Loading...
HomeMy WebLinkAboutCO 16CHANGE ORDER Owner COR FarmArchitect (This form is to be executed in triplicate and each party is to retain an original.) Contractor Project Name: RENTON SENIOR HOUSING Date: July- 13, 1992 Project Address: 3151 NE 16th Street Change Order No.: Sixteen (16) Contractor Name: KIRTLEY-COLE ASSOCIATES ORP -t No.: COR (t No.: 9007 CAG 095-91 b Address 1002 - 10th Street Snohomish, Washington 98290 Contmc4, For. General Construction Contract Date: October 31, 1991 7 0 The Contract is hereby amended as follows: ti 1) Per ORB Proposal Request No. 36, 6/2/92 and Kirtley-Cole "Relocate m Modification Proposal No. 46, 6/24/92 (attached): _ range hood exhaust duct work at units 123, 125 and 127 and Add $ 150.14 in west wing handicap units." �m 2) Per Kirtley-Cole Modification Proposal No. 48, 6/25/92 and m 0 RF1 Na. 140, 6/17/92 (attached): "'French and install -40 0C power, phone and cable T.V. utilities to #1708 Kirkland Add $1,600.30rn m Avenue N.E." ?� a 3) Per ORB Proposal Request No. 32, 6/2/92 and Kirtley-Cole C X ModLfication Proposal No. 50, 6130/92 (attached): "Provide Add $1,427.33 � to plumbing revisions." jAdd TOTAL CONSTRUCTION COST IAIPACT OF THIS GRANGE ORDER: ..................................... $3,377.77 Order include all Contractors) labor, material, overhead, profit, and all direct andlor indirect casts associated n1 m N The Change shall © with the Change ;n Scope of Work. c I Con This Change Order is not valid unless signed by the Owner, Architect, and Contractor. _ i m Cn C) $4,620,765.00 Zr- i. The Original Contract Sum was...........................................................................................I....... 587,419.01 Net Change by previously authorized Change Order(s) was . ....................................................... 5 208, 184.01 -r The Contract Sum prior to this Change Order was....................................................................... i 3,377.77 i The Contract Sum will be revised by this Change Order in the amount of .................................... 5, 211, 561.78 1 z The new Contract Sum incorporating this Change Order will be ................................................... + 1 day g The Contract Time will be changed by .......................................... .......... .......................... *January 3, 1993 F En The Substantial Completion Date including this Change Order is - ........................................... .... 012 for TBD items. z *See Change order Sum or Contract Time , which have been approved 9 3 NOTE: The above summary does not Include any changes in the Contract by ORB Form 301 - Construction Change Directive or Owners Field Directives. rn THE ORB ORGANIZATION, INC. 607 SW Grady Way, Suite 210 Renton, Washington 98055 r, Date am, AIA KIRTLEY-COLE ASSOCIATES 1002 - 10111 Stmet Snohomish, Washington 98290 Y -41G. ordon Cale S uluc�' �L Date CITY OF RENTON, P b R DEPT 200 Mill Avenue South Renton, Washington 98055 Vincent Lee 4 D e MMMMMMMMMWM MODIFICATION PROPOSAL ' 1URT LEY COLE 0 project: RENT'ON SENIOR HOUSING - JOB 0315 AMOCIATES, INC W Date: June 24, 1992 caacrae�t►a p.a. box 1179 th To: THE ORS ORGANIZATION i 1002 - ltkh aoohomifh wuh. "290 Initiated by: Architect rzW 568-3175 Modliadoo proposal: Relocate range hood exhaust ductwork at Units 123, 125 and 127 to correct location of ranges as shown on architectural drawings. At west wing handicap units, install range hood exhaust ductwork to I correspond to range locations shown on architectural drawings: eo g Smith Air Conditioning 128.40 p Subtotal 5128.00 $19.20 Overhead do Profit ® 15% ao $2.94 Bonding a 2% ... ..... .... ... ... .... S150114 Total ... .... .. . d Re Lson for Modiiiicatiort: as per PROPOSAL REQUEST' +136 Com: Additional: 5154.14 Credits: $ 0- Na: Si50.14 w Ch&W In Calendar Days: -0- M Approved Reject Recommendation- tsar C.O. ,vaite:et General Contractor Owner Mo&r',mbon PropoW bated tato CbxW Order Number: 16 Attar: Smith Air ConditioWng - proposal dated 6115192 this item until we .006"e "mco u�Mbwrimtioa throating w to do ro. No action will be twlr� regarding g - � norsssa sehedvk. All canted work gillPM--dpRQPt3SAL NO. K�TLEY-COLE ASSOCIATES9 INC. 11102. 10th 9agwit.o. Box 1179, 3mbomii. WA 92290 PS1ar (306) 569-31751FAX OW 56167919 June 9, 1992 ('lYAW UM nO Fat'!+ OM.Y WHM sIr!!liT1'iM SUBISUPPIgR: SMITH AIR CONDITIONING, INC. 12459 Woodinville Drive Woodinville, WA 98072 ATTENTION: Project Estimator PROJECT: RENTON SENIOR HOT'.' -'NG JOB NUMBER: 315 DESCRIPTION OF JUN 16 1992 WORK: AS PFR PROPOSAL REQUEST 136, ATTACHED KIRTLEY•COLE ASSOCIATES RESPOND 'BY: By NO LATER THAN MONDAY, DUNE 15, 1942 ti.Vir TkAC T TIME REQUEST • Tffi3 WAY OCCU[ FAQ DtX.AYi VWFRaFOdAL R VWn All O! Tm com mvoLym �G AMY com Of MAn DAMAGit'M'�CJy AMY II NU MPEC1t Of AXS DQAY& AUTHORMm SIGNA �' nee DATE: SIGNED: