Loading...
HomeMy WebLinkAboutCO 11CHANGE ORDER COR Form .. Clbls Soca is to be uasc,:<ed is td{r om and ach p=T is to rwia as Oftbzs0 Prcr=148M c RE:`rivN S L ' , `y P=o1e= ,s ddre= 3151 ; LE 16th St ma C Na=a lCCi L E -==- AMCC•AM Add== loaf-10thS, Washi�s� LEY.COLE ASSOCIATES Sool-.amfah. L -Am June a, ►774 (==p Qdw Na: Eleven (11) CRB Prate No- 9007 COR Pte = NW CAG 095-91 Cana= F: canaml c wt C==iG Door Ccsb w 3t- 149,. Tha Gni s h="v sa:ended as :ailaWx (attached) and 1) Per ORB Proposal Request No. 23p 4/16/92. Kirtiey-Cole Modification Proposal No. 25, 5/12/92, (attached): "Delete American Standard faucets at all kitchen and bathroom sinks - except at Toilet Rooms 160 and 161. Install Delta 1120 Faucets at all kitchen sinks; install Delta r520 faucets No cost change at all bathroom sinks". 2) Per ORB Proposal Request No. 28, 5/5/92, (attachtd), Kirtley- Cole Modification Proposal No. 32, 5/28/92, (attached): Subtract..($ -2,902.12) "Revise water main piping per attached diagram". 3) Per ORB Proposal Request No. 21, 4/16/92, (attached), Kirtley-Cole Modification Proposal No. 29, 5/15/92, (attached) and Revised Site Drawings dated 11/22/91: "Provide Add,,, $13,213.38 landscape and irrigation changes"- TCTAL.'CCN5',7L:CiICN tC=Tt ae #G; CF -LMS C.'H.AN('c 0 ...................... ...... ,,. Add... $10,311.26 C:sage crew steal! dude Sr _2cot{s) )abor, mxarrsL ov�d ?raft, and all dltee sadloriadlte� a� a with the cP is SOaps of Woda A f- ....,... ... .. .... $4,620,765.00 Th,Ct+s�salCasaeSumWsa ,.........Qt {sf).,......... ..................... 581,692.25 Ka C=qo by pmm-ily susdacad,, "� 5,202,457.25 The Caatam this Com. Crdar Was ................. . ....... . ............. 10, 311.26 Tha C==r- Sum Wall be mvined by this C� OTdw !4 tbs &masa: of ................... 5,212,768.51 The new C> == Sum ' Crda wiII b. ... . ....... . . ........... +2 days TheCaastsc ►ime W►llba Eby .,.......C.+er...•....... ...... January 1, 1993 The Sssbaears:al G,mplaooa Dm a 6 this s .................. No=- Tine above ummsary does not inc'ada sal +dsaagw is tis.:�amC $arm or C Tins Whieh hsne been agptvved by Nor=- CRB Forst _"61 . c -.,,,=,=.w. C'saags Dttecsve or ownce I Edd Duccaves -M ORB CRGAN=TICK WC. 607 SW Gndp Wap, Suits =0 R== Washiag=m 9EM ca ALA � r Cars KMM_C0L1_: A=aAT= 1002. lilt 9XW Snohomish. Washims= �'O 1\ra T Cato CM CIF RE► TW, Pis R DEET. 200 MM AVIOW Sosait Reamn. Wownran gms Page 1 of — PROPOSAL REQUEST Owner - ORB Form 302 Contractor Date: 1pr1 16,1092 project Name Renton Sertwr Housing Proposal Bequest No, Twenty-three (23) project Address: 3151 NE 16th Street ORB project lila.: 4G.. Contractor Name ydrileY -Co1e Assacates k Address•. Box 1174 Contract For. General Canstruction Snohomish, Washington 98 6 0 Contract Date: October 31, 1991 n m breslcdawn of the propased costs 4 r rrtodificadons to the Contract Sum and/or Contras Iune associated with the Please submit a Work and to the ContrUt Docurnents dmcibed below. in the 5cooe of W C proposed eha.ttges Mm This b not a Ciwn,gc Order or a Notice to Proceed with the work desrnbi'd t clow. -+ n C) C m Description or proposed &. mges: at toilet Boocu 16t} and i61. ID CZ Delete specfied Amerimn. Standard faucets at all kitchen and bathroom sinks, except Install Delta SI:0 faucet at all kitchen sinks. O { I i lnstail Delta s52t7 faucets at all battuom sinks. m i 8F � Contracror(s) tabor, ntatertaL overhead, profit and all direct and/or indirect costs aced with the The Proposal shall include all Change in Scope of Watk. List of atuchrnerts. if any, that desctba abo%x actions: N/A An=,hltem THE eltB cRcANtzaTjcN, lN��4���� By Douglas G. Pedersen Page 1 of f e NIODIFICATIOI . ?ROPOSAL KIRTLEY COLE 0 Project: REN1-dN SENIOR HOUSING -!dE 1315 ASSOCIATES, INC general Date: May 12. 1992 corurac ors p.o. box 1179 To: THE ORB ORGANIZATION 1002 - 10,h snohornah wash. 96,90 Initiated by: Architect t_06l sb6.3175 Madiliration Proposal: Dele'e specified American Standard faucets at all kitchen and bathroom sinks, except at Toilet Rooms 160 and 161. Install Delta 1120 faucets at all kitchen sinks. install Delta #520 faucets at all bathroom sinks: N/C Sunrise Plumbing Subtotal ................... 50.00 I k Total ....... .. SQ.QQ Reason ror Modification: as pt. PROPOSAL REQUEST 123 Cost: Additional: SO -00 Credits: S-0- Net: 50.00 Change In Calendar Duys: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner W -u - co z O hlodirication Proposal Incorporated Into Change order Num o Attaclunents: Sunrise Plumbing - proposal dated 514192 No action will be liken retarding this item until we receive written authorization dimectint us to do sa. All contract work will procecd on its normal schedule. PROPOSAL No. ' ms a T � M KIliTLEY C OLE ASSOCIATE�4W. 1002. loth Streedp.o. Boa 1179. Snohomish, WA 91290 MAY -7 1992 phone (206) 561.9175/FAX (206)561-7919 April 22, 1992 �Xtt��1' FOR P MLEASB U3F -HO FORM ONLY WHEN SUBMf N(M SUB/SUPPLIER: SUNRISE PLUMBING, INC. 1415 - 22nd Street NW Auburn, WA 98001 ATTENTION: Project Estimator PROJECT: RENTON SENIOR HOUSING JOB NUMBER: 315 DESCRlynUN OF WORK: 11s per PROPOSAL REQUEST #23, attached ' RFSPOND,BY: - ",, TUESDAY, APRIL 28,4992- KIRTLEY • CCLE ASSOCIATES TOTAL AMOUNT CONTRACT TIME REQUEST ,6y2::7 DAY(S) • 71139 CROPOSAL REFLECTS ALL OF nm COSTS INVOLVED INCLUMNG ANY COy'IS OF DF3J�YS, DAMACE3 WItlCII h1AV OCCUR FROM MAYS AND AKV IU"U a EM OF SUCII DUAM AUTHORIZED SIGII ATURE: f7►rttQ � 1�if..c'.� ' DATE:_ ` :'- SIGNED: QFnttrF SAGER 0 =1 cm MU A F 0 0 CA 2 0 4 0 M PROPOSAL REQUEST Owner Form 302 to ArclIORB Contractor caRtracmr proJax IV.tint.; RENtOh1 SEl`IIOR 1iOLlSIIYG Date: May 3, 1!92 rrele`s Address: 313' VE loth 5*r i Proposal Request No.: 28 Contractor *lame MRTLEY-COLE ASSOCIATES, INC ORB Project No.; 9007 & Address: 1007 - 10th Street Snohomish. Wa shingwn 9F60 Can s For. General Constriction Contract 'Date: October 31, 1991 Please submit a brraWown of the proposed casts for modifications to the Contract Sun and/or Contract Tuts ass—atzd with the proposed changes in t1'e S_ope of Work and to the Contract Documents descibed below. This is not a r'he.nge Order or , YoHce to Proceed frith the work desrxibed below. Desm o aRntr t proposed zhanges: 1. Dele.e domestic water mzins tom Znd and 3rd floor corridors at east and west wings. 2. Resize water main at first floor of east and west wing to supply first, wand, and third floor units vta %,erticai supply risers. i in, water distribution riser dlr and l siain calculations 3. Provide revisedI . piping p gra' pipe B for building deparLnent review and owner's records. The proposal shall include all Contractors) Labor, materal, overhead, profit, and all direct and/or indirect costs associated with the Change In Script. of Work List of attar–haunts, if any, that describe above actions: Architect: THE ORB ORGANIZ By: Doug Pedersen page 1of1 z n rn =Vn- to am rn� O D Z O -n rnm vv; OFn Z r`n z d –t 0 rn Ream for Modificadon: as per PROPOSAL REQUEST M Cots: Additional: $0.00 Credits: 52,902.12 Net: 5+2,902.12 Chime in Cakndar Days: 4 -- Approved Reject Recommendations for C.O. Architect General Contractor Owner !0 • Modification hvpoW BwDrpotated into Cbmwe Order Nu\mbar. Attacbtasena: Sunrise Plumbing - proposal dwd 3113/92 --~ No scion will be taken mtardint this item unul we mceive wrium authorization dincdnt us to do so. All control work will procoed on ita normal schedule. PROPOSAL NO., z 0 rn rn rnrn 0C C M rn 0 S o �n MM E9 y z 0 n rn NiODMCATTON PROPOSAL Project: RENTON SENIOR HOUSING - JOB #315 Due: May 28, 1992 To: THE ORB ORGANIZATION, INC. Initiated b Architect �': IORTLEY COLE • ASSOCIAM, INC Sam I conUwWrs p.o. bvx 1179 Booz • nom t smohamish ' 9824o (2W stsas�s Modlikation Pmpoeal: Revise water main piping as indicated on attached diagram and Proposal Request 128: nrise Plumbing -2,766.00 SST on muerWs (S-1,660.04 X 8.2%) IW -136.12 NOTE: APPROVAL ACKNOWLEDGES PROPOSED ZfRISER DIAGRAM IS ACCWrABLE TO OWNER, ARCHMCT AND ENGINEER Subtotal . S-2,9112.12 Total S-2,902.12 . Ream for Modificadon: as per PROPOSAL REQUEST M Cots: Additional: $0.00 Credits: 52,902.12 Net: 5+2,902.12 Chime in Cakndar Days: 4 -- Approved Reject Recommendations for C.O. Architect General Contractor Owner !0 • Modification hvpoW BwDrpotated into Cbmwe Order Nu\mbar. Attacbtasena: Sunrise Plumbing - proposal dwd 3113/92 --~ No scion will be taken mtardint this item unul we mceive wrium authorization dincdnt us to do so. All control work will procoed on ita normal schedule. PROPOSAL NO., z 0 rn rn rnrn 0C C M rn 0 S o �n MM E9 y z 0 n rn IORTLEY-COLE ASSOCIATES, INC, 1002. Ift Surcm P.o, Ou 1179. SeoJwa ". WA 9t29D rbaw (206) S61l-7173/FAX (206) M&7919 May 15, 1992 SUBISUPPL.EM mlAaCCORF PROJECT: JOB NUMER: DESCRIPTION OF WORK: QUAis tm rm FORM ONLY Wmw SUNRISE PLUMBING, INC. 1415 - 22nd Street NW Auburn, WA 98MI Project Estimator RENTON SENIOR HOUSING 315 as per PROPOSAL REQUEST M, atut ed R SPOWAY: "'� FRIDAY, -MAY 22, Wdi MAY 1 8 M ; t n ti li li� i MAY a 1 ic92 HIRTLEY - COLE ASSOCIATES TOTAL AMOUNT C11 -i t t 1761.1, .ea CONTRACT TIME REQUEST DAY nW rROY408 . A"as TV& Cosa WVOLVIM LNC=t*fG A:lY cosh or DELAM D.M1cAM wmCa MAY OCCVR num MAYS AND AUTHORIZED SIGNATURE. DATE: SIGNED: D_ERA E SAGER z 0 m -4-n vm mg m OC: m m 0 cZ 0 �+ mm CA oFn m(n �v z z 0 5 m C:� 1• d i TOTAL AMOUNT C11 -i t t 1761.1, .ea CONTRACT TIME REQUEST DAY nW rROY408 . A"as TV& Cosa WVOLVIM LNC=t*fG A:lY cosh or DELAM D.M1cAM wmCa MAY OCCVR num MAYS AND AUTHORIZED SIGNATURE. DATE: SIGNED: D_ERA E SAGER z 0 m -4-n vm mg m OC: m m 0 cZ 0 �+ mm CA oFn m(n �v z z 0 5 m C:� May 13, 1992 Kirtley-Cote Associates, Inc. 1002 10th Snohomish, WA 98290 Attn: Greg Brimhall RE: Proposal for resiued crater main on first floor only. Dear Greg, All calculations for mater main sizing are based an 1991 Uniform Plumbing Code tables 10-1 and 10-2. These tables allow for sizing of tauter mains in a building of this nature without further engineering requirements. Static water pressure at the site of 75 lbs. allots the use of the pressure range chart of over 60 psi, table 1042 at the 400 foot length. Elimination of second and third floor water mains not only will result in a monetary savings to the owner of ,2,766.00 but also free up greatly needed apace in soffited second and third floor hallway ceilings for sprinkler piping and other trades. Sincerely, Casey Wintler General 3sperintendent Sunrise Plumbing, Inc. CW/kr Z 0 n m x Z 0 4 0 M TAKE f" IV Y / tC aa1eIf111r Mf1!l-48 %"fr /liar SMMM@ liniir d W FIXT rw Pdall /�7M�-Dli�i/11 Ems Miw Mr�Ylrryf r/�n. her O= Bar skit _.. __ _ r w r r i1i 7r. aM >M w !M /N s Na 1N1 all.ems �Iaif�/ �r 6141 4 P � p/Ir w 10 • . 'r Ir .• r r r ar+1l..aarl.r�l.41par1el.at.ud 1 18 N N A A IS r 1 el 1. P�•.17F1r1 fr s# WON 7! ! A 16 N N V M K t/ • w /s- n i 8111 1 i lrf�ilfr� •� 41 r 1 N, Y N *6w N 30 O w 71a rR+ r r r r r M la 1r ,r r r r r v r r M/! r I a/ M. to or Y w 1 s w M ".r: "M w a a! s a a Ftp 04 %1 N1 /M 1N It] N M R ■ 1I ar a r v 1a Ia .! w 1 a a a 1 1 FIM ii 1041 r >t N 11 N Ta 11 II II y\ /-1� taw ri • R /1 I! 7• 1 !1 f/ a /1 u fl 11 Dir ata as aq III ►r +.! Ir +w rN « w v warr as ar s r si a s — ! I•.! .N ata Ma 1a r a1 v >t at ar a al M1 r tMnal W ! >r ug >w 11! is In IV I'm ad a n u N M ff �1r r�i fw nr r 20 iri rr rr M ! �! rt MIM a.r M 1N M. 1M ta. r 11 *Is, it M rt M M q 41411 41A fr41 Mla MM Nr 11a tN to tfI IV Y / tC aa1eIf111r Mf1!l-48 %"fr /liar SMMM@ liniir d W rO* Pdall wrr.l.r.. Ems Miw Mr�Ylrryf r/�n. her Mr.rw.�.1 Bar skit _.. __ _ r w r r i1i 7r. aM >M w !M /N s Na 1N1 all.ems �Iaif�/ �r 6141 4 P � p/Ir w 10 r1 10a1 I/ 11 w 1r r r r r 'r Ir .• r r r ar 1 18 N N A A IS r 1 el 1. 11 >• 1 1 7! ! A 16 N N V M K t/ u 10 / / r A 1•M. 1 N, Y N *6w N 30 O M a b I► N Ida "M n it 7a 14 N O 411 1. IS rM a/ M. to or Y Ftp 144 MI 41 t/. Irl ii 111 r I/ M r 41I Ma N MM U a Ftp 04 %1 N1 /M 1N It] N M R ■ a M. N an10 .M f» I.a I10 fI0 .li ti9 iM IN M a M 3M of fra !w Mlr 1t/ rM in us IN tlr of 11f 110 M a a K r. at/ Mr fir on M as ..r .r. N/ Dir ata as aq III MMlnsrlaL rwfma- om r p ftafte — i0 tMnal M.r,._rtrr.rMg%rFed W004 *+*�iM�*•1 �1r r�i fw nr r 20 iri rr rr aN M Mr MIM Mn 1r �qr i A� 111 07""if a0It w 1 r Ir r r r" r r r r r A I a N r a A M A M h n N u p Q11 1 . ! >i >• a/ a M N !i a1 10 M a /1 a 11 1 1 -VI A A 7p 1r 7. a a.1 Mr a1 N r O : M 144 ik ex 0 A n# M M r M r M a as /0 r h Ftp Ftp tat 1M Irl 1M la. 11i 1N Itr r d a11 a a 41/ / Fa 111 1M rN Irl Ia. MIM Ir: Mw N 14 M M r K In p'r w we 1M Ma Ml: MM• /Ia IN 170; 10 M w 1 ! M1a Mai wr so /Ia sI! ala aN AM M C 1« rn 11/ H1 tra 1 8418 ONO" aN aa. M a:f ora So 410 rf a1 Mal MN M PF4610 rll. '�+�It+sllllt lr�l.p.gtq ar aNlr.lf r1..rlfwMf� TABLE WT tx+lf MMI Rt1ltA M CC1E TAKE 141SpluMmodRdm_ (Mlck dw C&WM Hd wW Coil WMv Dmm4 \c ; C liniir d Fir n tkit Pdall PW* Ems lilt UN Bar skit _.. __ _ 1 2 BW" (MMl Or +wE 4 am _ ---2 4 O�rntrll�aranpidar .,. _..�— 1 2 Hoseblab ar M aaok (1MndrNd...». ,—._» _ 3 5 Mob2. VIM ("ct* 6 4 Laundry kb or da2warrtw (oadf P* at 6WOO _ 2 4 [AMPINNY 1 2 Lamm" (dwftq Lf1Mr1 fgfls8fs ffp11. sfrdl hss� _.. / i &norsr (eadf IMrbj ..... , .......,..._..,..... , , . 2 4 Sink at dalwrtadle►r_..�___.«.._.__.......«_.........,,2 1 10 Sulk COTS V. dMUlMF "XVA t.%k sl (psdnw at Skala") ._ ... »....._... — i0 tMnal waa« dm.a! WSW MW� OJOSI! for k&T4 not bM.. !boort 1V11m1< be Ominpr11d a MgW rA*wjm drrffanft bur iA ua n!a Mss M7aef: 4 314 hath (19.1 mm) �» .........»._._. ,._.... i 1 kldf (25.4 fa" ,. _..__.. i 10 •SN fwbawdM m of Sachbn 1009 Aar Magiod of dit Aa w mwsuh r kNUNMOM 00*v TAbk 10 E \c ; C olp ' LI ! Lzal E-1 RV LW i31 i 2+1 �+ xq Xv F" + f4 11 o� y� 494 AIM r 4 � Ilk �IM%�/M► QwtrZ y , R y f Al sy 4LI 3Q Wti,7 lR 1 141i h dCh id f ¢ MIA L`! 06 f3 2" . i r ov v. Al fuaYJok 9,PA Is/ 103 /05 -AgfN 14fk %y fje I7 1 of 1! Z O VO4 21PW :ask r4 ,r3 " yrs i PROPOSAL REQUEST i}oportirns O++rnerx ©RB Form 302 Architect puri C.e Inati- Contractor project Name: Renton Senior Housing Date: April 16, 1992 project Address: 3151 NE 16th Street proposal Request No-- Twenty-one (21) Contractor Name XktW4ole Awotiates ORB project No.: 9007 & Address: Box 1179 %atmaish, W aIiingtott 98290 Contras For. General Construction Contras Date: October 31, 1991 please submit a breakdown of the proposed costs for modifie3uoru to the Contract Sum and/or Contract Time associated with the proposed changes in the Scope of Work and to the Contract DocumF�r+ts desaitibed below. This b not a Change Order or a Notice to proceed with the work described below. Description of proposed changes: LANDSCAPE CHANCES 1. General: This Modification proposal shall encompass all changeswere to the site drawings which we E sue 1 subsequent to bidding which were specifically excluded by Change Order 8 (ser Attachment 1 as listed in Change Order S)- A. Lawn Send: 1) Lawn: Lawn seed for arras designated in Sheet SD 9.1 - I1_&NnNG PLAN as 'lawn' shall retnatn as specifics in an 02f10o-1-ANDSC,IIpING EX T'T lawn arras called for at northwest corner of the site; northwest of detention pond shall be erosion seeded. A d 2) )lion -Teri reed reas far £rns[on Serdin :Arris shown on Sheet SD 9.1 - PLANTING PLAN designated as non -irrigated arras for etA seeding and the arra designated detention pond shall be seeded with the to be LAWN northwest of the te below elevation 337.4 and not MLMRE 1; EXCEPT the bottoms of the detention pond at the northwest corners o the ton seeding as called for on including the toad beds shall be seeded with WX URE 2; and, EXCEPT an teen rary $ Sheet SD 2-2 - -CONSTRUCTION SEQUENCE-, Note 10, shall be seeded with MIXTURE 3. Page i of 2 7,T in -t C� m0 —f O On C M M �Z O� M tin C3 orf 0 Fri KCn M0 z z O n M i}oportirns Percent Percent 0 W K i puri C.e Inati- MTXTUp,E 1 PERMANENT EROSION SEEIJI G30%95 so Kentucky bluegrass Aa( elpht 21rm-, Pilling) 40% 98 90 Creeping red trate pennlawn) 95 90 Perenrall rye 95ft or pennant MIXTURE 2. WETL ANM SEE[) MiYrURE 40% 98 90 Creeping red fe tae penntawn 30% 42 8o Red top 01Ldt, Alba) 3(M 40 80 6irdsfoot trtfod (to" Comicvlatus Apply this tnlxhtre at s rate of 601bs/acre with: Catud • (typhs tatilalta) tuber planted 18' OC Iris . (Iris p uda=n) tubers planted 24' OC l tardstem 6ttlhus(t . (airrus amtua) steatrned plants at 18' OC Sknt8h Sedge . (Cartx obnutu) plants at 18' OC MIXNRE 3 •TEMPORARY EROSION SEET)I*IG 10% Lhttch OU'. Clover 10% Colonial tient Grass 40% Perennial Rye Gras 40% Chewing or Creeping Red Fescue Page i of 2 7,T in -t C� m0 —f O On C M M �Z O� M tin C3 orf 0 Fri KCn M0 z z O n M PROPOSAL REQUEST ORB Form 302 b. Mantin4. Sall: Delete planting sal as speciflc`i in 5edian 0¢500 - L ANDSCAMNQ and add 'Notrimuldr' in its pLam e En2tnn 5esdin Delete Fara graph 3.04 ERMON SEEDING. and add the fOUawtng in its place: 3.04 EROSION SEEDNG A. Seeding should be done lmrriediately after final shaping and it is prcfaable that 11 be completed during the pertMis of Aprt1 1 through lune 30 and SeOembt7 1 through Odober 31. If planted between July 1 and August 31, the Contrmctot shall t e rrsporutbie for irrigation if requffe& B. Roughen rtrface of seed bed- Remove all exposed roots, debris and other fortign autcrials which protrude from the surfaac. including rocks larger than 1' in diameter. C Spread 1' topsoil over area to be needed. D. Evrnly apply seed mix at the rate of 3 pounds per 1„000 $F miles+ .-ith—ire spedflftt F' Apply comnwrdal ferdlim at the rate of 4 pounds per 1,000 SF un all ares.+ to be N-Aed.' NOTE Requtr menta for lawn installation in paragraph 3.03 mhali remain. d. AlEtrnlntrm Fd Sart . Delete ahaminurn edge strip whkh Is required between lawn and non -Irrigated arras for union seeding. z l.andsoL* Materials: P'rmide the Cost fex prom'idfng the differeme to landamps materials between the bid net and the set lanced subae quem to bidding. The Proposal shall include all Contractor(s) labor, material, overfrrad, profit, and all direst and/or indirect costs assocsated with that Chaurgr in Scope of work. list of attachments, if any, that describe above actions: T10N, INC. By: Page 2 of 2 I Z O F) m m m0 -4O OC C mmm A'4 CE. z cn in Fn N Z 0 n m MODIFICATION PROPOSAL KIRTLEY COLE i Project: RENTON SENIOR HOUSING - 1011 1315 ASSOCIATES, INC t„ Date: May 15, 1992 contractors p.o. box 1179 To: THE ORB ORGANIZATION 1002 - loth uwbomish WWA. 9ti290 Initiated by: Architect (2116) 566.3175 Modification Proposal: Provide landscape & irrigation changer as per Revised Site Drawings dated 11122/91 and Proposal Request 121: 11,264.60 0 Subtotal ............................. S L 1,264.60 Overhead do Profit a 15% 51,689.69 Bonding 0 2% ............. S259.09 Total .. .. $13,213.38 Reason for Modification: as per REVISED SITE DRAWINGS DATED 11/22/91 & P.R. 121 Cost: Additional: $13,213.38 Credits: S-0- Net: $13,213.38 Change in Calendar Days: TWO (2� ) Approved Reject Recommendation: for C.O. Architect General Contractor Owner 7 le Modiflcat€on Proposal h=rporaled into Change Order Number. Atiadtments: Olympic Unddertmund dt lansiycape . prtrpoaal dated 5114192 No action will be ukcn re` sding this item until we ro=ivc wr am autlwr cation diructing w to do so. All contra worm wW proceed on its normal schedule. pRppOSAL N4..L 5 m ma -10 OC �c mm O Z O -n ao� c(n N z O -1 n m ldden. $10-92