112 0.0• .. ' ..................38334.00 Change from original contract is + 51250.00. Delivery, six to eight weeks. Thank You, FectoryAutl+�ed Son d samce PARKING MAGIC -BOOR y + SYSTEMS sa 2M m§ 4 M" ycg C� i7 p n co rig 0 c� C* Z a d n M MODIFICATION PROPOSAL KIRTLEY CODE • Project: REN!'ON SENIOR HOUSING - ]08 1315 ASSOCIATES, INC ` Date: April 22, 1992 �a1 contractors p.o. box 1179 To: THE ORB ORGANIZATION t002 - loth Snohomish wash. 98290 Initiated by: Architect (?06) 568-3175 Modification Proposal: At 5-1/2 ! 12 pitched roofs over the community areas, delete the specified vented insulation (-Therma-Cal Vent Top') and install same insulation as specified for 114' 1 12 roof area. Delete sheet metal ridge vent at community area roof. replace with asphalt si ingle ridge cap: . -L,250.00 Enslow Roofing -194.00 Everett Sheetmetal, Inc. -4.76 WSST a 8.2% of materials ($-119.00) Subtotal ..... S-1,453.76 Total ................ ... S-1,453.76 l r0h,nngein ication: as per PROPOSAI. REQUEST NI? (dated 411192) Additional: 50.00 Credits: $1,453.76 Net: S-!,453.76 ar Days: -0- Y i b } Approved Reject i Recommendation: for C.O. Architect General Contractor Owner Modification Proposal incorporated Into Change Order Nwnber' Attachments: Enslow Roofing - proposal dated 412192 1 Everett Sheetmetal. Inc. - proposal dated 4/15192 No action will be ulnen regarding this sem until we receive written authorisation directing us to do so. All contract work will proceed on its rwrmal schcduk. PROPOSAL NO. *urFnr rV-ONECll - 1 Enslow Roofing . POST OFFICE Sox ASSTS • TACOMA. WASHCNCTO2N49 8µ4S5-4794 ret, 42051846-4687 - su (2061 242-5919 N Owl. fostommwr APRIL 2 1992 KMTLEY COLE INC. ATTN: GARY PO BOX 1179 SITOROMISIL WA 99290 RE RFNWN SENIOR HOUSING SECTION 072D0 PROPOSAL REQUEST W DEAR GARY: AT 5 V21 l2 PITCHED ROOF OVER THE COM MUN1TY AREA DFJXM TTM SPEC- jp 1 TED VENTED INSULATION (nURMA-CAL VENT TOP) AND INSTALL THE SAME INSULATION AS APPROVED FOR THE 114"112 ROOF AREA. SUBTRACT S 1,400.00 FROM THE CONTRACT. DR= SHEET METAL RIDGE VENT AT COMMUNITY AREA ROOF. REPLACE WITH ASPHALT SHINGLE RIDGE CAP. ADD $150.00 TO THE CONTRACT - DEDUCT $1,400.00 INSULATION - LelISM ADD $150.00 RIDGE CAP - (4 15. w - M) .......... NET DEDUCT $1,250.00 IF ANY QUESTIONS PLEASE CALL - KEN F ENSLOW 09 APR -7 1992 910Tr CV . rn1 r Aimn i C APFt�13-92 WED pd EVERETT SHT'--L 2S2-S4S'...M P.01�, I Everett Sheetrnetal, Inc. 3310 CEDAR STREET P.O. BOX 2557 EVEREM WASH`S �� i FAx Fax No. TO: FROM Number of Pagea including cover_, tf you have any questions Please call (206) 252-1434 our FAx number is (106) 252'-9655 ov eL'Mlor Iraw� ►r1 °° 'MODIFICATION PROPOSAL KIRTLEY COLE 0Project: RENTQN SENIOR HOUSING -JOB #315 ASSOCIATES, INC gCnCral Date: April 22. 1992 contractors p.o. box I t79 To: THE ORB ORGANIZATION 10032 - 10th mohomish wuh. 99290 Initiated by: t'206) 568-3175 Modirication Proposal: Delete H.G. medicine cabinets: (6) #170-22-25 Medicine Cabinets 0 135.001e3. WSS17 0 8.2% of materials (S-810.00) Installation - 3 hours C 28.001hr. Subtotal ................ . .... . Total Reason for Modirtcltion: Cost: Additional: 50.00 Credits: $960.42 Net: Change in Calendar Days: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner hlodirication Proposal Incorporrted Into Change Order Number: Attnthmmis: No action will be tsken Ai( ontnct work W�iltho item r1proc� d on us nornui� cdukeon dimKing us w do so - Ail PROPOSAL NO. S items -810.00 .66.42 -84,00 $-960.42 $-960.42 $-960.42 z n n m q -R in� cm M0 -40 OC I Cz O� m O vi 0 z Q A n m z 0 -4 0 0 > z co -n m M Fri o Fn cn M 0 IV) z 0 0 m